Korean-Automated Guideway Transit (K-AGT) was successfully developed through Light Rail System Development Project. Since then, the domestic development rate of on-board signalling system of light rail has been improved up to 90% by Practical Utilization Project of Light Rail. After utilization project, furthermore, POSCO ICT has developed the wayside signalling system of CBTC, including wireless communication equipment. KRRI carried out the performance test of the wireless communication, interfacing and using the other CBTC equipments of KyungSan Test Line so as to see whether it conforms IEEE 802.11x, international communication standard in view of operational concept of CBTC. In this paper, we presents the test plan, test items, and the analysis results of maximum communication distance tests between on-board and wayside radio sets.
Journal of the Korean Operations Research and Management Science Society
/
v.3
no.1
/
pp.57-67
/
1978
This paper reviews various models of technological innovations at different levels: project level and productive segment level. Firstly, it examines a number of significant factors influencing the success and failure of technological innovation at project level. Specifically, the role and characteristics of technical information for the success of innovation is analyzed. Secondly, the paper discusses in detail the relationship between technological innovation and the evolution of a firm. Product and process innovations are analyzed in accordance with a three stage model; the stages are performance maximizing (uncoordinated), sales maximizing (segmental) and cost minimizing (systemic). Various implications of the model are presented in terms of the business policy variables such as diversification, standardization, productivity improvement, marketing, etc. The applicability of the model to a developing country is sought and a few suggestions to develop new model of technological innovations in LDC are discussed.
Journal of Construction Engineering and Project Management
/
v.7
no.1
/
pp.30-36
/
2017
Most local agencies such as counties and small cities continuously express difficulties in making technically and financially defensible decisions on their pavement infrastructure maintenance and rehabilitation. Unlike pavement systems managed by state highway agencies, the total lane-miles of many local pavements are significantly short and they are managed by a limited number of staff who typically have multiple responsibilities. Most local agencies also do not have historical pavement performance data and the lack of a systematic decision making framework exacerbates the problem. A structured framework and an easily accessible decision support tool that reflects their local requirements, practices and operational conditions would greatly assist them in making consistent and defensible decisions. This study fills this gap by developing a systematic pavement treatment selection framework and a spreadsheet based tool for local agencies. It is expected that the proposed framework will significantly help local agencies to improve their pavement asset management practices at the project level.
Researchers, institutes, and government involved in research & development (R&D) are faced with the problem of performing R&D project evaluations. As a real-word case of evaluation, we elicited and reproduced the evaluation process of the national nuclear R&D projects, using a specific case study of Korea. In the methodology, the analytic hierarchy process (AHP) is employed to evaluate and rank the selected nuclear R&D projects which have a wide range of evaluation objectives and characteristics. As a result, we obtained relative ranking for research projects and importance of evaluation criteria. The method and implications can be easily understood and applied by practitioners since it follows naturally the standard practice of evaluating and relative comparisons of performance using evaluation procedures. By applying particular R&D project output to the procedures, project evaluators can compare and prioritize evaluation objectives.
Journal of the Korea Society of Computer and Information
/
v.24
no.6
/
pp.211-216
/
2019
Knowledge sharing is safe to say that we have already embarked on knowledge-based global economy where knowledge is a decisive factor in global competition for corporations. So in the age of knowledge-based management, it is how we use knowledge that decides success or failure for corporations and the competitiveness of their countries at large as well. We did this research with the help of those who were working in ICT industry including manufacturing, tourism, and others. In this research, we looked into how project participants, organizational characteristic, and relational characteristic affect knowledge sharing and utilization, and what are the factors that have positive effects on corporate success. And all the factors presented in the research are found to have positive effects on the knowledge sharing and utilization. The factors appeared to have positive effects starting with project at first and then on corporate success at large.
International conference on construction engineering and project management
/
2015.10a
/
pp.154-157
/
2015
Construction industry still requires a lot of laborers to perform a project despite of advance in technologies, and improving labor productivity is an important strategy for successful project management. Since repetitive construction works exhibits learning effect, understanding laborers' learning phenomenon therefore allows managers to have improved labor productivity. In this context, previous research efforts quantified individual laborer's learning effect, though numerous construction works are performed in group. In other words, previous research about labor learning assumed that sum of individual's productivity is same as group productivity. Also, managers in construction sites need understanding about group learning behavior for dealing with labor performance problem. To address these issues, the authors investigate what variables affect laborers' group level learning process and develop conceptual model as a basic tool of productivity estimation regarding group learning. Based on the result of this research, it is possible to understand forming mechanism of learning within the group level. Further, this research may contribute to maximizing laborers' productivity in construction sites.
Journal of Korean Society of Industrial and Systems Engineering
/
v.41
no.3
/
pp.72-82
/
2018
In this paper, we identify risk factors that are likely to occur during the lifecycle of a new product development (NPD) project from the literatures, and identify the three objectives or three constraints that will ultimately be achieved for project success in the ICT industry : performance (scope/quality), schedule (time), and cost. Firstly, we interviewed the project experts to classify the risk factors according that the final project objectives are changeable based on scope/quality, time and cost budget constraints. Secondly, the survey for pairwise comparisons between the risk factors was asked to the project managers and members who had ever actually participated in the NPD projects of ICT industry to determine the priority ranks on relative importance using AHP (Analytic Hierarchy Process). The risk factors negatively affecting the goals of projects were analyzed by using the AHP respectively in four project stages during the life cycle of the project. The comparison of risk factors within each stage is a different approach unlike the literatures which have covered project's overall risk assessment. There is an advantage that risk management can be effectively performed with priorities according to each stage from the start to the end of the project. In other words, it is necessary to identify what risk factors will occur in each stage, and to have ideas at each stage with the priorities so that they can be mitigated and eliminated before actual occurrence. As a result, risks on scope & quality changes were found to be the most important considerations for initiative stage of NPD projects in the ICT industry, whereas in the final stage, risks on schedule (time) changes were the most important priorities. Among the ICT industry product categories, 'communication and broadcasting devices' and 'IT and communication based devices' generally have a high priority in terms of risks on scope & quality changes when initiating the project. At the closing stage of the project, however, considering that schedule (time) changeable risk is getting higher, these products tend to target at B2B market rather than B2C because the new products must be delivered and launched in time as customer firm required.
Proceedings of the Computational Structural Engineering Institute Conference
/
1999.10a
/
pp.113-118
/
1999
The design program of fitting and thrust block including various shapes and sizes was developed for the GMR project (Great Man-made River Project in Lybia). It can automatically recalculated the minimum size of fitting required for the structural performance and can also determine the proper size of fitting for the safe and economic design by users. It was found that the results of this program was accurate and efficient when it was compared to other references. This program is also developed with GUI (Graphic User Interface) technology for the convenience of users.
International conference on construction engineering and project management
/
2009.05a
/
pp.1453-1462
/
2009
It is very important for performance of information system that we make an effort to raise user's satisfaction by continuously grasping user's requirement by evaluation of PMIS based on ASP service quality and reflecting this to information system. However, It is lack that developments of suitable evaluation index of PMIS based on ASP service quality. Hereupon, In this study, we propose the evaluation indicators. First, The evaluation area is classified by form the foundation of D & M IS Success Model (2003); system quality, information quality, service quality. Second, The detail evaluation item which include considerations which are gotten through investigation of the construction industry and PMIS based on ASP is grouping by form the foundation SERVQUAL which is a service quality evaluation tool proposed PZB(1988). It is suitable to evaluate PMIS based on ASP service quality in construction industry and able to evaluate various aspects.
International conference on construction engineering and project management
/
2009.05a
/
pp.935-941
/
2009
In competitive society, performance management is an essential element of business success. Despite the importance of performance management, it has not been widely implemented in construction companies. In the recent years, construction companies have become more aware of its need to identify, implement, and sustain performance improvements more systematically. Thus, the objective of this paper is to develop performance management system (PMS) for construction companies. The roles of performance management system is not only measuring performance but also offering guidance to improve performance. Therefore, PMS needs benchmarking process that provides Best Practice and new knowledge. This paper investigates the case of PMSs in UK, USA, Brazil, and Chile and discusses the lessons learned. To overcome the limitations of existing PMSs, new performance measurement framework, in form of 'Construction' BSC, is proposed. Based on the 'Construction' BSC, key performance indicators are derived and methodology of performance management is suggested. This paper concludes by developing PMS for benchmarking in construction companies and recommending some further directions on this research topic.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.