• 제목/요약/키워드: IT project performance

검색결과 1,413건 처리시간 0.028초

Success Factors of Highway Construction Projects in Egypt: AHP Approach

  • El-Maaty, Ahmed Ebrahim Abu;El-Hamrawy, Saad;Akal, Ahmed Yousry
    • Journal of Construction Engineering and Project Management
    • /
    • 제6권4호
    • /
    • pp.7-14
    • /
    • 2016
  • While the idea of the existence of a set of key factors for success in planning, designing and construction of projects is not new, it remains one of the most important issues in the field of construction management. This is due to project success factors are inputs to project management practice which can lead directly or indirectly to project success. This study identifies the success factors which can be used for improving the highway projects performance in Egypt during the project pre-construction and construction phases. Through a detailed literature review 35 success factors are identified. Furthermore, the AHP is adopted to prioritize the studied factors through the application of questionnaire survey. The study establishes that implementing an effective quality control and assurance systems, allow sufficient time for feasibility studies, design, drawing and tender preparation, effective cost control system and frequency of project budget updates, preparing adequate designs and drawings and determining sufficient time to implement the desired scope of work are the most important success factors for enhancing the highway projects performance in Egypt.

구획정리사업 부지내의 제척지 주거환경 실태 - 대구시를 중심으로 - (The Living Environments of Leave-out lands in the Land Readjustment Project Area - Focused on Daegu City -)

  • 김한수
    • 한국주거학회논문집
    • /
    • 제16권3호
    • /
    • pp.119-125
    • /
    • 2005
  • This study is designed to suggest future development guidelines for leave-out lands in the land readjustment project area. For this purpose, physical conditions which affect living conditions were surveyed. The findings are follows. First, the living conditions in the lands are low with shortage of parking space and green area, narrow and low-performance road conditions, disordered fence and roof. Furthermore, illegal waste disposal made the condition even worse. Second, it is desirable to make separated plan for the leave-out lands because they have quite different living conditions from those of the land readjustment project area. Third, it is suggested that urban planning and architectural laws should pay attention to the leave-out lands to improve living conditions. It is also recommended that planning obligations for the leave out land should be imposed on land developers.

DEVELOPMENT PROCESS OF INFORMATION FLOW RETRIEVAL SYSTEM FOR LARGE-SCALE CONSTRUCTION PROJECTS

  • Jinho Shin;Hyun-soo Lee ;Moonseo Park;Jung-ho Yu;Jungseok Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.556-560
    • /
    • 2011
  • Players of construction projects proceed with each work process by information gathering, modification and communication. Due to the complex and long-span lifecycle projects increased, it became more important to grasp this mechanism for the successful project performance in construction project. Hence, most project information management systems or knowledge management systems equip information retrieval system. There are two logic to infer the meaning of retrieval target; inductive reasoning and deductive reasoning. The former is based on metadata explaining the target and the later is based on relation between data. To infer the information flow, it is necessary to define the correlation between players and work processes. However, most established information retrieval systems are based on index search system and it is not focused on correlation between data but data itself. Thus, this research aims to research on process of information flow retrieval system for large-scale construction projects.

  • PDF

EPL을 활용한 프로그래밍 교육에서 문제해결 수준이 프로젝트 완성도에 미치는 영향 (The Impact of the Perceived Level of Problem Solving on the Performance of Project Completeness in Programming Education)

  • 장윤재;김자미;이원규
    • 컴퓨터교육학회논문지
    • /
    • 제14권6호
    • /
    • pp.41-51
    • /
    • 2011
  • 정보기술이 발전함에 따라 정보교육은 정보과학의 원리와 개념을 효과적으로 가르치기 위한 교육과정으로 개정되었다. 개정된 교육과정에 따라, 프로그래밍 언어를 활용한 알고리즘 사고 학습 및 문제해결능력 향상의 효과를 검증하는 연구들이 진행되고 있다. 그러나 학습자의 수준과 능력을 고려한 프로그래밍 교육에 대한 연구는 부족한 편이다. 따라서 본 연구는 대학교 3학년을 대상으로 학습자의 문제해결과정 각 단계가 프로젝트 완성도에 미치는 영향을 분석하였다. 문제해결 수준에 따른 프로젝트 완성도의 차이를 분석한 결과, 문제해결 수준이 높은 집단이 낮은 집단보다 프로젝트 완성도가 높은 것으로 나타났다. 문제해결과정 각 단계가 프로젝트 완성도에 미치는 영향을 분석한 결과, 문제발견 요인이 프로젝트 완성도에 유의미한 영향을 미치는 것으로 나타났다. 본 연구는 학습자의 프로젝트 완성도에 영향을 미치는 문제해결과정 단계를 탐색하여, 문제를 발견하는 활동과 반성적 성찰을 통한 문제해결 검토 과정이 중요함을 제안하였다.

  • PDF

Replacement of Normal Maize with Quality Protein Maize on Performance, Immune Response and Carcass Characteristics of Broiler Chickens

  • Panda, A.K.;Raju, M.V.L.N.;Rao, S.V. Rama;Lavanya, G.;Reddy, E. Pradeep Kumar;Sunder, G. Shyam
    • Asian-Australasian Journal of Animal Sciences
    • /
    • 제23권12호
    • /
    • pp.1626-1631
    • /
    • 2010
  • An experiment was conducted to evaluate the effect of dietary replacement of normal maize (NM) with quality protein maize (QPM) on performance, immune response and carcass characteristics of broiler (Krishibro) chickens. Six experimental diets were prepared separately for starter and finisher phases. Diet 1 was a control diet formulated with NM and soybean meal. In diets 2-5, the NM was replaced with QPM at 25, 50, 75 and 100%, respectively. Diet 6 was the same as the control diet, but supplemented with synthetic lysine similar to the industry standard. Each test diet was fed to 8 replicates, each of 5 chicks, reared in stainless steel battery brooders. The AME content of QPM (3382 kcal/kg) was similar to that of NM (3,352 kcal/kg), but protein (9.91 vs. 8.94%), lysine (0.40 vs. 0.26%) and tryptophan (0.09 vs. 0.07%) contents of QPM were higher than NM. Dietary replacement of NM with 50% QPM significantly (p<0.05) improved body weight gain, feed conversion ratio, humoral immune response, relative bursa weight, and breast muscle yield and lowered abdominal fat content. No further improvement in these parameters was recorded by increasing the level of replacement of NM with QPM to either 75% or 100%. Further, the improvement noticed in the 50% QPM group was similar to the group fed the NM diet with lysine supplementation, and thus dietary replacement of NM with QPM at 50% did not need extra synthetic lysine supplementation. It is concluded that dietary replacement of NM with QPM at the 50% level resulted in optimum performance, higher breast muscle yield and higher immune response in broiler chickens.

과학기술정보 관리·유통사업의 경제성 분석 모델 수립에 관한 연구 (A Study on Models of Economic Performance Analysis for Science and Technology Information Management Distribution Project)

  • 박성욱;이필우;한선화;이상환;황석원
    • 정보관리연구
    • /
    • 제43권3호
    • /
    • pp.43-59
    • /
    • 2012
  • 급변하는 환경변화에 대응하고 과학기술정보 관리 유통사업에 대한 연구수행의 효율화 및 성과 활용, 확산을 극대화하기 위해 경제성 분석 모델을 수립하였다. 과학기술정보 관리 유통사업은 일반적인 연구개발과 그 목적 자체가 다르다. 경제적 성과를 창출하기 위한 상업용 연구개발이 아닌 공공서비스 제공을 목적으로 한 연구개발이 대부분인 상황에서 경제적 성과를 분석하기 위한 경제성 분석 모델을 개발했다는 데 본 논문의 의의가 있다. 특히 이질적인 연구사업에 대한 경제성 분석 모형 및 절차적 방법론의 사전 구축을 통하여 향후 국가 과학기술정보 관리 유통사업에 대한 경제성 분석과 R&D 효율성 제고에 기여할 것으로 기대된다.

계약방식에 따른 건설프로젝트 성과의 비교분석 연구 - 실비정산방식과 총액계약방식을 중심으로 - (Impacts of Contract types on Construction Project Performance - Cost Reimbursable and Lump Sum -)

  • 이유섭;황본강
    • 한국건설관리학회논문집
    • /
    • 제8권2호
    • /
    • pp.155-163
    • /
    • 2007
  • 건설프로젝트를 수행하는 과정에 있어 계약당사자간에 다양한 계약방식에 기초하여 시설물 건설에 요구되는 업무 또는 서비스를 제공하고 있으나, 건설사업의 주요 성과지표라 할 수 있는 비용, 일정, 안전등의 측면에서 계약방식에 따라 발생할 수 있는 성과의 차이에 대한 실증적 인 비교연구는 미흡한 실정이다. 건설사업이 다수의 건설전문조직과 계약을 기반으로 운영되는 프로젝트라는 특성을 고려할 때 계약방식의 유형에 따라 사업성과에 대한 차이를 비교분석 함으로써 계약방식 선정에 대한 적정 의사결정을 지원하는데 유효한 자료를 제공할 수 있다. 이에 본 연구에서는 건설계약방식 중 실비정산방식과 총액계약방식을 대상으로 건설사업의 주요 성과에 대한 비교 분석을 시도하였다. 계약방식별 프로젝트 성과는 미국 Construction Industry Institute(CII)의 Benchmarking and Metrics(BM&M) 프로그램에서 활용하는 성과측정기준을 기초로 비용, 공정, 안전, 변경, 재작업(rework) 등 5개 분야를 대상으로 하였다. 또한 계약방식으로 인한 각종 성과지표의 차이가 통계적 의미를 지니고 있는가를 판단하기 위하여 통계적 기법인 t-test를 이용하여 데이터의 유의성을 분석하였다.

프로세스 성숙도 인증 여부에 따른 프로젝트 품질 성과 및 조직 성과 차이에 관한 탐색적 연구 : CMM 인증 및 비인증 조직을 중심으로 (An Exploratory Study on S/W Project Quality and Organizational Performance by Process Maturity Certification)

  • 문송철;김현수
    • 정보처리학회논문지D
    • /
    • 제11D권2호
    • /
    • pp.387-396
    • /
    • 2004
  • 최근 정보화 프로젝트 수행 능력에 대한 객관적인 검증이 필요하다는 판단에 따라 SI 업계에서는 프로젝트 품질 평가 심사 모형인 CMM 및 SPICE의 등급 인증 획득 또는 등급을 올리기 위한 노력을 기울이고 있다. 공공기관, 민간 발주처들이 사업자의 프로젝트 수행능력에 대한 객관적인 검증을 요구하고 있고, 해외 IT 업체들의 국내 시장 공략에도 효율적으로 대처할 수 있다는 판단에 따라 프로젝트 품질 평가 심사 모형 인증 도입이 확산되고 있다. 그러나 인증의 신뢰성에 대하여 논란이 되고 있는 시점에서 등급을 인증받은 기관이 비 인증기관보다 품질 및 성과에 차이를 보이는지 연구하였다. 연구 결과 현저하게 큰 차이는 아니며 부분적으로 차이가 있는 것으로 나타났다. 국내업체들이 CMM 인증 자체에만 집착하지 말고 컨설팅을 통한 업무 프로세스 개선과정에 의미를 두고 인증에 힘을 기울여야 한다. 즉, 품질인증의 획득 목표가 인증서 획득만이 목표가 아니라 진정한 프로젝트 품질 시스템의 구축, 실현하는 품질 마인드가 우선적으로 제고되어야 말 것이다.

작업 성과지표의 통계적 분석 방법에 관한 연구 (Statistical Analysis of Work Performance Indicator)

  • 문효기;유정호;김창덕
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.947-952
    • /
    • 2007
  • 건설 프로젝트는 개별공종으로 구성되며 개별공종은 개별작업으로 이루어지므로 개별작업의 성과는 프로젝트 성과에 영향을 주는 최소단위이다. 그러므로 개별 작업에 대한 체계적인 성과측정 및 평가가 이루어져야 한다. 그러나 기존 성과측정은 기업 또는 프로젝트 단위에서 성과측정만 주로 이루어지고 있고 개별 작업을 측정하는 국내 ${\cdot}$ 외 공사관리체계에서는 지표에 대한 분석 및 활용이 미흡하다. 따라서 본 연구에서는 개별 작업을 측정하기 위해 PPC(Percent Plan Complete)를 성과지표로 선정하였고 통계적 분석 방법을 통해 목표지향적인 작업관리와 지속적인 개선이 이루어 질 수 있도록 지표의 분석 방법을 제안하였다.

  • PDF

우주발사체 개발사업의 위험관리 프로세스 (A Process of the Risk Management for a Space Launch Vehicle R&D Project)

  • 조동현;유일상
    • 시스템엔지니어링학술지
    • /
    • 제12권2호
    • /
    • pp.19-27
    • /
    • 2016
  • Many countries concentrated on the space developments to enhance the national security and the people's quality of life. A space launch vehicle for accessing the space is a typical large complex system that is composed of the high-technology like high-performance, high-reliability, superhigh-pressure, etc. The project developing large complex system like space launcher is mostly conducted in the uncertain environment. To achieve a goal of the project, its success probability should be enhanced consistently by reducing its uncertainty during the life cycle: it's possible to reduce the project's uncertainty by performing the risk management (RM) that is a method for identifying and tracing potential risk factors in order to eliminate the risks of the project. In this paper, we introduce the risk management (RM) process applied for a Space Launch Vehicle R&D Project.