• Title/Summary/Keyword: IT project performance

Search Result 1,413, Processing Time 0.028 seconds

A Study on the Improvement of National R&D Project Performance Evaluation and Budgeting System

  • Kyunghwan, Park;Hyungwook, Sim;Seokki, Cha
    • Asian Journal of Innovation and Policy
    • /
    • v.11 no.3
    • /
    • pp.342-362
    • /
    • 2022
  • The national R&D project is a major strategy for the development of science and technology in the country. This is promoted for the purpose of improving the welfare of the people, such as creating jobs and fostering small and medium-sized enterprises, through the results of science and technology research conducted with support from the national budget. Therefore, analysis of the performance evaluation and budgeting system of the current national R&D project is one of the essential parts of preparing a system improvement plan. This study derived improvement plans through a comparative analysis of national R&D project performance evaluation and budget systems in Korea and leading countries such as the United States and Japan. As a result, it was confirmed that it may be difficult to derive innovative research results due to the lack of sustainability and a short period of time to require quantitative performance. To overcome these difficulties, the need for system improvement as follows was suggested. First, it is necessary to enlarge and prolong national R&D projects. Second, a plan for securing sustainability is needed in consideration of the main characteristics of each research field. Finally, it is necessary to strengthen the linkage between organizations in charge of national R&D projects. And also, there is a need for a system that can continuously identify problems and improve the system. In addition, the constitutional amendment will be necessary to separate science and technology from economic development, which states that Article 127, Paragraph 1, "Science and technology should be subordinated to economic development," which is the science and technology article of the current constitution.

Analysis of ABC Success Factors Affecting Construction Project Performance (건설프로젝트 성과에 영향을 미치는 ABC 성공요인 분석)

  • Shin, Young-Su;Cho, jin-Ho;Kim, Byung-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.3
    • /
    • pp.56-65
    • /
    • 2022
  • This study tried to identify the key success factors of ABC by identifying the influence of ABC's success factors on project performance and analyzing the moderating effect of communication. For this purpose, factors applicable to construction projects were extracted through case studies related to the success factors of ABC, an activity-based financial management technique. The survey method was conducted as an online survey method using the Delphi method. For statistical analysis, frequency analysis and factor analysis were performed with SPSS Statistic 20, and hypothesis testing was performed with SmartPLS 2.0. As a result of the analysis, it was found that linkage with quality initiatives affects not only ABC's success factors on project performance, but also communication moderation effects. It was confirmed that linkage and communication with quality initiatives are the most important key success factors for ABC's success. Based on the results of this study, it is expected that if ABC and quality management are well linked, it will be effective in improving project performance.

Measuring of the Performance of a Construction Management Project from Viewpoints of Project Participants -Focusing on Owner, Construction Manager, Designer and Constructor- (건설사업 참여주체(발주자, CMr, 설계자, 시공자) 관점에서 건설사업관리 성과측정에 관한 연구)

  • Ahn, Eun-Jin;Yoo, Byeong-Gi;Lee, Yoon-Sun;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.194-205
    • /
    • 2008
  • The production process of construction industry is different from thing of the general manufacturing, likewise various participants make temporary teamwork for success of the project through sharing of information. But, the each role of participants is Individually changed to step in construction process stage and moreover it has complicated, entangled interests. The CM(so it called Construction Management as an abbreviation word) system was inducted for the effective management and operation of construction project. The key of the CM success depends on the cooperative relationship relation to major participants. There are lots of studies and efforts for the performance measures of the CM, however existing performance index is only measured as the viewpoint of project owner. Therefore it needs to make up for balanced view through combination of the four-way view of participants. In this study, we should search for cooperative relationship of project participants, and then we should suggest to define the difference of project in their viewpoints.

A Study on the Effect of Satisfaction with R&D Projects on R&D Performance Satisfaction -For SMEs in Jeollanamdo-

  • Choi, Hong Wan;Kang, Min Jung
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.13 no.1
    • /
    • pp.11-19
    • /
    • 2021
  • The purpose of this study is to check whether the satisfaction of the R&D (Research & Development) project directly affects the R&D performance, and to find out whether the satisfaction with regional connectivity and the satisfaction with the R&D operation management significantly mediate the relationship that the satisfaction with the R&D project has on the R&D performance. In order to verify the research hypothesis on this, a total of 51 companies located in Jeollanam-do that actually conducted R&D research projects were surveyed and analyzed. In order to conduct an empirical study based on the collected questionnaire, a survey questionnaire related to the variables of the study model was composed based on a sample of 51 questionnaires. We used the SPSS program to verify the hypotheses in this study, and the hypotheses were verified by analyzing the validity, reliability, correlation, and deflection. As a result, there was a positive (+) significant relationship between R&D project satisfaction and R&D performance. In addition, it was found that the relationship between R&D project satisfaction and R&D performance was significantly mediated by the satisfaction with R&D regional connectivity and satisfaction with R&D project operation management.

The Effect of Project Complexity, Team Members' Structure, and Process Index on Efficiency of System Integration Projects

  • Hong, Han-Kuk;Park, Chul-Jae;Leem, Byung-Hak
    • Journal of information and communication convergence engineering
    • /
    • v.6 no.3
    • /
    • pp.323-326
    • /
    • 2008
  • Data Envelopment Analysis (DEA) is a theoretically sound framework for performance analysis that offers many advantages over traditional methods such as performance ratios and regression analysis. Largely the result of multidisciplinary research during the last three decades in economics, engineering and management, DEA is best described as an effective new way of visualizing and analyzing performance data. Besides, overseas information technology companies have aggressively tried to enter the domestic market. In the age of globalization and high competition, it is imperative that the system integration (SI) companies need to introduce the performance evaluation models of SI projects, including Capability Maturity Model and Software Process Improvement and Capability Determination, to gain a competitive advantage. Therefore, it makes our research regarding evaluation of SI projects very opportune. The purpose of the study is not only to evaluate efficiency of each project by DEA but also to gain insight into various factors such as project complexity, team members' man-months structure, and process index(project management index) that link to the projects performance.

Quantitative Analysis of Magnitude of Rework by Project Types and Sources of Rework

  • Hwang, Bon-Gang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.202-211
    • /
    • 2006
  • Rework in the construction industry can adversely affect project cost and schedule performance. Based on direct rework costs recorded on 359 construction projects, this paper presents an assessment of the magnitude of rework by various types of projects and sources of rework. The results from this paper establish that on average 4.5% and 2.5% of actual construction costs were spent on rework for owner and contractor projects, respectively. Furthermore, this paper determines that the direct rework costs differ by project types and sources of rework. Finally, it permits the development of rework reduction initiatives. By quantifying and recognizing the different magnitude of rework, the industry can be aware of the waste from rework and develop effective plans for managing rework, ultimately improving project cost performance.

Evaluation Method of Technology Development Project based on Decomposition Approach and Options Thinking (분해접근과 옵션사고에 기반한 기술개발 프로젝트의 평가방법)

  • Cho Kyu-Kab;Moon Byung-Keun
    • Journal of Korea Technology Innovation Society
    • /
    • v.8 no.3
    • /
    • pp.1117-1138
    • /
    • 2005
  • Due to the increasing importance of technology development project evaluation, many evaluation methods have been developed. However, most project evaluation methods are not directly applicable for evaluating performance improvement projects in a manufacturing system. It is due to the fact that the existing project evaluation methods do not deal with the performance evaluation of the system. This paper deals with performance measurement model of a manufacturing system based on decomposition method and evaluation method for technology development project based on options thinking. A case example is discussed to illustrate the process of the proposed evaluation method.

  • PDF

A Descriptive Analysis of Project Participants' Perception about Complaint in Public Construction Projects

  • Lee, Changjun;Lee, Ju-Hui;Yun, Sungmin;Han, Seung Heon
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.111-118
    • /
    • 2022
  • Conflicts in public construction projects become more serious and complex so that they have a negative effect on performance of projecets. Conflicts in public construction projects are defined as expanding in complaints. This study analyzes the relationship structure and effect on performance between complaints and conflicts. First of all, 219 survey data collected from industry experts were used to derive complaints arising from the project and to understand the characteristics of each complaint. In the case of environmental damages, rather than environmental damage during construction, harmful substances or effects that can occur in completed facilities cause complaints from local residents, and opposition from environmental groups has a great effect on time and cost increase. As for safety damage, civil complaints related to prevention and countermeasures for safety accidents occur frequently, and additional construction affects cost increases. Through this study, it is possible to understand the serious complaints that are prone to conflict in public construction projects, their frequency, and the performance of the project.

  • PDF

A WEB-BASED PROJECT MANAGEMENT SYSTEM FOR GOVERNMENT R&D PROGRAMS (국가 연구개발을 위한 웹기반의 과제관리 시스템)

  • 손권중
    • Proceedings of the Technology Innovation Conference
    • /
    • 2003.06a
    • /
    • pp.108-115
    • /
    • 2003
  • Government R&D Project Management in Korea has had considerable difficulties because of the lack of project monitoring systems and insufficient communication. The National Program for Tera-level Nanodevices (TND Program) is a ten-year R&D program for commercialization in the area of nano technology. Collaboration and communication among the various participants such as business companies, universities, and government R&D institutes are key success factors in this R&D program. TND Program office has developed a Web-based project management system. This system consists of mostly four sub-management functions: (1) Milestones management of all R&D projects; (2) DR (Design Review) management as the mechanism for checking the performance against milestones; (3) Project activity management using the WBS (Work Breakdown Structure); (4) Budget management. Additionally, it also has many R&D supporting functions such as technology information bulletin board, community management, and visual summary of project progress and performance. This system is effective for monitoring research project as well as measuring project performance of the overall research program. This Web-based system has become the useful tool of R&D moving target mechanism and effective communication and collaboration tool. System features and adoption process of the system are also suggested.

  • PDF

A Study on the Factors Affecting IT Project Performance: Focusing on the Results of K-PART of Central Government (정보화사업 성과 영향 요인 분석: 중앙행정기관 정보화사업 평가결과를 중심으로)

  • Jeong A Choi
    • Informatization Policy
    • /
    • v.30 no.1
    • /
    • pp.23-40
    • /
    • 2023
  • Currently, the Ministry of Strategy and Finance operates performance evaluation of the IT projects of the central government. Recently, with the advent of the Digital New Deal and the Digital Platform Government, the budget for IT projects has significantly increased, leading to a higher level of interest in their performance. In this study, performance-related characteristics were selected through previous research, and an empirical analysis was conducted to examine whether there are actual differences in the performance of IT projects given respective characteristics. As a result of the analysis, new projects and others performed by departments or offices had a statistically significant positive effect on each final evaluation score. In contrast, IT support as well as fund-based projects had a statistically significant negative effect on each final evaluation score. This study suggests that when evaluating the performance of IT projects in the future, it is important to consider the unique characteristics of each project, as these may contribute to respective differences in performance.