• Title/Summary/Keyword: IT in Construction

Search Result 21,767, Processing Time 0.052 seconds

Bim Strategy Plan through Domestic Construction Companies BIM Project Case Analysis - focused on the BIM USE of the project from 2009 to 2015 - (국내 건설회사 BIM 프로젝트의 사례 분석을 통한 BIM전략 수립 방안 - 2009년부터 2015년까지 프로젝트의 BIM Use를 중심으로 -)

  • Jo, Yong-Hyun;Lee, Joo-Sung;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.6 no.2
    • /
    • pp.1-11
    • /
    • 2016
  • In South Korea, there have been attempts to enhance BIM work practices in various aspects. Public Procurement Service(PPS) has recently published 'basic guidelines to improve BIM work practices in construction and facility management'. It defines roles and responsibilities of project members in their application of BIM. It also developed a set of modelling standards and guidelines for effective model creation, management and communication among BIM users. Moreover, numerous construction companies have tried to cultivate BIM specialized manpower throughout entire construction phases. However, there are still challenges faced by firms during BIM adoption. Therefore, this study aims to provide practical counsel for construction companies to help them create optimized facilities and deliver high performance by analyzing BIM-based domestic construction projects in Korea from 2009 and 2015. The study will investigate types of client, project, BIM application range, and application technology.

Standard Establishment Model for Value Engineering Work in Construction Projects (건설 프로젝트 VE업무 기준 수립 모델)

  • Kim, Soo-Yong;In, Chi-Sung;Yang, Jin-Kook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.483-486
    • /
    • 2006
  • The value engineering(VE) in construction projects is systematic method which improve quality as well as reduction input cost and as construction VE work extends the range of application, the importance is rising. For this reason studies are needed to enforce design value engineering work systemically and effectively. In this study, we analyzed the problem of the present construction VE processing and deduced the model to be most suitable the work efficiency. As suggested model reflects systemically requirement item of owner and user, it will make approaching direction and standard establishment possible. So it will increase the following function analysis in analyzing step and the effectiveness of creating idea and make successful VE result.

  • PDF

A Study on the Effect of the Application of Safety Patrol Management System(SPMS) upon the Worker's Way of Thinking & Disasters in Construction Site (전문 안전 순찰 관리시스템(SPMS)이 건설 현장의 재해 및 근로자의 의식구조 변화에 미치는 영향에 관한 연구)

  • Yoon, Yeo-Chan;Chung, Kwang-Seop;Kim, Young Il;Kim, Ji-Hoon;Kim, Sung-Min
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.4
    • /
    • pp.31-40
    • /
    • 2014
  • While Korea had achieved radical growth of construction industry, it also had accumulated problems in material, human and economical loss due to its low quality of safety level. Therefore, not only enterprises but also the nation is putting in a great deal of efforts for construction safety. However, its effect is not satisfiable. This research aims for change of construction cite by introduction of professional Safety Patrol Management System(SPMS) and consideration of its necessity. To consideration of its necessity, we compared and anaylzed average numbers of indicated dangers and safety accident incidences in each construction cites and we researched changes in worker's safety sense. It will establish the suitable design standards and suggest the basic database for estimating disaster and accident ratio.

Agent-based Lift-car Group Operation Optimization Model in High-rise Building Construction

  • Jung, Minhyuk;Park, Moonseo;Lee, Hyun-soo;Hyun, Hosang
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.221-225
    • /
    • 2015
  • To hoist construction workers to their working space is directly related to the productivity of building construction since hoisting tasks are carried out during the working time. In order to reduce hoisting time in the condition that the number of construction lift-cars is limited, various types of the lift-cars group operation plans such as zoning and sky-lobby have been applied. However, previous researches on them cannot be compared in the performance due to their methodological limitation, discrete-event simulation methods, and cannot be find better solution to increase the performance. Therefore, this research proposed the simulation-based optimization model combining the agent-based simulation method to the scatter search optimization methods. Using the proposed model, this paper carried out the comparison analysis on the performance of typical operation plans and also optimize an operation plans by controlling the service range of lift-cars, the size and number of service zones. In this case study, it is verified that better alternatives than typical operation plans can be exists and it is possible to increase the productivity of building construction.

  • PDF

How to Use Standard Market Prices for Ordinary Management System of Construction Equipment Prices in Poom-Saem (시가표준액을 활용한 건설공사표준품셈 건설기계가격 상시관리 방안)

  • Ahn, Bang-Ryul;Huh, Youngki;Kim, Dae Young;Tae, Yong-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.98-99
    • /
    • 2014
  • Construction equipment cost is critical to estimate the total construction costs, particularly in large and complicated projects. Despite its importance, the construction equipment cost may not reflect the current market value since the equipment database is being updated every 6 years at most. To keep construction equipment cost up to date, it is highly recommended to use the standard market price that is reported each year by the Ministry of Security and Public Administration (MOSPA). However, there is still a gap to adopt the standard market price system for the construction equipment cost computing system. Therefore, this paper suggests an effective way to develop a construction equipment cost estimation system.

  • PDF

A Study on the Necessity for the Standardization of Information Classification System about Construction Products

  • Hong, Simhee;Yu, Jung-ho
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.121-123
    • /
    • 2017
  • The widespread dissemination of the green building certification system has led to the ongoing development of information management technologies with the aim to effectively utilize construction product information. Among them, a data crawling technology enables to collect the data conveniently and to manage large volumes of construction product information in Korea and overseas. However, without a standardized classification system, it is difficult to efficiently utilize information, and problems such as an additional work for classifying information or information-sharing errors. Therefore, this study suggests to present a necessity for the standardization of the information classification system through expert interviews, and to compare construction product classification systems in Korea and overseas. This study is expected to present a necessity for the effective management of construction product information and the standardization of information-sharing with regard to various construction certifications.

  • PDF

Health Hazardous Substances in Construction Work in Korea (건설업 근로자의 유해 작업 환경 노출 실태에 관한 연구)

  • Choi, Jae-Wook;Mun, Jung-Soo;Kim, Jeong-Ah;Won, Jeong-Il;Park, Hee-Chan
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.10 no.1
    • /
    • pp.74-92
    • /
    • 2000
  • This study was performed to evaluate the working conditions In construction workers through measurements of working environments and to improve the working conditions and to design the appropriate environmental and health management system. The results of measurement for working environments in construction work are as following: 1. The excess rate of noise and dust concentration in express highway construction, road construction, building construction and interior painting was 28.6% and 24.5% respectively. 2. The excess rate of mixed organic solvents concentration in interior painting was 39.3%. 3. The chain type bulldozer has the highest level of vibration; the excess rate was 85.7%, and among the vibration instruments, the level of left hand's vibration of all vibrators exceeded the criterion and in the case of drilling all the level of vibration exceeded the criterion in both hands. On the basis of the results in this research the environmental and health management system for construction workers must be considered. Therefore, it is necessary to be introduced the special medical examination and measurement of working environments in construction industry. In defining "the working place" of Article 39 of Enforcement regulations of industrial safety and health act, the word "indoors" should be deleted. Then the eligible industry for measurement of working environment must be extended. And it is also necessary for construction industry to be performed group health management service by agencies such as other manufacturing industry.

  • PDF

A Study on the Relative Importance of Quality Management Items through the Defect Analysis in the Landscape Construction Process (조경시설공사의 시공품질 분석을 통한 품질관리항목의 중요도 연구)

  • 이상석;최기수
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.25 no.3
    • /
    • pp.1-11
    • /
    • 1997
  • This study aims to estimate the relative importance of quality management items through the defect analysis in the landscape construction process. The RIQMI are decided by the defect coefficient and it's cause weight. The defect items in the landscape construction process were classified by 56 items based on the classification form of '96 landscape architectural construction standard and the cause pattern were categorized 4 types as design, material, construction, and environment factors. To analyze the defect coefficient and the aucse weight by defect, the researcher surveyed the questionnaires on the 103 engineers and the 31 experts on the landscape architectural construction. The result of this study are as follows. The relative importance by facilities pattern turn out to be much higher construction, material fator than design. environment factor in wood facilities, paving facilities, and steel facilities, the RIQMI is very high in timber crack, timber vending, faulty of timber against decay, welding faulty of steel facilities in material factor, and timber crack, faulty of timber against decay, finish faulty of steel facilities, welding faulty of steel facilities in construction factor.

  • PDF

Modeling Laborers' Learning Processes in Construction: Focusing on Group Learning

  • Lee, Bogyeong;Lee, Hyun-Soo;Park, Moonseo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.154-157
    • /
    • 2015
  • Construction industry still requires a lot of laborers to perform a project despite of advance in technologies, and improving labor productivity is an important strategy for successful project management. Since repetitive construction works exhibits learning effect, understanding laborers' learning phenomenon therefore allows managers to have improved labor productivity. In this context, previous research efforts quantified individual laborer's learning effect, though numerous construction works are performed in group. In other words, previous research about labor learning assumed that sum of individual's productivity is same as group productivity. Also, managers in construction sites need understanding about group learning behavior for dealing with labor performance problem. To address these issues, the authors investigate what variables affect laborers' group level learning process and develop conceptual model as a basic tool of productivity estimation regarding group learning. Based on the result of this research, it is possible to understand forming mechanism of learning within the group level. Further, this research may contribute to maximizing laborers' productivity in construction sites.

  • PDF

A Study on the Construction Equipment Management System for Strengthening Global Competitiveness (건설기계산업의 선진화를 위한 관리체계의 개선 방안)

  • Lee, Jun-Bok;Kim, Sung-Keun;Seo, Jong-Won;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.55-65
    • /
    • 2008
  • It is increasingly recognized that the construction equipment play an important role as resources in construction process. The number of registered construction equipment in korea is over 320,000 according to the statistics. It is obvious that the machine-intensive construction method achieves productivity and quality improvement as well as safety. The main objective of this paper is to propose improvement plans for construction equipment management system in terms of scope, registration, inspection, rental business, operating licenses, and etc., which are the major issues described in the Construction Equipment Management Law. In order to satisfy the objective, this research conduct survey and interview with experts, and literature review on domestic and overseas related laws and regulations. The results of the research are about 20 issues for improvement plans for the better management system, so the further in-depth study on each issue will be recommended for the practical application to the law.