Top-down 공법 현장에서 엘리베이터 코어월 정밀 시공을 위한 시공 BIM의 적용 사례 연구 (Case Study of the Field-BIM for Precision Construction of Elevator Core Wall in Top-down Project)

  • 심학보;석원균;박순전
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 추계 학술논문 발표대회
    • /
    • pp.108-109
    • /
    • 2019
  • Top-down construction is a useful method of utilizing the working space, economic benefits and shorten the construction period. Precision construction of the elevator core is very important for safety of the top-down structure. In this study, the layout system for the field-BIM(Building Information Modeling) was used to precisely construct the elevator core in the basement and the ground. Through the layout system, it was possible to process the construction status, review the design results and construction errors, and confirm whether there is or not within the construction error range for elevator installation.

  • PDF

INTERNATIONAL COMPARATIVE STUDY ON "KOUJI-KANRI (CONSTRUCTION SUPERVISION)" AS CONSTRUCTION CONFORMATION

  • Takashi Saito;Shuzo Furusaka;Takashi Kaneta
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.452-458
    • /
    • 2005
  • The Japanese construction industry has faced on lack of quality that is one of the strong confidence fields. It is said that the main reason of this trend is in the case of construction supervisor's defects. But real problems are both the degree of drawing's completion and design activities in construction phase by architect. The purpose of this paper examines that the role of construction supervisor in Japan is changing to the management field and construction conformation, based on the analysis of the WBS based on international comparison among Korea, China, the UK, the US, and Japan.

  • PDF

A Study on Client's Decision-Making in Construction Phase of Building Projects in Japan

  • Tamura, Atsushi;Kaneta, Takashi;Furusaka, Shuzo
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.183-191
    • /
    • 2017
  • In building project, client needs to decide many things, and clients cooperate with architects, supervisors, general contractors and other consultants. Especially in construction phase, clients often make a decision. However, client's decision-making in construction phase often makes some kinds of risk. This paper aims to clarify the reality of client's decision-making in construction phase. First, client's decision-making is defined by laws and standards. Second, the questionnaire revealed the current status of client's decision-making in 4 works. Third, Fishbone diagram shows the factors of client's decision-making in four works. Finally, it was modeled how client's decision-making in construction phase affects the post-process of 4 works.

  • PDF

얕은 연못에서 수위변동에 따른 담수 어류 피난처 확보를 위한 실험적 접근 (An Experimental Approach to Secure Freshwater Fish Shelter according to the Water Level Fluctuations in a Shallow Pond)

  • 안창혁;주진철;이새로미;오주현;안호상;송호면
    • 대한환경공학회지
    • /
    • 제35권9호
    • /
    • pp.666-674
    • /
    • 2013
  • 담수생태계에서 갈수기가 지속되면 다양한 물리적 장애가 발생한다. 이 시기는 어류의 생태 유지용수가 부족하여, 이동이 일어남에 따라 새로운 피난처 및 서식처가 요구된다. 이러한 문제를 해결하기 위해 본 연구에서는 실증규모의 실험시설을 구축하였으며, 수위변화와 어류 피난처의 관계를 분석하였다. ADP (artificial deep pool)는 본 연구에서 제안된 인공적인 깊은 웅덩이이다. 본 시설을 실증규모의 test-bed 실험구에 적용하여 모니터링 한 결과, 수위변화에 따른 어류 개체수는 실험연못의 수심 0.5 m에서 가장 높게 나타났다. 하지만 ADP에서는 낮은 외부 수위 조건(<0.3 m)에서 단위면적당 어류 개체수가 증가하였고, 실험구의 총 어류 군집을 보존하는데 기여하였다. 또한, ADP 내부의 수온과 DO는 외부보다 낮게 조성되었지만, 어류는 지속적으로 서식하였다. 이 결과와 관련하여, ADP 내부는 WCS, OS, SS, TS 등이 높은 효율적인 정수생태계임을 나타내었다. 더욱이, ADP 내부의 종풍부도는 Acheilognathus koreensis (A. koreensis), Carassius carassius (C. carassius)와 같은 WCS가 높은 비율로 측정되었다. 결국, 수위가 낮게 형성되는 동안 어류는 서식환경의 교란에 의해 수심이 깊은 곳으로 피난하였고, 본 연구 결과를 종합하여 볼 때, ADP는 정수생태계에 적합한 어류 피난 및 서식처로 활용이 가능함을 시사하였다.

지하건설공사의 작업환경 개선에 관한 연구 -환기와 조명을 중심으로- (A Study on the improvement of working condition in the downtown Underground construction - Focused on the Ventilation and Lighting -)

  • 고성석;안홍섭
    • 한국안전학회지
    • /
    • 제12권2호
    • /
    • pp.119-132
    • /
    • 1997
  • According to the construction environmental changes due to the trend of large scale and complicated building construction, many construction methods(such as : TOPDOWN )are more often used. However, it is pointed out that occupational pulmonary diseases, reduction of the machinery lifetime and productivity caused to be narrow visual field and collision between the workers. Therefore, this study is mainly dealing with the views of productivity and safety improvement in order to improve work efficiency and to insure the safety in underground construction environment.

  • PDF

국내 골프장 연못의 방수기술 (Water-Proof Technology for Water Hazard in Golf Course in Korea)

  • 김원조;이인환;이재필;김두환
    • 아시안잔디학회지
    • /
    • 제18권2호
    • /
    • pp.77-95
    • /
    • 2004
  • This study was conducted to find out definition, specification and characteristics of water-proof method for pond at golf courses that located in the mountain in Korea. Water-proof method of pond was selected by location, kind of soil, area, depth, cost, construction period and so on. 1. Soil Bentonite Sealing Liner(SBL) is to mix soil with a good quality bentonite. Then the mixed material was dressed on the bottom of pond. $\\$Merit of SBL is to purify the water and planting is possible. It can also reduce construction period and is economical. It's easy to find out the leak points. Demerit of SBL is expensive, if good quality soil is not in constructing site. Shape of pond edge is simple. 2. Ethylen Propylene Diene Monomer Sheef(EPDM-Sheet) makes use of sheet that resists to acid and alkaline. EPDM-Sheet spreads out as a mat on the pond for water-proof. Merit of EPDM-Sheet is to perfectly prove water and make a diverse shape of pond edge. Demerit of EPDM-Sheet is not friendly to environment. It needs drain system, air ventilation and long period of construction. It is also difficult to find out leaking points in this method. 3. Water proof of ESS-13 uses ESS-13 that is resin of vegetable matter and friendly to environment. To prove water of pond, ESS-13 is delicate with water in the pond. After that, Ess-13 in the water is expanded at pore space in the soil and cover with soil. ESS-13 can be to prove a leaking pond in golf course under business. ESS-13 is cheap and it needs short construction period. It does not need to switch the old water-proof system, additionally. It needs to move fishes to other place before utilizing ESS-13.

표면염화물량 산정을 위한 건축마감재별 비래염분 부착율 분석 (Attachment Rate Analysis of Airborne Chlorides by Construction Finish Material to Measure the Amount of Chlorides on the Surface)

  • 조규환;지동헌;정재민;박동천
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.57-58
    • /
    • 2014
  • For durability design to protect against chloride-induced corrosion, it is important to estimate the amount of chlorides on the surface. However, it is difficult to estimate the airborne chlorides, a boundary condition, due to the difference between the amount of chlorides attached to a surface of an actual structure and that in the air. Therefore, in this study the attachment rate analysis of airborne chlorides was evaluated for 13 types of finish materials. As a result, despite differences in the amount of airborne chlorides according to the finishing type, it was found that 60 percent of airborne chlorides were attached to mortar, 30 percent were attached to steel, and 25 percent were attached to tiles compared with the amount of chlorides in the air.

  • PDF

모바일 BIM 공사관리시스템을 위한 클라우드 컴퓨팅 기술 활용 방안 (Applying the Cloud Computing Technology for Mobile BIM based Project Management Information System)

  • 이종호;엄신조
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 1부
    • /
    • pp.145-148
    • /
    • 2011
  • As a futuristic construction model, building information model(BIM) based project management system(PMIS) and mobile PMIS have been showing visible sign. However, researches on the 3D BIM based PMIS using mobile device are hard to find, result from limitation of mobile device application(slow speed at huge BIM file, display size, and etc.) and undefined standard of business processes. Therefore, this research aims at studying feasibility of mobile BIM PMIS based on cloud computing as a business model. In case of applying mobile BIM PMIS, 3D drawings and integrated building informations are possible on mobile devices in real time. it would support increasing the productivity of project participants as designer, engineer, supervisor, and etc. Globally, BIM based PMIS and Mobile BIM system, cloud computing based mobile BIM simulator are in the concept or experimental phase, therefore it is possible to secure global leading technology of IT and construction merger in the mobile BIM.

  • PDF

농업건축물 분류체계 현황 및 문제점 파악에 관한 연구 (A Study on the Current Status and the Problem of Classification System in Agricultural Facilities)

  • 최오영;김태희;김재엽;김광희;조형근
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.253-257
    • /
    • 2009
  • General technique and management technology of agriculture have development in every year to ensure the competitiveness of agriculture. Accordingly, Interested in using information systems management technology is improving. For information system, the first system of rural buildings category should be established. Classification system is set up through each specific code. and it takes advantage of the information system is to achieve the computerization of agricultural society. Therefore, in this study construction information classification system, quantity of output category, got to the standard classification system architecture, apply to agricultural buildings to review the situation and saw a problem. The result, it is the complexity and broad scope, and it is set to inappropriate setting of the Category item.

  • PDF

Investigating Main Causes for Schedule Delay in Construction Projects in Bangladesh

  • Rahman, MD. Mizanur;Lee, Young Dai;Ha, Duy Khanh
    • Journal of Construction Engineering and Project Management
    • /
    • 제4권3호
    • /
    • pp.33-46
    • /
    • 2014
  • Delay is the most common problem in the construction industry. It has many negative effects on project's success in terms of time, cost, quality, and safety. From the literature review, a total of thirty-five factors of delay were selected. These factors were divided into seven groups related to materials, manpower, owner, consultant, contractor, construction, and external problems. This study was carried out to identify the main causes of delay for a construction project through their importance level. The importance level was determined based on the frequency of occurrence and severity of impact. The structured questionnaire has distributed to the respondents who have much experience in construction management in Bangladesh. The results of analysis indicated that top five factors of construction delay according to their level of importance are: (1) price of construction materials increased very rapidly, (2) political situation (revolution/ public strikes), (3) shortages of skilled workers, (4) poor site management and supervision by contractor, (5) incompetent/ immature subcontractors. These findings of this study are expected to be significant contributions to Bangladesh construction industry in controlling current performance of project on time overrun.