• Title/Summary/Keyword: IT in Construction

Search Result 21,564, Processing Time 0.041 seconds

A STUDY ON SPACE ZONING BY COMPUTING IDLE-TIMES IN CONSTRUCTION PROCESSES

  • Sang-Min Park;Won-Suk Jang;Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.509-512
    • /
    • 2013
  • An inappropriate space zoning plan causes the unnecessary transportation of construction material and equipment among work areas and increases the disorder of work space. Space zoning is an essential operation management technique which contributes to reduce the process and/or operation idle-time. This paper introduces a method that computes the idle-times between construction operations (or processes) by using Web-CYCLONE. It allows computing with idle-times that affect the construction productivity. Using the idle time between operations and between processes, it computes the optimal number of zones and finds the optimal combination of zones that minimize the idle times. The method contributes to minimize the idle times relative to the operation schedule using complete enumeration. This paper presents the system prototype in detail. A case study is presented to demonstrate the system and verifies the validity of the model. It allows a project manager to establish space zoning plan that effectively segregates a project into optimal number of construction zones and to assign the constrained resources (e.g., laborer, equipment).

  • PDF

Frameworks of Construction Information Systems under the Changing Industry Paradigms (건설산업 환경변화에 따른 건설정보화 개념요소 고찰)

  • Joo, Mi-Hee;Jung, Young-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.115-118
    • /
    • 2010
  • The concept of construction information systems (IS) is very comprehensive and subjective. Acronyms in relation to the construction IS may include BIM, CIC, IT, nD-CAD, ERP, CALS, KM and so on. These terminologies are used in a somewhat mixed way causing possible misunderstandings in research and practice of construction information systems. Moreover, ever-changing construction business environment has widely affected the roles and methods of utilizing construction IS. Examples of these changes are dissemination of alternative project delivery systems, global standardization under highly competitive overseas market, and advancement of information and communication technologies. In this context, the purpose of this paper is to propose a high-level framework for information systems in the construction industry. Several different concepts in the area of construction IS were investigated first in order to identify the major variables of the framework. Trends of research and real-world implementations were then analyzed to support the rationale of the variables. Finally, a framework was proposed by re-arranging the relevant issues. Findings of this paper indicate that different acronyms commonly share many similar concepts in their definitions, however, in each acronym, the motivations and approaches to implementing construction IS are very different. Different approach can provide maximum effectiveness, while overlaps may happen causing practical inefficiency.

  • PDF

Cause Analysis and Reduction of Safety Accident in Modular Construction - Focusing on Manufacturing and Construction Process - (모듈러 건축에서의 안전사고 원인 분석 및 저감방안 - 제작 및 시공단계 작업을 중심으로 -)

  • Jeong, Gilsu;Lee, Hyunsoo;Park, Moonseo;Hyun, Hosang;Kim, Hyunsoo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.8
    • /
    • pp.157-168
    • /
    • 2019
  • Modular Construction is regarded as having enhanced safety compared to traditional construction since most of modular manufacturing process in plants. Unlike general consideration for safety in modular construction, several industrial accident data and studies have pointed out that the accident rate of modular construction is not enough less as much as the practitioners have expected. It means that there is a clear need for improvement of safety management in modular construction. To enhance safety, it is necessary to identify the type and cause of accident through accident cases in order to prevent safety accident in advance. In this consideration, this study analyzed the types and causes of accidents through root cause analysis procedure with accident cases of U.S. OSHA. The classification was carried out in the order of process type, accident type and cause of accident. By following the classification criteria in this study, the causal factor was derived and the root cause map was created. Based on the analysis results, cross-analysis was conducted and it is shown that activity characteristics of modular construction are related to safety accidents. In addition, prevention methods to reduce safety accident by major activity are presented in terms of organizational, educational and technical aspects. This study contributes that the result can be used as the basic safety management in the manufacturing and construction process of modular construction.

Industrialized Building Systems for the Kingdom of Saudi Arabia

  • Santoso, Try P.;Trigunarsyah, Bambang;Hassanain, Mohammad A.;Tuffaha, Firas
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.73-79
    • /
    • 2017
  • Rapidly expanding population in the Kingdom of Saudi Arabia has a massive impact to put pressure on the shortage of housing and existing infrastructure. With average population growth rate of 1,9% yearly, the population in Saudi Arabia is projected to increase from 31 million in 2015 to 37 million in 2025. According to the housing ministry, Saudi Arabia needs to provide 3.3 million units to meet the demand in 2025, which is about 300,000 unit a year. In the past 40 years, using the conventional construction method, the Saudi construction industry was only able to build about 150,000 units per year. To meet the demand gap for the housing shortage, a new approach and innovation in construction methods are needed. Industrialized construction as an approach in construction methods has been studied and implemented in some countries that experienced similar corncerns. Industrialized construction can be defined as the implementation of manufacturing methods to construction-related activities to improve quality, reduce cost and project duration. Compared to the conventional construction method, prefabrication as industrialized construction methods has reduced construction labor on-site by 9.5%, construction project duration by 20%, and construction waste by 56%. It improves the quality, durability and cost saving not only for construction project owners, but also construction contractors. This paper discusses the possibility of 'industrialization' of building system in the Kingdom of Saudi Arabia as a solution for the housing shortage. It is an initial part of a study aims to develop a framework to develop industrialized building system in the Kingdom of Saudi Arabia. The is paper based on extensive literature review and case studies.

  • PDF

Some Practical Issues on the International Construction Contract (국제건설계약(國際建設契約) 실무상(實務上) 유의점(有意點))

  • Kim, Seung-Hyeon
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.25
    • /
    • pp.3-40
    • /
    • 2005
  • Many Korean construction companies have been performing a variety of overseas construction projects since the 1970s. It is unfortunate that in many cases they have had to suffer big losses caused by errors and defects in the design and construction of the projects. In the author's opinion, however, there were losses that could have been avoided if they had understood better the feature and content of the particular construction contract. Few lawyers and scholars in Korea have been interested in the research and study of international construction contracts. This is mainly because they do not have access to practical sources outside of Korea for them to research and study since the contracts undertaken have been dealt with by law firms in other jurisdictions to which the disputes apply. This article is aiming primarily at the introduction of the issues which the practitioners are likely to confront in the process of reviewing and performing the international construction contract. In some cases solutions are sought about these issues based upon the FIDIC standard terms and conditions, the actual experience of practice, and UNIDROIT Principles, etc. It is reasonable to say that all the issues related to the international construction contract cannot be covered in a short article like this. The author wishes this article could induce subsequent studies on international construction contracts for further research. It has to be noted that from time to time Korean construction practices have been compared to the international ones for better understanding. This article mostly includes cases where the Korean construction companies go overseas for their projects, while there are some cases where foreign developers and financial investors participated in domestic projects in which international construction contracts forms were adopted. A few precedent domestic writings about international construction contracts seems to lack emphasis on the points that there are several standard construction contract forms and that they are different. The differences are mainly in accordance with who bears the design responsibility, how the owner has to make progress payments to the contractor and who the funding source for the project is. This article tries to make it clear that there are significant differences between the standard contract forms, e.g. a simple construction form, a design-build form and an EPC/turnkey form of contract. Again, the author hopes that this article can arouse the interest in the international construction contracts from both academic and practical fields, so that many subsequent advanced articles can help our construction industry become much more competitive in the world through awareness of the methods of procurement and administration of the contracts.

  • PDF

A Case Study On The Core Construction Method Applied to the Kolon Tripolis Project (코오롱 트리폴리스 코아 선행공법 시공사례 분석)

  • 이성진
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.05a
    • /
    • pp.13-20
    • /
    • 2002
  • Recently, as the tripolis where the construction of the high-rising building is actively advanced domestic, it will be able to resist in the various horizontal load with the resistance system against hereupon to arrange R.C wall in Core Portion in order, like this building the core construction must preceding from the steel structure and it will reduce using of steel frame amount and it will be able to reduce a whole construction cost with a horizontal resistance ability from the report which provides a reference data to the similar project after to analyze the application of the mivan formwork system which relates in Tripolis.

  • PDF

A Study on the Improvement of Design For Safety through the Analysis of Overseas Cases (국내 설계 안전성 검토 및 해외 사례 분석을 통한 개선방안 연구)

  • Yeom, Seong-Jun;Kim, Jun-HO;Lee, Donghoon
    • Journal of the Korea Institute of Construction Safety
    • /
    • v.3 no.1
    • /
    • pp.25-31
    • /
    • 2020
  • While the disaster rate in all industries has been on a steady decline over the past decade, the accident rate in the construction industry has been on the rise, and it is urgent to improve it. The purpose of this study is to compare and analyze domestic design safety review system with overseas cases to derive problems of domestic design for safety review system and find ways to improve it. Like U.K and Singapore, it should be reviewed from the beginning of the working design, and Safety reviews should be conducted not only in large-scale construction but also in small-scale construction to reduce construction industry disasters. In particular, it is necessary to prepare a system for the lack of related systems, and the Design for safety system is meaningful in that it is an expansion of the spectrum from operator-centered safety management system and requires sufficient improvement and research in the future.

The Prediction Model of a Working Pattern According to Working Time Reduction in Construction Sites (근로시간 단축에 따른 건설현장에서의 근로패턴 예측 Model)

  • Kim Hong-Ryul;Yu Il-Han;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.316-322
    • /
    • 2002
  • In case of reducing working time, it is difficult that the construction industry is analyzed far-reaching effects caused by a reduction of working time, by approaching with just the total amount of work. Because it has the properties such as the singularity, the outdoor using, a sense of the season unlike other industries. In order to analyze the effect of a reduction of working time on the construction industry, the example of a reduction of working time in domestic other industries related with it was analyzed intensively first. And an example in Japan, which is similar to our existing related laws and industrial structure among foreign construction industries was analyzed, and a relation with the domestic construction industries and an issue were drown a conclusion. This was applied to a field worker and a related main group participating in a real production. And it showed the prediction model for a working pattern and a dealing plan to prepare in a construction site by predicting a working pattern in the management side of a construction site annually.

  • PDF

A Study on the Revision of the Cost accountingfor Sidewalk Block Pavement Maintenance and Repair Work (보도용 블록포장 유지보수 공사 원가산정기준 개정 연구)

  • Oh, Jae-Hoon;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.271-272
    • /
    • 2021
  • The maintenance and repair work of sidewalk block pavement is a construction that requires a large amount of budget to be invested every year. It is important to establish an appropriate standards for estimating construction cost to ensure proper budgeting and quality. In this study, the standards for estimating the cost of maintenance and construction work for sidewalk blocks that can be applied to the construction volume classified according to the site conditions, construction type, and equipment use differentiated from new construction was established. As a result, the daily construction volume was presented by reflecting excavator and truck as equipment in the combination of paver and common worker. The re-installation was applied by separating the construction volume of sections with general blocks and induction/raised blocks based on the installation of sidewalk blocks after demolition. Generally if block cutting is necessary, the precision construction conditions using a cutting machine were taken into consideration to secure the construction quality. In addition, it has been revised to apply classified construction volume into A and B-Type depending on the park and site conditions.

  • PDF

A Study on the Priority Safety Management Items in the Medium and Small sized Construction Sites (중·소규모 건설현장 중점 안전관리 항목에 관한 연구)

  • Jang, Yun-Ra;Go, Seong-seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.4
    • /
    • pp.38-49
    • /
    • 2020
  • As the quality of life has been improving, people are getting higher interest and higher expectation for safety. However, the accident rate at the construction site is still high. Therefore, it is urgent to secure the safety at the construction work. Due to the nature of the construction industry, construction sites are directly exposed to the external environment. The possibility of accident occurrence is increased due to various factors such as the always variable processes, the diversity of manpower input, the increase in vulnerable class, and the danger of construction equipment..Particularly, the disasters occurring at the small- or medium-sized construction sites (budget ≤ 12 billion KRW) account for 88.9% of the total disasters at construction sites (73.4% for casualty). It was due to the lack of management caused by the absence of supervisors and insufficient safety measures. Moreover, it is difficult for the small- or medium-sized construction sites to apply basic safety measures such as safety education and safety facility installation by themselves in order to prevent disasters because they don't have sufficient safety organizations. It is because they have relatively less safety personnel and poorer technology system than large-sized construction sites. Therefore, in order to reduce accidents in construction, it is necessary to prevent accidents at the small- and medium-sized construction sites. From this point of view, the objectives of this study were to identify the key risk items causing accidents frequently by analyzing the accidents at construction sites and identifying problems associated with safety management, and to secure the safety at the small- and medium-sized construction sites.