• Title/Summary/Keyword: IT Project Feasibility

Search Result 387, Processing Time 0.022 seconds

Study on Assessment Indicators for the Development of Agricultural Technology Development (신기술개발을 위한 사전평가지표 개발)

  • Ku, Kyo Young;Kwak, Cheul Soon;Hwang, Dae Yong
    • Journal of Agricultural Extension & Community Development
    • /
    • v.19 no.4
    • /
    • pp.1095-1136
    • /
    • 2012
  • The study demonstrated the pre-feasibility evaluation of the new agricultual technology R&D project and the ways to improve it. The study created new criteria for pre-feasibility evaluation based on the results acquired from the examination and analysis of pre-feasibility evaluation systems and criteria of various institutions at home and abroad in order to understand the current state of the evaluation method conducted by the Rural Development Administration and to seek ways for its improvement. The new criteria include indices for technicity, marketability, and feasibility. Based on these, questionnaires were prepared and the answers on them were statistically analyzed to set weights between indices. It was found that feasibility appeared the highest, in particular, feasibilities related to budget appropriateness, novelty, possibility of demand for the technology, and potential of commercialization appeared high. Referring to this conclusion, a simple operation process of pre-feasibility evaluation was introduced in the study.

A Study on Improvement of Feasibility Evaluation for Public Projects (공공사업 타당성 평가의 개선 방안에 관한 연구)

  • Park, Seung-Jun
    • Journal of the Korea Convergence Society
    • /
    • v.8 no.2
    • /
    • pp.163-168
    • /
    • 2017
  • The feasibility evaluation of public projects has been carried out mainly in the economic analysis. However, items of political, technological and balanced regional development aspects are further evaluated by applying analytic hierarchy process, This paper suggests to analyzes preliminary feasibility study of construction and research & development project during the past three years and to verify correlation between B/C ratio and AHP weight. The result shows that the correlation between cost benefit ratio and the weight of the hierarchy is 0.744 in construction projects and 0.899 in research & development project. Namely, AHP weight be under the control of B/C ratio and is devoted to its role against expectation. Therefore it must be sufficiently discussed in various designs of studies to maximize the effects of AHP analysis.

Barriers to Success of Project Management (프로젝트 관리의 성공에 영향을 미치는 장애요인)

  • Lee, A-yeon;Moon, Kyung-mi;Kim, Seung-chul
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.43 no.3
    • /
    • pp.179-190
    • /
    • 2020
  • As the business environment is rapidly changing with globalization and complexity of information flows, the uncertainty is also very increased for project environment. Although many studies have been conducted to find out the critical factors for project success, there still exist different views to define project success. Furthermore, implementing success formula for one project does not necessarily guarantee a success for another project since there are other elements that impede the success of project. In this regards, it is imperative to examine what are the barriers to project success. This study aims to examine the barriers that impede the success of project. Past literature was thoroughly reviewed to collect and develop a preliminary list of elements that affected project performance negatively. Experts were interviewed to refine the list and the final list of the measurement items were developed. A survey questionnaire was developed with the final list of measurement items, and a survey was conducted on the practitioners with project experience. After the survey, an exploratory factor analysis was conducted on the final list to extract the component dimensions which in turn formed the group of project barriers. The exploratory factor analysis provided ten factors, which are difficulty of process management, failure of project feasibility analysis, cost overruns and lack of cost benefits, unclarity project plan, strategic consistency error, stakeholder conflict, inaccuracy of requirement definition, disturbance of communication, technical environment change, negative attitude of top management.

Economic Feasibility of REDD Project for Preventing Deforestation in North Korea (북한 산림전용 방지수단으로서의 REDD 사업의 경제적 타당성 분석)

  • Jo, Jang Hwan;KOO, Ja Choon;Youn, Yeo Chang
    • Journal of Korean Society of Forest Science
    • /
    • v.100 no.4
    • /
    • pp.630-638
    • /
    • 2011
  • This study aims to verify the economic validity of the REDD project in North Korea by estimating the potential carbon credits and the cost of REDD project. The REDD potential credits of North Korea are estimated based on the international statistics of forest area and population from 1990 to 2010, and the cost of REDD project is estimated indirectly by annual land opportunity cost of agriculture assuming that South Korea will aid the food production per area in North Korea. When the 25% reduction scenario was applied to the annual deforestation rate in North Korea, the potential REDD credits were estimated to be $4,232million{\sim}5,290milliontCO_2eq.$ for 20 years. It would account for 28~35% of South Korea's national medium-term greenhouse gas reduction target. On the other hand, the break-even price of REDD project was calculated as the profit of agriculture in the land available by forest conversion in North Korea. It was estimated to be 19.19$/$tCO_2eq.$ when the non-permanence risk of forest conserved through a REDD contract is assumed to be 20%. This price is higher than the price of REDD carbon credit 5$/$tCO_2eq.$ dealt in the 2010 voluntary carbon market, leading to no economic feasibility. However, REDD project provides co-benefits besides climate mitigation. As previous studies indicate, the break-even price is lower than 20$/$tCO_2eq.$, which is the social marginal cost of greenhouse gas emissions by loss of forest. Therefore REDD in North Korea can be justified against the social benefits. The economic feasibility of REDD project in North Korea can be largely influenced by the risk percentage. Thus, North Korean REDD project needs a strong guarantee and involvement by the government and people of North Korea to assure the project's economic feasibility.

A Case Study on Implementation of ITSM using 6 Sigma Technique Focused on Service Desk (6시그마 기법을 활용한 ITSM 정착에 관한 사례 연구 : 서비스데스크를 중심으로)

  • Yoon, Kwan-Sik;Hwang, Kyung-Tae
    • Journal of Information Technology Applications and Management
    • /
    • v.14 no.3
    • /
    • pp.1-14
    • /
    • 2007
  • Recently. interests in IT Service Management (ITSM) are increasing internationally as well as domestically. In order to realize the benefits from ITSM, it is necessary to institutionalize it as a culture of the organization through effective change management. One of the most promising approach of effective change management is a Six Sigma technique. In this study, we analyze a success case in which 6 Sigma was applied to Service Desk function which is one of the most important functions of ITSM. Through the analyses, this study aims to propose a feasible and specific approach to institutionalize ITSM. To accomplish the objective. the study analyzed specific methods of application of 6 Sigma to ITSM. performance of the project and future directions based on interview and project document/deliverable review. This study could not provide detailed performance measures due to lack of previous research on this topic and difficulty of obtaining quantitative data. However. this study has contributed to proposing a direction to institutionalize ITSM in organizations by analyzing a feasibility of 6 Sigma in implementing ITSM.

  • PDF

An Advanced GERT Evaluation Model for Research and Development (연구개발 프로젝트를 위한 새로운 GERT평가모델)

  • 권철신
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.3 no.3
    • /
    • pp.13-22
    • /
    • 1980
  • Research and Development has a property that involves uncertainity and risk in itself. Therefore, in order to scheduling of R & D activity, it Is needed of a certain probabilistic network technique with due regard to feedback process used to occur in the R & D proceeding. It is GERT that was developed as the need arises . In this study, the network structure of GERT-I and GERT-II was combined and then simulation analysis was used to it. According to that analysis , an advanced GERT model which covers the following stochastic problems was examined. 1 Evaluating success feasibility under the complex condition (time and cost). 2 Selecting acceptance range for the worst. 3. Selecting optimum path on basis of time, cost and success. 4. Evaluating project utility among the project alternatives. It is for managing R&D projects more effectively.

  • PDF

Success Factors of Highway Construction Projects in Egypt: AHP Approach

  • El-Maaty, Ahmed Ebrahim Abu;El-Hamrawy, Saad;Akal, Ahmed Yousry
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.4
    • /
    • pp.7-14
    • /
    • 2016
  • While the idea of the existence of a set of key factors for success in planning, designing and construction of projects is not new, it remains one of the most important issues in the field of construction management. This is due to project success factors are inputs to project management practice which can lead directly or indirectly to project success. This study identifies the success factors which can be used for improving the highway projects performance in Egypt during the project pre-construction and construction phases. Through a detailed literature review 35 success factors are identified. Furthermore, the AHP is adopted to prioritize the studied factors through the application of questionnaire survey. The study establishes that implementing an effective quality control and assurance systems, allow sufficient time for feasibility studies, design, drawing and tender preparation, effective cost control system and frequency of project budget updates, preparing adequate designs and drawings and determining sufficient time to implement the desired scope of work are the most important success factors for enhancing the highway projects performance in Egypt.

Preliminary Feasibility Study for Commercial DME Plant Project (DME 상용화 플랜트 예비 타당성 조사)

  • Mo, Younggi;Kang, Minseo;Song, Taekyoung;Baek, Youngsoon;Cho, Wonjun
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.25 no.2
    • /
    • pp.173-182
    • /
    • 2014
  • Dimethyl ether (DME) is a new clean fuel as an environmentally-being energy resources. DME has similar characteristics to those of LPG and can be substituted Diesel fuel. KOGAS has investigated and developed new innovative DME synthesis process from synthesis gas with KOGAS's own technologies. KOGAS had finished the construction of 10ton/day DME demonstration plant in 2008, we have established the basic design of commercial plant which can produce 3,000ton/day DME. Specifically, an economic model for a commercial DME project will be presented. It accounts for all the major cost factors that are considered in a commercial scale project as the model input for performing cash flow analysis, after which key economic indicators are produced including the internal rate of return (IRR), net present value (NPV). Sensitivity analysis is performed to identify dominant cost factors to the project economics and quantify their impact. The inputs to the economic analysis will be based on representative cost factors from the commercial-scale design of KOGAS' direct DME process supplemented by literature data. Case study results will be presented based on recent commercialization projects.

Economical & Technological Ripple Effects in Acquiring New Weapon System : Focused on Ground·Sea·Air Weapon System (국방무기체계 연구개발 기반 경제적·기술적 파급효과 : 지상·해상·공중 무기체계를 중심으로)

  • Shin, Sang-Wook;Oh, Cheon-Kyun;Yim, Dong-Soon;Choi, Bong-Wan
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.4
    • /
    • pp.111-122
    • /
    • 2018
  • The private sector is currently reviewing the feasibility of the project or deciding economic policies by analyzing the economic ripple effects. However, the arms acquisition project focuses on the need for the national defense weapons system by analyzing the costs and the effectiveness of the analysis and reviewing the necessity and feasibility of the project. In order to analyze the economic ripple effects, KB (the Bank of Korea) prepares and publishes an analysis table of industrial associations in a given unit. IAAR (the industrial association analysis report) is difficult to apply directly to the defense weapons system. Therefore, research on the economic ripple effects applicable to the defense arms procurement project was needed. In this study, we propose the generic methodology for estimating economical and technical ripple effects resulted in acquiring new weapon systems. Based on the analysis of inter-industrial relations, economical ripple effects are estimated with production inducing effects, value-induced effects, employment-induced effects and export-induced effects. Also, the technological ripple effects are estimated with technological intensity represented by investment cost in research and development. To show the validity of proposed methodology, a case study of acquiring new weapon systems such as GR (guided rocket), destroyer, and helicopter is accomplished. From the case study, it is concluded that these economical & technological ripple effects can be used as a reference to decision making in the course of acquiring major future defense weapons systems.

Analysis on the Construction Cost of Spatial Structures (대공간 구조물의 공사비 분석)

  • Jang, Myung-Ho;Sur, Sam-Yeol
    • Journal of Korean Association for Spatial Structures
    • /
    • v.7 no.3 s.25
    • /
    • pp.133-140
    • /
    • 2007
  • Spatial structures is a appropriate shape that resists external force with only inplane force by reducing the influence of bending moment, and it maximizes the effect of structure system. An economic analysis is one of the most important factors to determine the project feasibility. Large spatial structures project is more need to comprehensive technology than a general construction project. In order to result in success of these project, it is desired that analyze an essential elements(for example, large budget, professional engineer, construction method, etc.) in the whole life cycle of buildings by schematic preparation from the early feasible study steps. We collect the data and analyze construction cost through this study which examines general remarks of existing spatial structures and researches its examples. This study is aimed to apply basic data to establish database the spatial structures.