• Title/Summary/Keyword: IT Project Feasibility

Search Result 386, Processing Time 0.031 seconds

A Study on the Location Assessment of Rural Village Construction Project (신규마을 조성사업의 입지 평가에 관한 연구)

  • Lee, Byunghark;Jung, Namsu;Kim, Jongbong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.61 no.4
    • /
    • pp.97-103
    • /
    • 2019
  • If the new town development project begins with inappropriate location then it will be difficult to recruit tenants and the proportion of the infrastructure cost could increase. It is necessary to evaluate the feasibility of the new town development projects to solve this problem. This study aims to identify the current status of the new town development projects and draw up evaluation criteria by examining advanced researches. To identify the importance of each village, we set up the weights through analytic hierarchy process. The evaluation criteria were classified into location conditions and economical efficiency. In the case of location conditions, it was classified into available size, geographical conditions, and accessibility. As a result of analyzing the questionnaire, it was subdivided into officially assessed land prices in case of economic efficiency. This study had some limitations, that is we focused on the location conditions and economic feasibility among other factors. Therefore further study should contain analysis more on socio-cultural aspects such as residents' cooperation or will for this project. By adding results later, we can make more reasonable decisions when we choose appropriate area.

A Study on Criteria for investment Priority of Railway Project (철도건설 투자우선순위에 관한 연구)

  • Park, Il-Ha;Park, Yong-Gul;Kim, Si-Gon
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.112-116
    • /
    • 2008
  • Determining the investment priority of the railway project is essential to keep its object of railway investment. [National railway construction plan] provide 4 major evaluation indicators and their weighting range in determining the investment priority of railway construction. Which are investment efficiency, inter-regional balance of development, network effects, government supporting policy. However this present criteria has inconsistency in determining economical feasibility of the railway transportation when applying the same evaluation indicator, investment efficiency, with the road transportation. The railway transportation is superior to road transportation in terms of transportation capacity and distance, while offering less carbon emissions. In spite of the prominent position of the railway transportation, it can be failed to obtain its proper investment priority when being determined under economical feasibility based. Therefore, this study analyzed the inconsistency under present evaluation criteria and proposed new evaluation method for the investment priority of the railway construction using AHP(analytic hierarchy process), while differentiate from the road construction. This method is optimized for only determining the priority of the railway construction itself under object of railway investment respectively.

  • PDF

A Study on Feasibility Analysis and Alternatives for Infrared Detector Development (적외선 검출기 개발가능성 및 대안 분석 연구)

  • Kim, Gyeong-Su;Min, Seong-Gi;Kim, Cheol-Hwan
    • 시스템엔지니어링워크숍
    • /
    • s.4
    • /
    • pp.123-134
    • /
    • 2004
  • This paper deals with the feasibility analysis and alternatives for infrared detector development. The purpose of this paper analyze development requirement and feasibility study in both technology and cost. We get raw input data for system engineering process from development and technical expert, and then analyze cost and technology for development feasibility, and alternative study. Infrared Detector is core component of Thermal Imaging System and developed by ADD from 2006 to 2008 year. Technical level is analyzed by TRL(Technical Readiness Level) and AOA(Analysis of Alternative) is done by development and production cost estimate. We use SEER-H tool for cost estimate, that is parametric cost estimate tool based on Knowledge Base. Also this paper presents risk analysis for project management because it is necessary to risk driver management during the infrared detector development. The result of IR Detector feasibility and alternative study will be used in technical and cost analysis. This study can help those who are related to the cost analysis and development feasibility of other weapons

  • PDF

An Analysis of BcN Feasibility of Area of Agricultural and Fishing Village (농어촌지역 BcN 기반구축 사업타당성 분석)

  • Jeong, Woo-Soo
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.33 no.6B
    • /
    • pp.440-449
    • /
    • 2008
  • This paper is to analyze the feasibility of area of agricultural and fishing village as the link of the broadband convergence network(BcN) build-up. For the project feasibility analysis, we utilized the questionnaire of experts and drew the new index of evaluation. By using the AHP technique, we evaluated the feasibility. And by reviewing precedent papers and references, it drew proper evaluation criteria and evaluated BcN feasibility using AHP; economic feasibility, technological feasibility and policy feasibility were figured out as main criteria and resulted evaluation criteria for BcN feasibility. As a result, we found the business enforcement was exposed to be apposite and inconsistency index showing the reliability of the analysis was showed up lowly as 0.0566. Afterward, the BcN business of construction contribute to the living improvement of a nation. Moreover, there will be a value as the basic materials for reasonably propelling the BcN project.

A Study to Promote the EC Collaboration of the South and North Korea based on the Preemptive Dispute Resolution Policies (남북한 전자상거래 추진에 따른 활성화 방안 -분쟁방지를 위한 사전조정 기능을 중심으로-)

  • Choi, Yong-Rok
    • Journal of Arbitration Studies
    • /
    • v.16 no.3
    • /
    • pp.191-216
    • /
    • 2006
  • It has been talked about the responsibility of the South-North Korean e-market place(e-MP) collaboration project every you since 2003. However, the feasibility as the business has not been dealt with in detail due to the uncertain environment as well as the complicated procedures of the project. The research focuses on the workable mechanism of the South-North Korean E-Market Place collaboration project. The feasibility of the project results from the newly installed fiber telecommunication network as well as the 1 billion dollars of the trading volume between South and North Korea. The research analyzes on the capabilities as well as willingness of the South and North Korea for the e-MP, and concludes with two paradigms of the future tasks. First, the unified but step-wise structure should be made to promote the project by the political committee (South and North Korea EC Committee) and the economical administration body (South and North Korea EC Corporation). Second, the market-oriented resolution system such as South and North Korea Arbitration Body should be involved to create legal environment. Above all, the discussion should be on the main body of e-MP settlement to abolish the psychological as well as practical barriers to enter the South-North Korean electronic commerce.

  • PDF

A Survey Analysis on the Need for Expansion of Public Medical Institutions

  • CHOI, Eun-Mee;KWON, Young-Eun;KWON, Lee-Seung
    • Journal of Wellbeing Management and Applied Psychology
    • /
    • v.4 no.3
    • /
    • pp.45-51
    • /
    • 2021
  • Purpose: This aims to find a strategic plan for the feasibility study of a medical center extension project in order for local public medical institutions to obtain public interest and profitability through a survey of residents. Research design, data and methodology: The structured questionnaire was distributed at random, and a total of 219 people responded as users or patients responded to the questionnaire in a self-filling manner. Through this questionnaire, the feasibility and necessity of the extension of Gangneung Medical Center(GMC) was measured. All data processing was analyzed by applying version 26.0 of IBM SPSS statistical package program. The main contents of the questionnaire included reasons for using GMC, inconveniences, overall level of medical care, satisfaction, intention to revisit, the necessity of GMC's complex ward extension project, and GMC consisted of 8 questionnaires, including the desired service for the extension of the complex ward. Results: As for the necessity of the GMC complex ward extension project, 95.9% of residents said they wanted the complex ward extension project, 2.3% said it was not necessary, and the remaining 1.8% had other opinions. Conclusions: GMC complex ward extension project is necessary.

Front End Engineering and Design (FEED) for Project Management of Thermal Power Plant Construction

  • KIM, Namjoon;JUNG, Youngsoo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.415-419
    • /
    • 2015
  • Engineering is a value-adding process applying knowledge and skills in the construction industry that includes the planning, feasibility study, project management (PM), front end engineering and design (FEED), detail design, procurement, construction, supervision, and operation. Among these engineering activities, FEED is defined as a comprehensive design practice in the early design phase focused on conceptual design and basic design. It is a particularly influencing area that determines the competitiveness of procurement and construction capability of construction firms (KNIN 2013). Nevertheless, previous studies in FEED have been limited to the design process, deliverable, or particular management technique (e.g. system engineering, collaboration, information etc.). In this context, the purpose of this study is to propose a comprehensive FEED business process structure for project management of thermal power plant construction projects encompassing the entire project life cycle. And an assessment methodology for FEED functions was developed. It is expected that the proposed structure of FEED functions and FEED evaluation methodology will contribute to improvement of competitive capability of engineering, procurement, and construction (EPC) companies.

  • PDF

A Economic Feasibility Study on Environmental Ecology Flow Supply Plan using Agricultural Reservoir - Focused on Dongbok River - (농업용저수지를 이용한 환경생태유량 확보방안 경제성 비교 연구 - 동복천을 중심으로 -)

  • Park, Jin-hyeon;Ko, Jae han;Sung, Mu-hong;Jung, Hyoung-mo;Park, Tae-sun;Kwak, Yeong Cheol;Choi, Woo-young;Boem, Jina;Jeung, Minhyuk;Yoo, Seung-hwan;Yoon, Kwang-sik
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.61 no.5
    • /
    • pp.33-47
    • /
    • 2019
  • The environmental ecological flow (EEF) of stream or river will be designated according to the enforcement of the Water Environment Preservation Act. Previous researches by Ministry of Environment have proposed agricultural reservoirs as alternative resources to secure river flow where multi-purpose dam does not exist. However, agricultural reservoirs are constructed for the supply of agricultural water, and in fact, there is not a sufficient amount of water to be supplied to rivers as EEF. Therefore, this study examines the economic feasibility of securing EEF through the remodeling or construction of agricultural reservoirs. We investigated water balance of reservoir through simulation of three types of water supply demands such as agricultural water, agricultural water and river maintenance flow, and agricultural water and environmental ecology flow. The economics analysis was conducted on water supply demands and corresponding remodeling or construction of reservoirs. As a result, it was found that the method of securing through heightening existing reservoir enhancement is economically feasible. However, it was not possible to secure all the amount of the EEF due to the size limitation of existing reservoirs or constrain of the watershed for newly built reservoir. Therefore, in order to secure all of the EEF, the utilization of other alternatives as well as agricultural reservoirs should be considered. This study demonstrated the method of economical feasibility study of securing river maintenace flow and EEF using agricultural reservoirs and other considerations.

A Model Feasibility Analysis of Commerce Building (상업건축물의 사업타당성 분석 모형 구축)

  • Kook, Dong-Hoon;Son, Ki-Young;Kim, Sun-Kuk
    • KIEAE Journal
    • /
    • v.7 no.3
    • /
    • pp.71-79
    • /
    • 2007
  • The starting point of successful building production process is the feasibility study of the project. If the feasibility study is poor which is affected in direct production processes such as designing and engineering, it incurs a great unrecoverable loss to the company. The government institutionalized the feasibility study for projects that budgets over 50billion won in an effort to ensure competitiveness of the construction industry after IMF; however, the system and effort to created systematic studies or guidance preparation for private construction development projects are lacking in great deal. Therefore, the objective of this study is to establish the analysis factors of feasibility study and evaluation standard by systematic analysis in consideration of the changes of various variables and mutual relationships using system dynamics technique for office buildings among commercial buildings.

Study on the Application of RAMS for Rolling Stock (철도차량 RAMS 적용에 관한 연구)

  • Oh, Ji-Eun;Kang, Chan-Yong;Kim, Chul-Ho
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.206-212
    • /
    • 2004
  • This paper is application of System Assurance(SA) for the rolling stock. As railway systems become more complex, design teams are increasingly under pressure to deliver, design solutions, which integrate both technical and Systems Assurance(SA). Systems Assurance is the application of management methods and analysis techniques to ensure that a design meets Reliability, Availability, Maintainability and Safety (RAMS) criteria. It should be clearly understood that the intent of System Assurance is not just to provide analytical techniques as a metric on performance, but more importantly it should provide a management tool with which to co-ordinate and assure the whole design. System Assurance encompasses the ongoing requirement to consider safety, and RAM through each stage of a Project, from feasibility study through to commissioning and operation. If System Assurance is undertaken properly at feasibility study at the design stages of a Project, the benefits of such analyses can be significant in identifying potential problems early enough for action to be taken before manufacture or installation. At commissioning, RAMS demonstration activities are undertaken to validate the predictive and analytical techniques undertaken during the design.

  • PDF