• Title/Summary/Keyword: IT Project Benefit

Search Result 234, Processing Time 0.025 seconds

A framework of examining the factors affecting public acceptance of nuclear power plant: Case study in Saudi Arabia

  • Salman M. Alzahrani;Anas M. Alwafi;Salman M. Alshehri
    • Nuclear Engineering and Technology
    • /
    • v.55 no.3
    • /
    • pp.908-918
    • /
    • 2023
  • The Saudi National Atomic Energy project aims to adopt peaceful nuclear technologies and be part of the country's energy mix. As emerging nuclear energy, it is essential to understand public concerns and acceptability of nuclear energy, as well as the factors influencing acceptance to develop nuclear energy policy and implement nuclear energy programs. The purpose of this study is to analyze the public attitudes and acceptance of nuclear energy among Saudi Arabian citizens by utilizing protection motivation theory and theory of planned behavior. A total of 1,404 participants answered a questionnaire which was distribute by convenience sampling approach. A Structural Equation Modeling framework was constructed and analyzed to understand public behavior toward building the country's first Nuclear Power Plant (NPP). Before analyzing the data, the model was validated. The research concluded that the benefits of nuclear power plants were essential in determining people's acceptance of NPPs. Surprisingly, the effect of the perceived benefits was found higher than the effect of the perceived risks to the acceptance. Furthermore, the public's participation in this study revealed that the NPPs location has a significant impact on their acceptance. Based on the finding, several policy implementations were suggested. Finally, the study's model results would benefit scholars, government agencies, and the business sector in Saudi Arabia and worldwide.

EXPLORING THE KEY FACTORS FOR BIM ACCEPTANCE IN CONSTRUCTION ORGANIZATIONS

  • Seul-Ki Lee;Jung-Ho Yu
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.14-20
    • /
    • 2013
  • Substantial research has been performed on the data standards and exchanges in the AEC/FM industry over the past several years. The growing popularity of BIM technology is based heavily upon a perception that the technology can facilitate the sharing and reuse of information during a project life-cycle. Although many researchers and practitioners are in agreement about the potential applicability and benefit of BIM in construction, it is still unclear why BIM is adopted, and what factors enhance implementation of BIM. Thus, BIM acceptance and use remains a central concern of BIM research and practice. Therefore, we propose the key factors affecting the acceptance of BIM in construction organizations using factor analysis. The key factors for BIM acceptance are identified through a literature review in TAM (Davis 1989) and related theories, and consolidated by interviews and pilot studies with professionals in construction industry. Based on the factors, a questionnaire was designed and sent out to construction organizations such as contractors, architects, and engineers in Korea. Total 148 completed questionnaires were retrieved. Using factor analysis, key factors were grouped into six dimensions. These findings will clarify what the highly prioritized factors are, and can also be used in an assessment tool for the performance of BIM utilization.

  • PDF

A Study on Workers' Oral Function Problem According to Korean Standard Classification of Occupations (한국 표준직업분류에 따른 근로자의 구강기능문제)

  • Ju, On-Ju;Kim, In-Ja
    • Journal of the Korea Convergence Society
    • /
    • v.11 no.6
    • /
    • pp.341-347
    • /
    • 2020
  • This study was conducted to identify the oral function problems of workers according to Korean Standard Classification of Occupations (KSCO) and to provide evidentiary material to promote them to revise the Occupational Safety and Health Act so that workers can benefit from the collective oral healthcare project. For the research materials, it was used the 7th raw data (1st and 2nd) of National Health and Nutrition Examination Survey. It was examined the problems of chewing and speaking for the workers over 19 years old by KSCO. The connection between the types of workers and the problems of chewing and speaking has been confirmed (p<0.05). In order to improve the workers' oral healthcare, the collective oral healthcare project should be implemented. Therefore, the Occupational Safety and Health Act should be revised to hire professional health care manager with expertise, who will be host of the collective oral healthcare project.

Benefit of the Drinking Water Supply System in Office Building by Rainwater Harvesting: A Demo Project in Hanoi, Vietnam

  • Dao, Anh-Dzung;Nguyen, Viet-Anh;Han, Mooyoung
    • Environmental Engineering Research
    • /
    • v.18 no.2
    • /
    • pp.103-108
    • /
    • 2013
  • Vietnam is a developing country with the rate around 5%-6% per year, especially in urban areas. Rapidly developed urban areas lead to stress for infrastructure and the water supply is also stressed. In Hanoi city, total water capacity from the manufactories is around one million cubic meters per day and almost the entire main water source is groundwater but it is not enough to supply all of Hanoi's people, especially in the summer. A demo project is implemented in Hanoi University of Civil Engineering (HUCE) to produce drinking water by using the rainwater and membrane system and supply for people. In this project, rainwater is collected on the rooftop of the lecture building with an area of around $500m^2$ and $100m^3$ volumetric rainwater tanks. Afterwards, the rainwater is treated by the micro-membrane system and supplied to the tap water. Total cost for construction, technology and operation in the first year is around USD 48,558. In the long-term (15 yr) if HUCE invests in the same system, with $20m^3$ volumetric storage tank, it can provide drinking water for 500 staffs in every year. The cost of investment and operation for this system is lower than 30% compared to buying bottled water with the price USD 1.8/bottle. The drinking water parameters after treatment are pH, 7.3-7.75; turbidity, 0.6-0.8 NUT; total dissolved solids, 60-89 mg/L; coliform, 0; heavy metal similar with water quality in the bottle water in Vietnam.

Prospects for e-Science In Korea : The role and impacts ol Korea-UK collaboration

  • Kim, Cha-Young;Suh, Jee-Hyun;Tomlinson, Mark
    • Korea Information Processing Society Review
    • /
    • v.15 no.2
    • /
    • pp.15-28
    • /
    • 2008
  • The Korea UK e-Science Collaboration project has been aimed at supporting research and collaboration between Korean and UK researchers. Its goal is to benefit the nation by reducing cost and time in constructing the National e-Science Research Environment' by studying and benchmarking the cases in countries that have already procured advanced technologies in the area. Two joint workshops were held in a year where researchers from the two countries had the opportunities to share their research results with each other. Also, the project has supported exchanges of researchers fostering expertise in the field. In the course of the project, the e-Science Centre in the UK and KISTI have signed MoU(Memorandum of Understanding) in 2006. Moreover, there have been active research collaboration between Korea and the UK. The University of Southampton will share the BioSimGrid data with the Korean counterpart, and the University of York has provided the AURA software. In the future, KISTI and the UK NGS(National Grid Service) will organize a working group at OGF that will work mainly on the standardization of Parameter Sweep and bring it to lead the global standard. KISTI will include its own AURORA system into OMI-UK software stack, which will enable access to NGS resources through AURORA user application. The collaboration with the UK has opened up more opportunities for collaboration with other countries as well. KISTI and HLRS in Germany have agreed to share the COVISE and will have research exchanges. As such, it is expected that Korea will play a major role in e-Science research by building strategic and systematic collaborative relations with its International partners.

  • PDF

Assessment of public knowledge, perception, and acceptance of nuclear power in Bangladesh

  • Md Iqbal Hosan;Md Jafor Dewan;Md Hossain Sahadath;Debasish Roy;Drupada Roy
    • Nuclear Engineering and Technology
    • /
    • v.55 no.4
    • /
    • pp.1410-1419
    • /
    • 2023
  • Public perception plays a crucial role in the successful completion of a nuclear power project. As a newcomer country to nuclear power, there are lots of misconceptions among the Bangladeshi people about nuclear energy. Consequently, it is crucial to minimize all the doubts among mass people and build up their positive outlook toward nuclear power. This demands a comprehensive survey to figure out the public opinion, concerns, false impressions, and knowledge gap regarding nuclear power. In the present study, these issues were addressed by a survey that was responded to by 661 persons for the 24 survey questions. The questions were categorized based on information, knowledge, faith, benefit, awareness, and technology. Feedback and responders' basic demographic and socioeconomic information were collected from various locations in Bangladesh through online and in-person surveys. The responses were analyzed in both statistical and descriptive ways. Some of the feedback was found to vary with age, sex, and education level while others were quite independent of these parameters. It is found that socioeconomic development and energy security can be achieved by the inclusion of nuclear energy in the power system master plan of the country. However, huge knowledge gaps and misconceptions were found among the public regarding nuclear energy. As per feedback, political instability and corruption may affect the national nuclear power project in Bangladesh. Low faith in the existing rules & regulations for nuclear power programs was also observed. The result of this study will be handy to develop the communication and public awareness strategy for a successful nuclear power project in Bangladesh.

U-City Service Classification Standard & Cost Sharing Plan through the Case Studies of U-City Construction

  • Yun, Jeong-Ran;Lee, Sang-Hun;Yang, Dong-Suk
    • Land and Housing Review
    • /
    • v.2 no.2
    • /
    • pp.101-109
    • /
    • 2011
  • Recently, the construction of U-City or of U-City service (U-service) in many kinds of urban development projects becomes the general trend. However, as the construction of U-city comes into the spotlight like the trend of the times, various service constructions are being indiscreetly implemented since it's processed focusing on local specialized projects or local landmark project by a local autonomous entity or an institute in charge being off the original purpose of the improvement of living quality of residents and the efficiency of urban management, which causes a number of problems on the process, maintenance, operation and management of those projects. Therefore, this study is to derive the standard pattern of U-service construction through the analysis of patterns and numbers of U-service and problems during the process of construction in domestic U-City construction case district, and is aimed to suggest the reasonable direction of service construction based on this. 11 projects areas in which data related to U-service are available among U-City construction project areas were selected for the subjects of this study, and it's standardized with 228 detailed unit services that were suggested by U-Eco City R&D and with 11 service domains that are regulated in "the Act of ubiquitous city construction etc.", and it is limited to services that were suggested in U-City case area of which design was completed by July, 2010 based on this. The actual state of various U-service construction is analyzed through case studies as well as reviews on the legal and theoretical concept and the method of pattern classification of U-service, the plan for the standardization (pattern classification) of U-service and the plan for the construction body of service and to share the costs are suggested as the plan to construct reasonable U-service based on this for the method and the procedure of this study For the method to construct U-service, the plan to classify the pattern of U-service into the basic service and additional service is suggested, and whether it has the publicity, whether urban infrastructure is included, whether utilities are included, the body of realization, the recipients, the urgency, the importance and the spreading, etc. are suggested for the index to determine the pattern of service. The method to get the executor of a project to construct the basic service, the method to get the executor of a project to construct the most basic service among the group classification of service and to get a private entity and a local autonomous entity to perform additional service in the future, and the method to construct the whole service and to distribute the construction costs were suggested, and the first one that determines the body of construction after dividing U-service into the basic service and the additional service was evaluated to be the most reasonable one. And the plan to solve the problem that the excessive construction costs of U-service are shifted onto the executor of a project through benefit principle, balanced distribution principle and consultation and mediation between the interested parties was suggested for the criteria to share the costs.

Development of Evaluation Model for ITS Project using the Probabilistic Risk Analysis (확률적 위험도분석을 이용한 ITS사업의 경제성평가모형)

  • Lee, Yong-Taeck;Nam, Doo-Hee;Lim, Kang-Won
    • Journal of Korean Society of Transportation
    • /
    • v.23 no.3 s.81
    • /
    • pp.95-108
    • /
    • 2005
  • The purpose of this study is to develop the ITS evaluation model using the Probabilistic Risk Analysis (PRA) methodology and to demonstrate the goodness-of-fit of the large ITS projects through the comparative analysis between DEA and PRA model. The results of this study are summarized below. First, the evaluation mode] using PRA with Monte-Carlo Simulation(MCS) and Latin-Hypercube Sampling(LHS) is developed and applied to one of ITS projects initiated by local government. The risk factors are categorized with cost, benefit and social-economic factors. Then, PDF(Probability Density Function) parameters of these factors are estimated. The log-normal distribution, beta distribution and triangular distribution are well fitted with the market and delivered price. The triangular and uniform distributions are valid in benefit data from the simulation analysis based on the several deployment scenarios. Second, the decision making rules for the risk analysis of projects for cost and economic feasibility study are suggested. The developed PRA model is applied for the Daejeon metropolitan ITS model deployment project to validate the model. The results of cost analysis shows that Deterministic Project Cost(DPC), Deterministic Total Project Cost(DTPC) is the biased percentile values of CDF produced by PRA model and this project need Contingency Budget(CB) because these values are turned out to be less than Target Value(TV;85% value), Also, this project has high risk of DTPC and DPC because the coefficient of variation(C.V) of DTPC and DPC are 4 and 15 which are less than that of DTPC(19-28) and DPC(22-107) in construction and transportation projects. The results of economic analysis shows that total system and subsystem of this project is in type II, which means the project is economically feasible with high risk. Third, the goodness-of-fit of PRA model is verified by comparing the differences of the results between PRA and DEA model. The difference of evaluation indices is up to 68% in maximum. Because of this, the deployment priority of ITS subsystems are changed in each mode1. In results. ITS evaluation model using PRA considering the project risk with the probability distribution is superior to DEA. It makes proper decision making and the risk factors estimated by PRA model can be controlled by risk management program suggested in this paper. Further research not only to build the database of deployment data but also to develop the methodologies estimating the ITS effects with PRA model is needed to broaden the usage of PRA model for the evaluation of ITS projects.

A Quantitative Analysis of Effects on Enhancing Bus Shelter Infrastructure: Focusing on Contingent Valuation Method by an User's Satisfaction Survey (버스정류장 시설 개선의 정량적 효과 분석: 이용자 만족도 조사 기반 CVM을 중심으로)

  • Kyuhyuk Kim;Myounggyu Kim;Nayeon Kim;Heesoo Kim;Tai-jin Song
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.23 no.2
    • /
    • pp.89-105
    • /
    • 2024
  • Bus stop improvement conveys users their usability. It is essential that transportation jurisdictions should identify quantitative effects of a bus stop improvement to invest effectively and expand consistently. Nevertheless, there is currently no research to estimate the quantitative effect on bus stops improvement. In this study, the willingness to pay and the benefit-cost ratio for the bus stops improvement were estimated through a contingent valuation method based on user satisfaction. It was found that the bus stop improvement located in urban areas can achieve high-cost benefits, and it in suburban areas has a great impact on improving the quality of life of local residents. The results of this study will be used as a basis for expanding the bus stop facility improvement project.

A Study of the Development of Returning Land for Farming to Forestry Policy and its Compensation System Change of China (중국의 퇴경환림 사업(退耕還林事業) 및 보상제도에 대한 고찰)

  • Park, Ki-Hyung;Zhang, Yi-Xiao;Chun, Kun-Woo;Wan, Qinqin;Wn, Bin;Lim, Young-Hyup;Youn, Ho-Joong
    • Journal of Forest and Environmental Science
    • /
    • v.27 no.2
    • /
    • pp.101-111
    • /
    • 2011
  • The Returning Land for Farming to Forestry Project in China is similar to the 'The 10-year National Greening Project' of Korea, and is one of the great strategic policies that started in order to develop the people, resources and the environment by the central government of China. Using the ecosystem recovery as the slogan, The Returning Land for Farming to Forestry Project of China has a long history of 70 years, but the accomplishments has been insignificant when compared to the long history. The Returning Land for Farming to Forestry Project was not a trend due to the societal and economical issues of China, but with the increasing interest on the environmental protection in the late 1990s the extent of the ecosystem is gradually increasing. The most difficult, yet most important matter of the Returning Land for Farming to Forestry Project, is that it must consider the ecosystem with the economy. The farmers want financial gains in a short term, and the government aims is gaining cost-benefit over a long period which is why a rational the Returning Land for Farming to Forestry Project of the central government in China is most important. In order for the Returning Land for Farming to Forestry Project of China to develop further in the future, the standardization and distinction of the economic compensation policy is most urgent. Other than this, a new policy and the government interest on the livelihood of the farmers after the completion of the Returning Land for Farming to Forestry Project are needed, and there must be a clear and fair policy enactment environment so that the opinions of the farmers can influence the policy in the policy enactments.