• Title/Summary/Keyword: IT Performance Measurement

Search Result 3,093, Processing Time 0.028 seconds

An Experimental Study to Improve Measurement Reliability for the Airborne Sound Insulation Performance by Laboratory Test (실험실 실험을 통한 벽체 차음성능 측정의 신뢰성 향상을 위한 실험적 연구)

  • Kim, Hang;Park, Hyeon Ku;Ku, Hee Mo;Kim, Sun-Woo
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.24 no.1
    • /
    • pp.35-44
    • /
    • 2014
  • Sound pressure levels in the receiving room while testing airborne sound insulation performance are varied by the measuring points. This may increase the measurement error, then decrease the measurement reliability. With this reason the research has carried out on the method to reduce deviations of sound pressure level in the ISO type rectangular laboratory focusing on the measurement of airborne sound insulation performance. Tests were made to see the effect of sound absorption in the receiving room, loudspeaker locations, microphones locations and flanking transmission path. Consequently, it was resulted that sound absorption in the receiving room and the loudspeaker location have influence on the sound level deviations especially in the low frequency. The microphone location was very important to get measurement reliability. The effective measuring point, which the sound level difference with average sound pressure level is within 2 dB, could yield most reliable average sound pressure level. Therefore it is necessary to find the effective measuring points in the receiving room. Flanking transmission path should be sealed using sound absorber or magnet etc. to prevent from lowering the sound insulation performance.

Measurement Uncertainty Analysis of Performance Test for Coordinate Measuring Machine (3차원 좌표 측정기 성능 시험법에 대한 측정 불확도 해석)

  • Lee, Seung-Pyo;Kang, Hyung-Joo;Ha, Sung-Kyu
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.26 no.4
    • /
    • pp.91-99
    • /
    • 2009
  • Because of both precise measurement and efficient quality control, coordinate measuring machines(CMMs) have been widely used in the industry. The purpose of this paper is to present a method to estimate the CMM measurement uncertainty using design of experiments. A factorial design is applied to carry out the performance test proposed by ISO 10360 and to investigate CMM measurement errors associated to orientation and length of the length bar. In order to assess the measurement uncertainty for the performance test, an analysis of the uncertainty components that make up the uncertainty budget has been carried out. The procedure for evaluating the uncertainty of it follows GUM ("Guide to the expression of uncertainty in measurement"). The results show that the proposed method is suitable to investigate CMM performance and determine the contribution of machine variables to measurement uncertainty.

An Integrated Approach to Measuring Supply Chain Performance

  • Theeranuphattana, Adisak;Tang, John C.S.;Khang, Do Ba
    • Industrial Engineering and Management Systems
    • /
    • v.11 no.1
    • /
    • pp.54-69
    • /
    • 2012
  • Chan and Qi (SCM 8/3 (2003) 209) developed an innovative measurement method that aggregates performance measures in a supply chain into an overall performance index. The method is useful and makes a significant contribution to supply chain management. Nevertheless, it can be cumbersome in computation due to its highly complex algorithmic fuzzy model. In aggregating the performance information, weights used by Chan and Qi-which aim to address the imprecision of human judgments-are incompatible with weights in additive models. Furthermore, the default assumption of linearity of its scoring procedure could lead to an inaccurate assessment of the overall performance. This paper addresses these limitations by developing an alternative measurement that takes care of the above. This research integrates three different approaches to multiple criteria decision analysis (MCDA)-the multiattribute value theory (MAVT), the swing weighting method and the eigenvector procedure-to develop a comprehensive assessment of supply chain performance. One case study is presented to demonstrate the measurement of the proposed method. The performance model used in the case study relies on the Supply Chain Operations Reference (SCOR) model level 1. With this measurement method, supply chain managers can easily benchmark the performance of the whole system, and then analyze the effectiveness and efficiency of the supply chain.

The Case Study on The Introduction and Practical Application of the Budget Management System -On the Performance Measurement of Standard Work Unit- (예산관리제도의 도입과 실제적 운용에 관한 사례연구 -표준적인 작업의 성과측정을 중심으로-)

  • 윤용운
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.2 no.2
    • /
    • pp.39-51
    • /
    • 1979
  • In introducing and applying the budget management system, the question of how to establish management structure(skelton) representing budget management responsible unit is significantly related to the degree of accuracy and analysis on the performance measurement of standard work unit. We have the following rational process of establishing performance measurement of budget management System ; 1) Standardization of work method 2) Establishment of management structure 3) Institution of budget management system. Especially, this system is based on a premise of efficiency of objectives management, it is assumed that performance measurement in the standard work unit must be enforced according to the basis and categories of performance evaluation based on the evaluating work unit. Therefore, most of all, the following three detail questions(subjects) are to be determined in order to rationalize these above principles to a maximum possible extent of performance measurement system. First, we established respective performance standard unit with respect to such detailed work unit, performance standard unit of which were accurately applicable directly from using the budget ana objectives account data and their supplementary data of the work measurement techniques. Second, by using the above mentioned question, over all evaluation and suggestion are made based on the study of the recording for each work unit development, budget management and production nit (volume of production) Third, the measurement of performance of budget management system is based on the principle of standard work unit, compared with the standard basis and actual work unit by period and activities unit and calculated percentage effectiveness according to the above procedure. and so evaluated the efficiency of performance measurement on the budget management system.

  • PDF

The Strategic Performance Measurement of Sea Port: Supply Chain Management Perspectives (공급사슬관리 관점에서의 전략적 항만성과측정)

  • Pak, Myong-Sop
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.38
    • /
    • pp.229-262
    • /
    • 2008
  • With the introduction of supply chain management concept, the nature of a firm is fundamentally changed. Control is no longer based on direct control of the business processes, but rather based on integration across member organizations in the supply chain. Firms are trying to achieve a competitive edge by managing their supply chain performance to gain advantages in cost and service differentiation. The supply chain elements of a sea port involves ILSP (Inbound Logistics Service Provider) at the input side and OLSP (Outbound Logistics Service Provider) at the output side. The goal of sea port is to satisfy the needs of different parties, both upstream and downstream, in the chain with greater effectiveness and efficiency than it's competitors. In this context, the purpose of this paper is to derive conceptualization of the SCP (Supply Chain Performance) in the sea port from literature review on the previous researches and to tackle their theoretical and practical implications. The paper deals with conceptualizing SCP in sea port using the SCOR (Supply Chain Operation Reference) model. It incorporates both the effectiveness and efficiency aspects of performance measurement. And it also recognizes customer related reasons for measuring performance.

  • PDF

Real-time High Resolution PM Monitoring in Seoul (서울지역 미세먼지의 실시간 고해상도 모니터링 방안)

  • Kang, Doo Soo;Bong, Choon Keun;Kim, Dae Seong
    • Particle and aerosol research
    • /
    • v.15 no.2
    • /
    • pp.67-78
    • /
    • 2019
  • Since existing measurement sites are required to construct a high-cost PM measuring device and a measuring site of a large area, there is a limit to the construction of a high-resolution measurement network. Therefore, it is necessary to develop a low-cost, high-performance PM measuring device (as an alternative technology) that can increase the resolution of PM measurement, and it is necessary to establish a base to provide real-time PM information for whole people. Therefore, in this study, the alternative technique (light scattering method) for achieving the above object was examined, performance evaluation was carried out, and it was verified that the light scattering method was usable. Various PM measurement results were compared and analyzed to find PM monitoring points and resolutions we would like to propose.

A Study on the TPM for Performance Management of Weapon System R&D Program (무기체계 연구개발 사업의 성능관리를 위한 기술성과측정에 관한 연구)

  • Hur, Jang-Wook;Noh, Hyun-Il
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.13 no.4
    • /
    • pp.612-618
    • /
    • 2010
  • In order to successfully manage of the state-of-the-art weapon system R&D program which are under the limited budget and schedule but also has a high level of technical risks, it is gaining weights to use such a scientific program management tool as TPM. Therefore, the purpose of this research is to review the concept of the TPM and its relation among MOE, MOP and TPM, and introduce an application method of TPM mainly focusing on helicopter development program. It has the organized structure, detailed procedure and 282 parameters for performance management through the TPM.

Design of Performance Measurement Indicators for the Small and Medium Sized Manufacturing Company (중소(中小)제조업의 성과평가를 위한 성과측정지표 설계 방법)

  • Hong, Hyun-Gi;Oh, Sang-Young
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.4
    • /
    • pp.887-894
    • /
    • 2009
  • Recently many companies has implied the measurement system to measure the organizational and personal performance. For that purpose the measurement system based on Balanced Scorecard(BSC) is broadly implemented. For the successful and effective measurement of performance measurement the design of measurement methodology and indicators should be carried out by experts in this field, and "the objectivity" should be kept in the whole process. But due to the financial difficulties many of the companies have relied on the standard (performance measurement) software, which is avaliable in the market. In this paper the performance measurement. Indicators has been presented for the small and medium sized manufacturing company. As the result of this research the presented performance measurement indicators for administration, operation and R&D part are statistically verified as it is effective.

Project Performance Evaluation and Workload Monitoring Technique by Using Input/Output Bipolar Diagram

  • Lee, Jung-Gyu;Jeong, Seung-Ryul
    • Journal of Internet Computing and Services
    • /
    • v.18 no.4
    • /
    • pp.79-87
    • /
    • 2017
  • Company A, an embedded system manufacturer, provides its products to Company P which is the parent company of Company A. Both companies learned that they needed to find over 4,000 bugs before market release in order to meet the acceptable quality level. Traditionally, they had utilized time-series line graphs as their common performance measurement tool. These graphs compared accumulated numbers of bugs fixed with accumulated numbers of bugs found. Engineers in Company A had been under pressure to improve the process capacity because the line for bugs fixed was always below than the line for bugs found. By using a newly designed Bipolar diagram, engineers in Company A analyzed the process performance. And they were in a position to be more flexible for internal or inter-companies meeting. Authors explain an empirical study of a graphical and practical performance measurement tools relating to mainly the Bipolar diagram. As a result, the Bipolar diagram provides workload monitoring and performance measurement functions in a given timeframe by using the concepts of Optimum Process Line (or band) and Fair Process Capacity Zone.

Active Measurement Analysis of KREONET using Modified PingER

  • Lee, Man-Hui
    • Journal of Scientific & Technological Knowledge Infrastructure
    • /
    • s.7
    • /
    • pp.134-140
    • /
    • 2001
  • To know about the performance of KREONET, we installed an active network performance measurement tool, PingER. For customization, we modified its architecture and some codes. Although this customization is a minor change of PingER, it gives much benefit and convenience for both operators and users. Using PingER, we can measure the effect of the STAR TAP link. The new networking through the link is a little bit slower than the previous networking. But the new link shows far fewer packet losses and provides more reliable networking.

  • PDF