• 제목/요약/키워드: IT Performance Measurement

검색결과 3,093건 처리시간 0.029초

A Risk Performance Measurement System for the Mega-Project

  • Kim, Seon-Gyoo
    • Architectural research
    • /
    • 제12권1호
    • /
    • pp.57-64
    • /
    • 2010
  • In recent years, interests and studies on the urban regeneration projects have been increased and largely conducted. It is a part of the effort that solves some social and economical problems occurred by deteriorated buildings and degraded infrastructures through new urban regeneration projects or redevelopment projects. However, the urban regeneration projects show the characteristics that can not guarantee in the project performance because the projects have various and complex stakeholders related to these projects and are exposed to lots of risks due to its huge scale. This study proposed the risk performance index method to improve the efficiency of the overall performance measurement for a mega-project by extending from the traditional cost/schedule based performance measurement system. The risk performance index method proposed in this study has a similar system to the EVMS, and makes possible to perform a three dimensional integrated performance measurement in cost/schedule/risk through 18 different indexes that compose the risk performance index.

A Risk Performance Measurement System for the Construction Project

  • Seon Gyoo Kim;Jin Bong Kim;Moon Serk Young;Bong Cheol Jeon;Han Kim;Young Jeong Yu
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1591-1598
    • /
    • 2009
  • Recently, the researches on the urban regeneration projects have been performed very actively. It is a part of the effort that solves some social and economical problems occurred by deteriorated buildings and degraded infrastructures through new urban regeneration projects or redevelopment projects. However, the urban regeneration projects show the characteristics that can not guarantee in the project performance because the projects have various and complex stakeholders related to these projects and are exposed to lots of risks due to its huge scale. This study proposed the risk performance index method to improve the efficiency of the overall performance measurement for a mega-project by extending from the traditional cost/schedule based performance measurement system. The risk performance index method proposed in this study has a similar system to the EVMS, and makes possible to perform a three dimensional integrated performance measurement in cost/schedule/risk through 18 different indexes that compose the risk performance index.

  • PDF

시각측정시스템의 캘리브레이션 및 측정성능 검토 (Calibration and INvestigation into Measurement Performance of a Visual Sensing System)

  • 김진영;조형석
    • 한국정밀공학회지
    • /
    • 제16권8호
    • /
    • pp.113-121
    • /
    • 1999
  • It is necessary to calibrate measurement systems to enhance its measurement accuracy. The visual sensing system that is presented in our previous work has to be calibrated, too. It is a multiple mirror system for three-dimensional measurement, which is composed of a camera and a series of mirrors. It is important to calibrate the positions and orientations of the mirrors relative to the camera because they have direct influence on the relationship between the image plane and the task space. This paper presents the calibration method for the visual sensing system. To confirm the measurement performance of the implemented system. its measurement accuracy in measuring the locations in three-dimensional space is investigated. A series of experiments for measuring the locations of the circle-shaped marks are performed. Experimental results show that the sensing system can be effectively used for three-dimensional measurement.

  • PDF

Distribution Channel Performance Measurement: Valid Measures From Customers' Perspective

  • Kim, Sang-Youl
    • 한국항해항만학회지
    • /
    • 제32권2호
    • /
    • pp.141-148
    • /
    • 2008
  • This paper is structured into three main parts and a conclusion. The main section provide definitions of efficiency, effectiveness and performance in terms of the distribution channel, followed by a review of related performance measurement, before discussing difficulties of measurement. According to the theoretical approach, it appears that key theroretical issues are centered around customer service, logistics excellence, time compression, the use of IT, and a move towards integrated logistics. The empirical approach shows that in the past, various financial performance indicators were regarded as relevant management information. However, today, management needs additional performance indicators. Therefore, external assessments of effectiveness must be performed to measure customers' satisfaction with the physical flow of product through the distribution channel network. So, what is needed is to take previous normative and explorative research and progress through a framework by developing valid measures of distribution channel's effectiveness and efficiency, and identifying research methodologies suited to the data collection requirements.

접지전류 측정에 의한 다중 접지계통의 접지저항 측정 (Measurement of Resistance of Multi-Grounded System by Ground Current Measurement)

  • 최종기;안용호;정길조;한병성;김경철
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제53권4호
    • /
    • pp.234-237
    • /
    • 2004
  • Measuring ground resistance has been a popular method of evaluation of the grounding electrode performance. If some portions of grounding electrodes are lost by corrosion, aging or other reasons, consequent deteriotation of the grounding performance would be resulted. It is one of the reasons why it is required to evaluate the performance of grounding systems regularly. However, in case of the electric facilities with multi-grounded system such as power substations with multi-grounded overhead ground wires and/or distribution line neutrals, it is practically difficult to disconnect neutrals or skywires from the substation grounding mesh for the ground resistance measurement. In this paper, a method for the grounding performance measurement of multi-grounded systems, which is based on the measuring ground current distributions, has been proposed. A field test results has shown the validity of the proposed test method.

접지전류 측정에 의한 다중 접지계통의 접지저항 측정 (Measurement of Resistance of Multi-Grounded System by Ground Current Measurement)

  • 최종기;안용호;정길조;한병성;김경철
    • 대한전기학회논문지:전기기기및에너지변환시스템부문B
    • /
    • 제53권4호
    • /
    • pp.234-234
    • /
    • 2004
  • Measuring ground resistance has been a popular method of evaluation of the grounding electrode performance. If some portions of grounding electrodes are lost by corrosion, aging or other reasons, consequent deteriotation of the grounding performance would be resulted. It is one of the reasons why it is required to evaluate the performance of grounding systems regularly. However, in case of the electric facilities with multi-grounded system such as power substations with multi-grounded overhead ground wires and/or distribution line neutrals, it is practically difficult to disconnect neutrals or skywires from the substation grounding mesh for the ground resistance measurement. In this paper, a method for the grounding performance measurement of multi-grounded systems, which is based on the measuring ground current distributions, has been proposed. A field test results has shown the validity of the proposed test method.

Revised PPC Measurement Method considering Interfering Float Weight of Task

  • Jung-Sook Yun;Hyung-il Kim;Jung-Ho Yu;Chang-Duk Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1479-1484
    • /
    • 2009
  • It is commonly recognized to need performance management for successful construction project. PPC measurement of Last Planner System is one of construction project measurement method. PPC measurement is quantitatively assessment to go through construction, and that is not completely to be trusted when compare a project with another or an individual case work with another in same project. According to, purpose of this study is comparison indicator establishment that compare project with another or an individual case work with another it is not use PPC measurement for quantitatively assessment to go through construction. The procedure of this study is derive of the point at issue of existing PPC measurement for a aim PPC measurement in this study expenditure and select weight about that and it is applied to actually construction.

  • PDF

신재생에너지 지열을 이용한 열펌프유닛의 성능에 관한 실험적 연구 (An Experimental Study on the Performance of Heat Pump Unit Using Geothermal Heat for New Renewable Energy)

  • 정순영
    • 한국수소및신에너지학회논문집
    • /
    • 제31권6호
    • /
    • pp.630-636
    • /
    • 2020
  • This paper presents a experimental study on the performance of the heat pump. Uncertainty of measurement means the degree of uncertainty in the measurement. Therefore, it estimates a section where expected value of the measurement might be within a certain confidence level and suggests a range where measured representative value might be incorrect. Uncertainty of measurement is a parameter that shows characteristics of dispersion of measured value that was reasonably estimated from measured quantity. Measurement result of performance experiment is not a true value but estimated value that was estimated reasonably. Therefore, uncertainty of measurement needs to be calculated and presented with the result of measurement.

건설산업 성과측정 기법 적용에 대한 연구 (A Study of the Application for performance measurement on Domestic Construction Industry)

  • 신용일;김한수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.285-290
    • /
    • 2001
  • 어느 특정 기업이나 조직의 생산활동이 견실하게 수행되고 있는 가를 평가하는 것에는 여러 가지 방법이 있을 수 있으나 가장 포괄적인 것으로 '성과(Performance)'를 들 수 있다. 성과측정은 그 자체만을 놓고 볼 때, 불완전한 요소를 많이 가지고 있다는 비판을 받기도 하지만, 이를 통해 기업은 스스로 문제를 진단하고 개선하려는 노력을 할 수 있으므로 기업경영의 목적을 달성하기 위해 반드시 필요한 수단이라 할 수 있다. 측정 할 수 없는 것은 관리 할 수도 없고 개선할 수도 없다는 사실을 인식해야 한다. 본 논문은 성과측정 기법이 활발히 수행되고 있는 외국 건설산업의 성과측정 기법과 그 항목을 알아보고, 국내 건설사업에 성과측정을 도입할 때 고려해야할 항목 및 국내 도입시의 문제점과 한계점에 대해서 알아보고자 하는 것이다. 본 논문으로 국내건설산업 및 프로젝트에서 활용되어질 수 있는 성과측정 기법이 도입되고 개발되는데 일조 하고자 한다.

  • PDF

대학 지식경영 성과측정시스템의 진단 사례연구 (Diagnosis of Performance Measurement System of Knowledge Management : A Case of University)

  • 이영찬;이승석
    • 지식경영연구
    • /
    • 제10권1호
    • /
    • pp.71-100
    • /
    • 2009
  • Recently, many of organizations build up their performance measurement system (PMS) to measure their knowledge management performance. However, the system that doesn't well reflect the organization's strategies as well as surroundings could obstruct their performance improvement, instead. Therefore, It is really important to establish the PMS to reflect organization's surroundings and strategies. The purpose of this study is to make a diagnosis of a performance measurement practice of a domestic university's knowledge management. To serve this research purpose, we examine the uptight performance index and PMS from existing references. And we diagnose the specific practices and maturity rates of measuring performances, and the recognition of the performance index at "D" university recently adopting balanced scorecard to performance evaluation through the survey on academic affairs committee members, performance evaluation committee members, and administration members. The method analyzing data from the survey is a gap analysis which includes alignment analysis, congruence analysis, consensus analysis, and confusion analysis. We make a diagnosis of performance measurement practices at "D" university, raise several points of this performance measurement system, and present the improvement plans from these problems.

  • PDF