• 제목/요약/키워드: IT Logistics

Search Result 2,186, Processing Time 0.028 seconds

Development of the Master plan for Industrial railway tracks (철도인입선 정비기본계획 추진방향 연구)

  • Kim Hyun-Woong;Moon Dae-Seop
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.902-906
    • /
    • 2005
  • The ability of freight users to identify and to utilize options to move is limited. Saving in time and in fare to freight users could be significant if whole transport sequences could be planned and implemented with high level of service. In oder to improve the attractiveness of rail freight, it is essential that the industrial railway tracks between railway network and large scale logistics facilities are completely equipped. This article present the direction of the master plan of Korean industrial railway tracks.

  • PDF

Arbitration in Singapore

  • Mardiani, Henny
    • Journal of Arbitration Studies
    • /
    • v.16 no.3
    • /
    • pp.217-230
    • /
    • 2006
  • Singapore is a dual-track arbitration regime. Where seat of arbitration is Singapore, the governing procedural law for domestic arbitration is AA and for international arbitration is IAA. The parties may by agreement opt-out of and opt-into a specific regime. SIAC is a leading arbitral institution in Singapore. It offers wide range of services: administer arbitration proceedings, arrangement of logistics for arbitration hearing, appointment of arbitral tribunal for ad hoc arbitration in Singapore as well as registry and authentication of arbitral awards.

  • PDF

A Study on Cargo Picking Safety Work: Focusing on Rack Work Place (보관작업장 사고방지 예방에 관한 연구: 렉 작업장을 중심으로)

  • Chung, Byung Hyun;Kim, Ki Hong
    • Journal of the Korea Safety Management & Science
    • /
    • v.24 no.3
    • /
    • pp.23-28
    • /
    • 2022
  • Rack is a place to store products. Workers pick products from rack storage. After picking up, workers move to another location by forklift. Driving speed, worker condition, and number/frequency of operation is responsible for forklift accidents. When an accident occurs, products get damaged. Therefore, it is important to prevent one. As the research result, To prevent forklift accidents, the minimum order quantity, the minimum number of operations, and low speed operation are required.

A Study on the Non-market Economic Value of Marine ranches and Marine Forests Using Contingent Valuation Method (조건부가치측정법(CVM)을 이용한 바다목장과 바다숲의 비시장 경제가치 연구)

  • Kim, Soon-Mi;So, Ae-Rim;Shin, Seung-Sik
    • The Journal of Fisheries Business Administration
    • /
    • v.51 no.3
    • /
    • pp.1-15
    • /
    • 2020
  • The Korean government has been carrying out the marine ranch development project since 1998 with the purpose of responding to the decrease in coastal fishery resources and fishery income, preparing a systematic management system for the sustainable use of fishery resources and realizing advanced fisheries power by expanding and upgrading fisheries resource development projects. In addition, the government established the Korea Fisheries Resources Agency and promoted projects for the protection and management of fishery resources by increasing basic productivity by artificially creating marine forests in areas where whitening events occur. Since the project of building marine ranches and marine forests requires immense government financial support, it is important to estimate the economic value and thoroughly evaluate the feasibility of the project. In this paper, the project of non-market economic value of the development of marine ranches and the development of marine forests was estimated. CVM (Contingent Valuation Method) was applied as a methodology for benefits estimation. Prior to the analysis, a one-on-one interview survey was conducted with participation of 512 residents and 514 residents respectively for the project of creating a marine ranch and developing a marine forest. A DBDC (Double-Bounded Dichotumous Choice) model was applied in the WTP (Willingness To Pay) analysis model and the socioeconomic variables of the surveyor, such as sex, age, education and income, were reflected in the model. The economic benefits from the two projects, namely, building of marine ranches and developing marine forests were estimated to be equal to 4,608 won and 7,772 won per household per year, respectively. According to the results of the survey, it seems that respondents think that marine forests are more valuable than marine ranches. This is as a result of ordinary citizens' thought that the marine ranches are more cost-effective than the marine forests. The benefits estimated through this study can be used for analysis of economic feasibility prior to carrying out the project of building marine ranches and developing marine forests, and are considered to be the valuable for policy-making purposes and finding social and economic consensus.

Mid-term Requirement of 'Elements of Depot Maintenance' draft (창정비요소 개발 과정정립을 통한 창정비요소개발 발전을 위한 제언)

  • Ahn, Jung-Jun;Kim, Jong-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.3
    • /
    • pp.638-647
    • /
    • 2018
  • We have to prepare for the existing threats from North Korea and potential threats in the future. It is important to utilize our resources as effectively as possible to build military power that brings victory in a war. Based on a sustainable required operational capability, weapons systems at the acquisition stage need to maintain a combat-readiness posture and ensure operational sustainability. To achieve this, establishment of procedures that develop elements of depot maintenance at the beginning, which enables economical and effective depot maintenance during that stage, is essential. First, the requirement paper needs to develop the concept of the depot maintenance requirement through the pre-study outlined by this paper. Second, at the system development stage, a Development Plan of Depot Maintenance draft should be proposed. This is the initial paper that can develop the elements of depot maintenance, and it should be verified by a field test. Third, each force's logistics command should write a Depot Maintenance Direction draft and a Mid-term Requirement of Elements of Depot Maintenance draft with the proven Development Plan of Depot Maintenance draft. Also, the verified paper needs to be realized and renewed by the time the Requirement of Elements of Depot Maintenance draft is completed. In conclusion, the procedures explained above will contribute to build an economical and effective military power in a reality faced with a resource shortage and threats from the enemy.

A Study on Legal Argument to the Overstorage Charge on the Long Storage Containers (장기체화 화물에 대한 경과보관료 적용에 관한 법률쟁점 - 부산지방법원 2011. 8. 18. 2009가합14442 판결 평석 -)

  • Ji, SangGyu
    • Journal of Korea Port Economic Association
    • /
    • v.28 no.4
    • /
    • pp.275-298
    • /
    • 2012
  • Terminal operators have provided special services such as loading, discharging, stowage of cargo to the owner, and carriers of the sea, which contribute the domestic and international logistics. For smooth flow of logistics, container terminal should reserve spaces for inbound and outbound logistics. However, if it is unable to provide the spaces, which can be caused by labour strikes or terminal lockouts and so on, national logistic system and financial management of terminal operators can be seriously affected. In order to minimize these kinds of problems, terminal operators impose high rate of charges ("overstorage charge") to the accumulated cargoes and/or containers, which are stipulated in terminal service agreement. Nevertheless, if there is no terminal service agreement with an owner of cargo and/or container, any kind of charge can cause legal problems (conflict ??) between the cargo and terminal operator. In this regard, I would like to study on the definition of overstorage charge and the legal issue of it based on the Busan district court's judgment. In particular, I will propose a special right of commercial lien and public auction for terminal operators to settle accumulated cargoes in container terminal.

The Effects of Supply Chain Flexibility and Competitive Advantage Strategy (공급사슬유연성이 경쟁우위전략에 미치는 영향)

  • Lee, Wook-Gee;Kim, Dong-Hyuk;Kim, Joo-Wan;Jung, Chi-Young
    • Journal of Digital Convergence
    • /
    • v.11 no.6
    • /
    • pp.91-101
    • /
    • 2013
  • The purpose of this study is to empirically verify the relationship between supply chain flexibility(process flexibility and logistics flexibility) and competitive advantage strategy(cost, quality, lead time). To accomplish these purposes, the relationships among supply chain flexibility(process, logistics), competitive advantage strategy(cost, quality, lead time) were modeled based on the studies conducted in the various areas. In order to collect the related data the questionaries of 500 were distributed to the employees working at the manufacturing industry in the area of Gumi. The collected data were analyzed with SPSS 18.0 for Windows. This study used the statistical techniques such as descriptive analysis, reliability analysis, factor analysis, correlation analysis, multi regression analysis. The results of the study show that process flexibility had positively significant effect on low cost strategy and high quality strategy and logistic flexibility have positively significant effect on delivery speed strategy. However, it was found that process flexibility did not have the significant effect on delivery speed strategy, and the logistic flexibility did not have the significant effect on low cost and high quality strategy. Thus, it is expected that each enterprise can maximize corporate strategies by applying different flexibility strategy depending on the competitive advantage strategy.

Models for Determining the Vehicle and Pedestrian Volumes for the installation of Pedestrian Pushbuttons (보행자 작동신호기 설치기준 정립을 위한 적정 차량 및 보행자 교통량 추정모형)

  • YOON, Seung Sup;YANG, Jae Ho;KIM, Nam Seok
    • Journal of Korean Society of Transportation
    • /
    • v.33 no.5
    • /
    • pp.488-496
    • /
    • 2015
  • The main reason to install pedestrian pushbuttons is improving traffic operations. The current guideline for the installation of signal systems with pedestrian pushbuttons is car-oriented. It is difficult to clearly understand the guideline because there isn't an in-depth study to compare the pros and cons of the pedestrian- and vehicle-oriented methods in terms of waiting time. Thus, this study aims to estimate the waiting times of pedestrians and vehicles. The two delay times are compared considering the hypothetical circumstances such as geometry, pedestrian crossing time, pedestrian/vehicle counts and arrival distribution. The results show that when the pedestrian traffic volume exceeds 97 ped/h in the case of a two-lane road (one lane in each direction) the pushbutton system is effective and beneficial to pedestrians. It means that the total waiting time of pedestrians is less than the one of vehicles. Additional four scenarios are designed and tested by varying the number of lanes and design speeds. In conclusion, the pushbutton signal is more beneficial for pedestrians when the number of pedestrians is less than or equal to 85, 70, and 70 ped/h for the three-lane scenario, the four-lane with the design speed of 80km/h scenario, and the four-lane with the design speed of 100km/h, respectively.

Shortest Path Problems of Military Vehicles Considering Traffic Flow Characteristics (교통류특성을 고려한 군화물차량군 경로선정)

  • 방현석;김건영;강경우
    • Journal of Korean Society of Transportation
    • /
    • v.21 no.2
    • /
    • pp.71-82
    • /
    • 2003
  • The shortest path problems(SPP) are critical issues in the military logistics such as the simulation of the War-Game. However, the existing SPP has two major drawbacks, one is its accuracy of solution and the other is for only one solution with focused on just link cost in the military transportation planning models. In addition, very few previous studies have been examined for the multi-shortest path problems without considering link capacity reflecting the military characteristics. In order to overcome these drawbacks, it is necessary to apply the multi-shortest paths algorithm reflecting un-expected military incidents. This study examines the multi-shortest paths in the real networks using Shier algorithm. The network contains both military link capacity and time-based cost. Also, the modes are defined as a platoon(group) rather than unit which is used in most of previous studies in the military logistics. To verify the algorithm applied in this study. the comparative analysis was performed with various sizes and routes of network which compares with Dijkstra algorithm. The major findings of this study are as follows ; 1) Regarding the unique characteristics of the military transportation plan, Shier algorithm, which is applied to this study, is more realistic than Dijkstra algorithm. Also, the time based concept is more applicable than the distance based model in the military logistics. 2) Based on the results from the various simulations of this study the capacity-constraint sections appeared in each scenarios. As a consequence, the alternatives are necessary such as measures for vulnerable area, improvement of vehicle(mode), and reflection of separated-marching column in the military manuals. Finally. the limits and future research directions are discussed : 1) It is very hard to compare the results found in this study. which is used in the real network and the previous studies which is used in arbitrary network. 2) In order to reflect the real military situations such as heavy tanks and heavy equipment vehicles. the other constraints such as the safety load of bridges and/or the height of tunnels should be considered for the future studies.

A Non-strict Hub Network Design for Road Freight Transportation considering Economies of Scale (규모의 경제효과를 고려한 도로화물수송의 비제약 허브네트워크 설계)

  • Kim, Nam-Ju;Kim, Yong-Jin;Kho, Seung-Young;Chon, Kyung-Soo
    • Journal of Korean Society of Transportation
    • /
    • v.26 no.6
    • /
    • pp.103-112
    • /
    • 2008
  • Implementing hub networks in logistics is generally attractive and effective because of cost savings derived from economies of scale on network transportation, and objective of the hub network design problem is to decide optimal hub locations, and the transportation route of each origin-destination pair. This problem is generally a NP-complete problem not to solve easily, and it is almost impossible to find optimal solutions considering the big-sized network within a reasonable time. This research tried to find optimal logistics strategy in the given big-sized real network and the freight origin-destination data. The objective function, which was proposed by Honor and O'kelly (2001), that rewards economies of scale on network links with increase of transportation volumes, is applied. This thesis proposed the optimal hub network of korea within a reasonable time based on engineering approaches. And it is expected that this thesis can contribute to plan freight policies which can improve to have competitive power in the level of a company or nation by reducing logistic costs.