• Title/Summary/Keyword: IT Evaluation

Search Result 30,207, Processing Time 0.048 seconds

Development of Measurement and Evaluation Technique for Software Quality in Design Phase (설계단계에서의 소프트웨어 품질측정과 평가기법 개발)

  • 장영숙;권영식
    • Journal of Korean Society for Quality Management
    • /
    • v.27 no.3
    • /
    • pp.94-112
    • /
    • 1999
  • It is booming to use computer and information owing to the information society. As software applications have grown, so too has the importance of software quality. Therefore, software quality measurement and evaluation are necessary to satisfy the users who are using computers. The ISO/IEC 9126 defines six quality characteristics and twenty-one subcharacteristics including forty inter quality characteristics. We developed software measurement and evaluation technique using the check list in accordance with the ISO/IEC 9126 in design phase. We applied idea and concept of Total Quality Management in order to evaluate and measure the quality of software. Namely, it is the concept such as "you should do it right the first time." or "you have to build quality in the process." We executed the quantitative evaluation of software, also had shown the distinctive result in order that users and developers can find the errors easily. We evaluated the quality of academic softwares in order to verify developing technique at S college. As a result of the evaluation, this college has found it necessary to maintain the software as soon as possible because academic systems are not adequate for users at this present time.

  • PDF

A Performance Evaluation Mode1 for Information Systems using the Balanced Scorecard and the Value Chain : A Case Study (BSC와 가치사슬을 이용한 정보시스템의 성과 측정 방법 : 제조업체 사례분석)

  • 최경현;김태균
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.27 no.2
    • /
    • pp.63-79
    • /
    • 2002
  • During the last decade many enterprises spent a huge amount of money for investment on Information Technology (IT) & Information System (IS) to attain competitive advantage and to maximize their business performance by satisfying the various requirements of customers. Under such circumstances, methodologies for evaluating IT impact on business performance are very important issues for strategic decision making on investment. In this study, we propose a performance evaluation model that adopts the concept of the Balanced Scorecard (BSC) and the Value Chain to analyze the financial impact and non-financial impact of IT & IS at each critical work area. This model combines the 4 evaluation areas from BSC and 6 critical work areas from Value Chain and measures the Key Performance Indicator (HPI) and the effect of KPI. Also, we present a case study of which the evaluation model has been conducted on a major manufacturing company. finally. we address some important notes to improve the IT & IS performances in the real-world.

A Study on performance Evaluation Technique for new Computer System Selection

  • 김성조
    • Communications of the Korean Institute of Information Scientists and Engineers
    • /
    • v.5 no.2
    • /
    • pp.41-48
    • /
    • 1987
  • This paper is concerned with selection evaluation technique among three major performance evaluation techniques which are suitable for new computer system selection. It will discuss benchmarks, synthetic programs and simulation among various techniques for selection evaluation. It will show a formal technique using integer programming models for selecting a suitable job mix. It will suggest a simple method for comparing performance evaluation results. It will also provide benchmarks and synthetic program operation rules and expected outputs in appendix.

A Selection Process of COTS Component And Quality Evaluation Techniques (상용컴포넌트 선정 프로세스 및 품질 평가 기법)

  • Oh, Kie-Sung
    • Journal of Information Technology Services
    • /
    • v.2 no.1
    • /
    • pp.123-133
    • /
    • 2003
  • Because of rapid evolution of software technique, numerous software professionals have been concerned with component based development methodologies. However, it is hard to find out a systematic technique for the selection of COTS (Commercial Off The Shelf) component in consumer position. Up to date, the major of component quality evaluation is object-oriented metric based evaluation methodology. But this paper present four step process and evaluation criteria based on MCDM (Multiple Criteria Decision Making) technique for optimal COTS component selection in consumer position. Weconsidered funtionality, efficiency, usability based on ISO/IEC 9126 for quality measurement and executed practical analysis about commercial EJB component in internet. This paper show that the proposed selection technique is applicable to optimal COTS component selection.

A Case Study on Business Model Evaluation for Broadcasting Telecommunication Convergence Service (차세대 방통융합서비스 사업모델 평가에 관한 사례)

  • Lim, Gyoo Gun;Kang, Sangug;Seol, Joongho;Yu, Dengsheng
    • Journal of Information Technology Services
    • /
    • v.16 no.1
    • /
    • pp.83-98
    • /
    • 2017
  • Broadcasting telecommunication convergence service means a service where broadcasting and telecommunication converge. Recently with the advancement of technology, broadcasting telecommunication convergence service has been evolving to provide multimedia contents through various devices including wired and wireless network environment. Up to now, IPTV and smartphone-based convergence services have been dominant, but more developed and evolved technology and media will appear in the future. In order to derive the next generation broadcasting telecommunication convergence service supporting model, this study derives an evaluation model of broadcasting telecommunication convergence service and presents a case of evaluation of 30 demonstration projects supported by the Korean government from 2010 to 2014. In this study, we derive an evaluation model and evaluate the demonstration projects by reflecting the position of the main stake holders of service such as users, experts, and related organizational institutions, away from the existing simple service evaluation method. Expert questionnaire used AHP (Analytic Hierarchy Process) method, and the evaluation results were divided into upper and lower groups to provide key implications by a gap analysis. From this analysis this study suggests guidelines for next generation broadcasting telecommunication service support projects. The next generation broadcasting convergence service business should be based on open platform type in terms of service type. In terms of service media, it should be centered on open devices such as smart phones and smart TVs. In terms of types of business responsibilities, it should be led by public organizations and it is necessary to increase the fund matching ratio by at least 62% when the private sector participates.

A Study on the Performance Evaluation System of Conventional(ASSM) Road Tunnels (재래식(ASSM) 도로터널의 성능평가 체계 연구)

  • Park, Kwang-Rim;Chung, Jee-Seung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.4
    • /
    • pp.27-36
    • /
    • 2018
  • Although the current evaluation system has been revised four times since it was revised in 1996, it is insufficient to utilize it as a basis for predicting the performance degradation from the long-term viewpoint and prioritization decision for the budget input due to the evaluation system limited to securing the structural safety. Therefore, this study proposes a new evaluation system suitable for the performance evaluation of conventional (ASSM) tunnels among the various types of existing road tunnels using Delphi technique and AHP technique. Since the existing evaluation systems and evaluation items in domestic and overseas are limited in scope of evaluation criteria, the survey was conducted in conjunction with closed questionnaires on existing items and open questionnaires for eliciting new items. The validity of the questionnaire results were verified and the performance evaluation factors suitable for conventional (ASSM) tunnels were derived. After calculating weighted value of the derived evaluation item using AHP technique, a new evaluation system is proposed to meet the characteristics of the ASSM tunnel, so that they can be used as reference materials for revising and supplementing detailed guidelines of performance evaluation in the future.

The Effectiveness of the Use of Distance-Evaluation Tools and Methods among Students with Learning-Difficulties from the Teachers' Point of View

  • Almaleki, Deyab A.;Khayat, Wejdan W.;Yally, Taghreed F.;Al-hajjaji, Aysha A.
    • International Journal of Computer Science & Network Security
    • /
    • v.21 no.5
    • /
    • pp.243-255
    • /
    • 2021
  • This study aimed to identify the effectiveness of the use of distance-evaluation tools and methods among students with learning difficulties from the teachers' point of view, to achieve this goal. A scale was built, and the psychometric characteristics were validated. It consisted, in its final form, of 17 items distributed on four axes, in addition to three open questions. It was applied to a random sample of (149) teachers of students with learning difficulties in Makkah Region. The results showed that teachers' keenness to encourage students with learning difficulties, so that they would not feel frustrated with the distance learning process. It was also evident that teachers did not use achievement portfolios in the evaluation process. In connection with the appropriate evaluation methods, the majority indicated the use of work sheets and visual evaluation methods that rely on audio and visual skills, such as presenting videos, pictures, audio and games, and applying short objective tests. Among the proposals to improve evaluation methods and tools: Individual evaluation, attention to individual treatment, obligating personal attendance of students to school, splitting the required tasks, and not increasing the skills required to be mastered. As for the obstacles that teachers face: Lack of time, difficulty in communicating with students with distance learning difficulties and problems related to the Internet such as interruption, weakness, or lack of availability.

A Study for Evaluation Method of Safety Critical Software in Avionics Industry (안전필수 항공 산업용 소프트웨어 평가 방법 연구)

  • Lee, Hongseok;Kwon, Goohoon;Ko, Byeonggak
    • Journal of Advanced Navigation Technology
    • /
    • v.19 no.2
    • /
    • pp.91-97
    • /
    • 2015
  • This paper specifies several considerations about assessing safety-critical software in the aerospace domain. In order to evaluate safety critical software in the aerospace industry, it is required to identify an information of evaluation criteria of software under evaluation. The information is specified in the standard, but determination of evaluation criteria cannot be decided by itself and depends on the results of safety assessment of a system and system design. Thus, this paper explains required information of system development standard and safety assessment standard to determine software evaluation criteria. It surveys existing methodologies about evaluating software, and suggests method which is adapted to evaluation of an advanced surface movement guidance and control system (A-SMGCS) software.

An Evaluation Methodology for Selection of IT Outsourcing Service Vendors (IT 아웃소싱 서비스 수행업체 선정을 위한 평가 방법론 개발)

  • Jeong, Seon-Phil;Kim, Yeong-Real
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.12 no.4
    • /
    • pp.153-163
    • /
    • 2007
  • Many organizations have been outsourcing not only simple tasks but Information Systems and business processes rapidly. IT outsourcing is considered as a critical strategy of businesses these days. Anyhow, many companies still have IT solution problems even though they have been outsourcing their IT department or functions. Moreover, many companies have difficulties when it comes to the selection a proper IT outsourcing service vendor. This study focused on evaluation methodology for small and medium sized organizational selection of IT outsourcing provider. This study's results is a presentation of an evaluation methodology using the AHP weighted value of the factors and the factors' variables. Small and medium sized organizational managers can refer to this study's result as an evaluation index and methodology at the beginning of their IT outsourcing project or for changing their vendors.

  • PDF

Performance Evaluation Model for Public-Private Partnership Projects - with Reference to BTO (Build-Transfer-Operate) Road Projects - (민간투자사업 성과평가 모델 개발 및 적용 - 도로 부문 사업을 중심으로 -)

  • Park, Hyeon;Park, Inseok;Lee, Shin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.83-95
    • /
    • 2018
  • The aim of this paper is to develop a performance evaluation model for PPP (Public-Private Partnership) projects that appropriately reflects the important traits that are unique to PPP projects. To this end, 1) it defines a set of distinct perspectives involved in the PPP projects and their associated success factors that might differ amongst the perspectives; 2) it identifies the key performance indicators and suggests the performance evaluation criteria for each indicator; and 3) it builds a performance evaluation model by matching the success factors from each perspective with performance measure criteria as well as applies the model to the two selected BTO road projects in Korea. The process of model construction and its application confirms significant differences between the main stakeholder perspectives typically involved in PPP projects, which highlights the need for an evaluation model tailored for PPP projects by taking into account the distinct perspectives. The results from the PPP evaluation model developed in the study is compared against the results from the existing ex-post evaluation model for construction projects in general. The former shows a closer match with the results from the user satisfaction survey conducted. This new evaluation framework and the performance indicators entailed in it permits a balanced evaluation of PPP projects as it takes into account different perspectives involved in PPP projects as well as an understanding of the factors affecting the success of PPP projects. While the construction of the model is based on transport projects, it is applicable to different types of PPP projects through variation with the weight allocation amongst different success factors and/or additions or other adjustments to the performance evaluation criteria as required.