• Title/Summary/Keyword: IPC girder bridge

Search Result 15, Processing Time 0.022 seconds

Monitoring of Long-Term Behavior of The Continuous IPC Girder Bridge (IPC거더 연속교의 장기거동 모니터링)

  • Lee, Hong-Woo;Ahn, Jeong-Seang;Kim, Kyoung-Won;Yu, Sang-Hui
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.349-352
    • /
    • 2008
  • IPC girder is more prestressed and has smaller sectional area than the conventional PSC-I type girder due to incremental prestressing along the construction process. The continuous IPC girder bridge may have problems in serviceability and stresses at internal supports because it is very flexible. In this paper, The long-term behavior of the continuous IPC girder bridge is studied through long-term structural analysis and monitoring the deflections. The long-term behavior is monitored right before the introduction of 2nd prestressing that is the construction process different from the conventional PSC-I type girder bridge. The total station of high-precision was used in measuring the deflections. According to the monitoring result so far, the continuous IPC girder bridges does not show remarkable long-term behavior like severe camber or deflection and the measured deflections are very similar to the results of long-term structural analysis.

  • PDF

Load Bearing Capacity Evaluation of Continuous IPC Girder Bridge. (IPC 거더 연속교의 실교량 내하력 평가 연구)

  • Han, Man-Yop;Hwang, Eu-Seung;Jin, Kyung-Seok;Kang, Sang-Hoon;Shin, Jae-Woo
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2005.05a
    • /
    • pp.475-478
    • /
    • 2005
  • This study was performed to evaluate about load bearing capacity of continuos IPC Girder Bridge under and after Construction. This is Ichi-1 Bridge that is 2-40m span continuous bridge on a extension road through the Ichun and the Naesa. The result of static loading test to use a 25ton truck after construction, deflection ratio is 0.64 that is $35\%$ and average of response ratio is 0.48$\~$0.89 that is less than theoretical value. The result of dynamic loading test, the number of proper vibrations is 3.06Hz that is like theoretical value 3.61Hz, the modulus of impact is 0.235 that is bigger than specification 0.19. the load bearing capacity is minimum DB-40 that is so big value. In the result, continuos IPC Girder Bridge is safe in short period. we will evaluate long period behavior of continuos IPC Girder Bridge.

  • PDF

The Examination of Application in Curved Bridge used IPC Girder (곡선교에서의 IPC 거더교 적용성 검토)

  • 한만엽;곽창현
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.11a
    • /
    • pp.847-852
    • /
    • 2001
  • This study is to applicate IPC girder at curved bridge. This study introduces the variable(radius, $d_{ci}$, $d_{co}$, etc..) used in design IPC curved bridge. And this presents the possible radius in simple bridge and continuous bridge. For example, simple bridge that have span length is 30m, minimum possible radius is 300m. In continuous bridge, girders are arranged by sloped in $\theta$. So in this case, the bridge is under consideration that horizontality pressure in bridge pier.

  • PDF

Study of Bridge Design of The Length-Depth Ratio is 34 (경간/형고비 34를 실현한 IPC 거더교의 연구)

  • 한만엽;곽창현
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.05a
    • /
    • pp.839-844
    • /
    • 2001
  • The length-depth ratio of the preflex and PSC girder is very important variable. But PSC girder is very difficult to reduce the depth. If the bridge that girder depth is most important variable, then generally the great part of engineers are use the preflex girder that more expensive method then PSC girder. This paper introduce the design example that replace the preflex girder with the IPC girder The bridge span is 44m, and depth is 1.15m. The depth is restrained in 1.15m by several conditions. And it is compare preflex with IPC girder in semi condition. These two girders are very different in economy and execution. So, this paper present more economic and easy construction method.

  • PDF

LCA-based Environmental Impact Analysis for Prestressed Concrete Girders (프리스트레스 콘크리트 거더의 LCA기반 환경영향 분석)

  • Choi, Gyeong-Chan;Kim, Do-Hoon;Park, Jin-Young;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.1
    • /
    • pp.69-76
    • /
    • 2020
  • Bridges which are components of road network consume large amounts of resources such as concrete and steel materials, which have large environmental impacts during construction. This causes a great environmental burden. In order to reduce the environmental impact caused by the construction of the bridge, the environmental impact should be reviewed based on reasonable data in the early design stage. The purpose of this study is to provide basic data for LCA-based environmental impact assessment in the process of selecting bridge type in the early design stage. For this purpose, design data for four types of PSC bridges (general PSC girder, IPC girder, e-Beam, DR girder) were collected and LCA was performed to analyze the basic unit value and impact factors of environmental load. The results of the analysis showed that the environmental impact of IPC girder was the smallest, and the environmental impact of e-Beam was 133.7% higher than that of IPC girder. In addition, concrete, reinforcement, PC strand, square timber, sheath pipe, and steel plate were derived as the main factors that generate 98.5% of the overall environmental impact of PSC girder.

Long-term Behavior of IPC Girder Bridge (IPC 거더 교량의 장기거동 해석)

  • 권승희;김진근;이상순;한만엽
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.05a
    • /
    • pp.107-112
    • /
    • 2001
  • The IPC(Incremental Prestressed Concrete) which is gradually introducing the tensile force by tendons has been recently developed for reducing the effective depth of PSC bridges. As well known, concrete experiences long-term deformation such as creep and drying shrinkage, and the prediction of the long-term behavior of concrete bridges is essential for both safety and serviceability aspects. This paper was analysed the long-term behavior of a continuous 2-span IPC girder bridge taking into consideration of creep, drying shrinkage and the time of tensile force introduction. As results, the shrinkage of slab concrete increases the negative moment at interior support, and the The difference of concrete ages between slab and girder increases the camber. The effect of initial tensile force is larger than the effect of secondary tensile force in the tendons.

  • PDF

Development of Long-Span Railway Bridges Design Using IPC Girder (IPC 거더를 이용한 장지간 철도교 설계에 관한 연구)

  • Jang, Won-Seok;Park, Jun-Myung;Park, Sun-Kyu
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.7 no.4
    • /
    • pp.149-158
    • /
    • 2003
  • It is customary that tendons and sectional dimensions are calibrated and tendon forces are applied at once at the initial stage to keep the subsequent stresses occuring at different loading stages within the allowable stresse in prestressed concrete (PSC) bridge design. However, this traditional tensioning method usually results in a too conservative sectional depth in view of ultimate capacity of a girder. A new design method which can realize the reduction of sectional depth of PSC girder is theoretically suggested in this study. Tendons are tensioned twice at different loading stages: the initial stage and the stage after fresh slab concrete is cast. It can be shown that according to this technique, sectional depth can be significantly reduced and larger span can be realized compared to traditional ones. In this paper, there is an example about the design of bridge by means of new PSC design theory, having a longer span than a existing railway bridge. Also, a new method by continuous tendon profiles is presented to be continuous a IPC bridge.

The Effect of Design Parameter on the Beam Depth of IPC Girder Continuous Bridge (교량설계 변수가 IPC 거더 연속교의 형고에 미치는 영향)

  • 한만엽;김보형;김상완
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.05a
    • /
    • pp.125-130
    • /
    • 2001
  • A existing design method of PSC girder bridges, according to total service loads, stress required tendon force at a time. Because this design method increases beam depth, design of long span is difficult. However, As UC girder stressing at difficult loading stages reduces sectional depth of PSC girder, both design and operation of long span bridges is possible. so, this study analyzes the effect of design parameter (Girder Strength, Girder Spacing, Span Length, Joint Strength) on the beam depth of IPC girder continuous bridges, and shows sectional depth of UC girder for design of long span bridges. According to analysis, when a continuous bridges of same length span is at strength of joint over strength of girder of 600kg/$cm^{2}$, a change of beam depth is observed and when a continuous bridges of different span length is at strength of joint below strength of girder of 600kg/$cm^{2}$, a change of beam depth is observed. In two case, a change of beam depth is mostly observed over strength of girder of 350kg/$cm^{2}$ according to analysis of deflection data, a continuous bridges of IPC girder is nearly satisfied.

  • PDF

A Numerical Analysis of Tolerable Settlement for Bridges (수치해석에 의한 중소형교량 교량기초의 허용침하량 평가)

  • Jung, Gyung-Ja;Jeon, Kyung-Soo;Cho, Jun-Sang;Lee, Sang-Heon;Byun, Hyung-Kyoon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.569-579
    • /
    • 2010
  • Tolerable vertical displacement of a bridge is dependent on the superstructure-type, slope, span, and etc.. In the design stage, however, resultant force of cross section is examined supposed that the settlement is 1 cm at the bearing point. And the 1cm is sometimes considered as if the criteria of allowable foundation settlement. It is needed to establish the criteria of the tolerable displacement for the small and middle bridges which are widely used in domestic area. The design data of domestic bridges including expressway bridges were collected and analyzed according to the types of superstructures and foundations. And numerical simulations were conducted for RC rigid frame bridges, PSC girder bridges, IPC girder bridges, PSC box girder bridges, and steel box girder bridges to examine the tolerable displacements.

  • PDF

Anlysis of the Environmental Load Impact Factors for IPC Girder Bridge Using Principal Component Anlysis (주성분 분석을 활용한 IPC 거더교의 환경부하량 영향요인 분석)

  • Kim, Joon-Soo;Jeon, Jin-Gu;Kim, Byung-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.6
    • /
    • pp.46-54
    • /
    • 2018
  • In the 21st century, the Earth has continued its efforts to reduce carbon emissions to overcome the crisis caused by climate change. The construction industry, which is a representative industry that produces large amounts of the environmental load during construction, should actively reduce the amount of the environmental load. From the planning stage of the construction facility, it is necessary to consider the environmental load such as route selection and structure type selection to reduce the environmental load. However, the environmental load can be estimated based on the input resource amount. However, in the planning stage, it is difficult to accurately calculate the environmental load due to lack of information on the construction amount. The purpose of this study is to select the environmental load factors for IPC girder bridges to be used in the environmental load estimation model in the planning stage. Specific information related to the environmental load was selected from a list of information available in the planning stage, reflecting the Life Cycle Assessment(LCA), correlation, principal components analysis and expert opinion. The list of selected planning stage information is 10 such as span length and bridge extension, and it is expected to be used as a basic data for the future development of environmental load estimation model.