• Title/Summary/Keyword: IMF Management System

Search Result 49, Processing Time 0.026 seconds

The Distribution Intensity for the Casual Wear Before and After IMF Management System (IMF사태 전후 캐주얼 의류 유통 집약도)

  • 정현주
    • Journal of the Korean Society of Clothing and Textiles
    • /
    • v.24 no.7
    • /
    • pp.1056-1064
    • /
    • 2000
  • The aim of this paper was to look at distribution intensity of casual wear brand before and after IMF Management System. It also provides the guide to distribution design and reinforces the strategy of the brand of it. Since the firm especially in casual wear industry recently has had difficulty in how to decide and to select the distribution numbers in the domestic market. Based on the data in‘98 Korea Fashion Guide’and ‘Korean Fashion Brand Annual’, 78 brands had been analyzed with percentage, multiple regression. The results were as follows: In general, the lower the price of the product is and the higher the total sale is, the more intensive the distribution of the casual wear brand is before and after IMF Management System. The longer the launching period is, the more intensive the distribution of the casual wear industry is after IMF Management System. Besides, there is difference between the brand origins in the distribution intensity. In addition, two brand types were classified and tested. The distribution intensity of jean casual wear and uni-sex casual wear have related to the price after IMF and the total sale before and after IMF Management System while there is no relationship with the launching period before and after IMF Management System. The distribution intensity of the domestic brand have related to the price, and the total sale, while the foreign brand has a relationship with the total sale before and after IMF Management System. The foreign brand has related only to launching period after IMF Management System.

  • PDF

Classifying Strategic Types Through Strategic Group Analysis In Construction Industry (국내 건설부문 전략군 분석을 통한 전략군집분류 -국내 중규모 건설기업을 중심으로-)

  • Jeong Dae-Ryung;Yoo Byeong-Gi;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.2 s.24
    • /
    • pp.102-110
    • /
    • 2005
  • After the IMF bailout, the Environment of Domestic Construction Industry had changed dramatically. Before the IMF, Domestic Construction Firms are secured by the government regulations and some traditional practices. However, due to the following reasons: a decrease in public works, an increase in uncertainty of market prediction, the change of bid system, and increase in construction firms, recently the competition among construction firms has became keen. Under the serious competition, in order that medium-size construction firms survive in the construction market, it is need to establish the strategy that could increase productivity. In order to establish the strategy, firstly, construction firms should set up an appraisal standard of construction firms. Consequently, This study will introduce companies' objective appraisal in domestic construction market as well as basal data for setting-up strategy through adaptation industry structure analysis of business administration for strategic group analysis and a company which has lagged behind competitive power among the competitive companies can choose a target strategic group which should be pursued it in the future through being classified according to a group taken analogical strategy.

A Study on the Establishment of Process Safety Management (PSM) System for Small and Medium Size Chemical Plants (중소화학공장의 공정안전관리(PSM)시스템 구축에 관한 연구)

  • Baek Jong-Bae;Ko Jae-Wook
    • Journal of the Korean Institute of Gas
    • /
    • v.3 no.1
    • /
    • pp.8-13
    • /
    • 1999
  • The article 49-2 of Industrial Safety Law requires that all the owners of industrial plants which contains dangerous facilities perform the process safety management. That is, this law requires the owners of industrial plants to take necessary measures to prevent fire, harmful gas leaking, explosion, and other serious accidents that could cause demage and injuries to the employees. So far, domestic chemical plants have tried to invest money and time in safety management. But, such efforts have been made only in chemical plants that were subsidiaries of large business groups. Moreover, since the economic crisis of Korea which is symbolized by the IMF bailout, small and medium size companies could not afford to invest in safety management. Their major concern is to increase productivity and thereby, survive in this crisis. The goal of this research is to develop the process safety management system that can help small and medium size companies to positively secure the process safety management. So, in developing the process safety management system, the financial and practical difficulties of such companies are fully taken into consideration.

  • PDF

A Model of the Construction Risk Management System for Site Personnel in the Construction Project (건설현장 실무자를 위한 건설공사 위험관리시스템 모델)

  • Kim, Seon-Gyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.90-98
    • /
    • 2007
  • Although the construction industry has been rapidly increased at its size and technologies as a locomotive of the economy development in Korea, most construction companies have not paid their attention on the construction risks seriously. However, they have been experienced a lot of business deterioration and project instability during the IMF crisis and WTO entry, and trying to figure out a way to manage the construction intrinsic risks systematically. Some top ranked construction companies have already developed and been implementing a risk management system for the oversea construction projects applying for the marketing and bidding stage, but not for the domestic construction projects during construction phase yet. This paper proposes a construction risk management system model for the site personnel to understand and manipulate very easily in the construction project.

Suggestion of Project Information Management System for Small & Medium Sized Construction Companies through Analysis of Information Management Structure (프로젝트 정보관리체계 분석을 통한 중소건설업체 프로젝트 정보관리시스템 모델 제안)

  • Lee Tai-Sik;Koo Ja-Kyung;Lee Sang-Yub;Kim Young-Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.549-552
    • /
    • 2003
  • Small & medium-sized construction companies(SMCC), they has lot's of problem like poor finance, a lack of specialists, and a shortage of professional skill. So the basic condition of SMCC is not good for small construction companies. In this situation, moreover SMCC has been influenced by big-sired construction companies(BCC) difficult after the crisis of economics of Korea, IMF. Therefore it is necessary that we strengthen competitive power of SMCC for survival. This research is about project management for SMCC. We analized information system which is developed from SI corporation and BCC. As this research, we want to build and organize project information management system for SMCC. This will make SMCC have more competitiveness and increase productivity efficiency, skill for information management of project given.

  • PDF

Influence Factor Analysis for Feasibility Study of Building Projects (상업건축물의 사업타당성 영향요인 분석)

  • Son, Ki-Young;Kook, Dong-Hoon;Kim, Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.462-466
    • /
    • 2006
  • The startingpoint of successful buildingproduction process is the feasibility study of the project. If the feasibility study is poor which is affected in direct production processes such as designing and engineering, it incurs a great unrecoverable loss to the company. The governmentinstitutionalized the feasibility study for projects that budgets over 50billion won in an effort to ensure competitiveness of the construction industry after IMF; however, the system and effort to created systematic studies or guidance preparation for private construction development projects are lacking in great deal. Therefore, the objective of this study is to establish the analysis factors of feasibility study and evaluation standard by systematic analysis in consideration of the changes of various variables and mutual relationships using system dynamics technique for office buildings among commercial buildings.

  • PDF

A MODEL OF RISK MANAGEMENT PLAN AND SYSTEM FOR THE CONSTRUCTION PHASE

  • Seon-Gyoo Kim;Chan-Jeong Park ;Moon-Serk Yang;Jin-Bong Kim ;Hyung-John Shin
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.341-346
    • /
    • 2005
  • After the IMF shock, some major construction companies in Korea have been motivated to avoid and mitigate various risk factors which could be critical and catastrophic events to corporate revenue and organization internally or externally. It means that they are trying to introduce and set up a risk management plan and system suitable to their organization and culture. L construction co. ltd. is one of major construction companies that have been searching methodologies or technologies to manage various risk factors surrounding corporate marketing and project operation. This paper presents an unique approach to develop a model of risk management plan and system suitable to L construction itself focused on the construction phase.

  • PDF

Design of Integration Process for JIT System in Construction Schedule Management (건설 공정관리에서의 적시생산을 위한 통합 프로세스 설계)

  • Jin You-Na;Lee Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.517-520
    • /
    • 2003
  • Recently there is a used a word-outsourcing-in the corporation circumstance. Continuous recession impelling with IMF permitted restructuring measures downsizing unnecessary organization and offered opportunity to breakup structure of 'High cost and Low efficiency' -inefficient and uneconomic production method- in our corporation. Due to the effect of such circumstance change, the construction industry have already introduced and implemented outsourcing in many parts. For successful outsourcing in the construction industry, a mutually close relations and the cooperation are preceded and JIT system is needed to improve these relations. The study recognizes the importance and proportion that outsourcing is occupyed in the construction industry, and suggests the method to improve the productivity by evaluating the factors and usefulness for JIT system to apply to the construction industry.

  • PDF

Design of Integration Process for JIT System in Construction Schedule Management (건설 공정관리에서의 적시생산을 위한 통합 프로세스 설계)

  • Jin You-Na;Lee Sang-Beom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.5 s.21
    • /
    • pp.117-125
    • /
    • 2004
  • Recently, the word 'outsourcing' is used frequently in the corporation circumstance. Continuous recession with IMF caused restructuring measures which made unnecessary organization be downsized, and offered opportunity to breakup structure of $^{\circ}A$EHigh cost and Low efficiency, which is inefficient and uneconomic production method' in our corporation. Due to the effect of such circumstance change, the construction industry have already introduced and implemented outsourcing in many parts. For successful outsourcing in the construction industry, close relation and mutual cooperation should be preceded and JIT system is needed to improve the relation. In this study, the importance and proportion in which outsourcing is occupied in the construction industry are recognized, and the method for improving the productivity is suggested through evaluating the factors and usefulness of JIT system which can be applied to the construction industry.