Retrofit Scheme against Crack Growth of ILM Bridge Superstructure in accordance with Each Construction Stage (시공단계별 ILM 교량상부의 균열성장에 대한 보강방안)

  • 이창수;김승익;김현겸
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.10b
    • /
    • pp.1001-1006
    • /
    • 2000
  • These should be constructed partially, because many prestressed concrete box girder bridges in situ have large cross section and long span. Therefore, accurate prediction of differences, both elapse time of each construction stage and exposure of atmosphere at each position of cross section, is very important. Though it is importance, engineers are apt to overlook it. This study predicted cracks due to shrinkage and stress concentration phenomenon by each construction stage and then, ascertained reduction of tensile stresses after applying retrofit scheme.

Development of an Activity-Based Conceptual Cost Estimating Model for P.S.CBox Girder Bridge (대표공종 기반의 P.S.C 박스 거더교 개략공사비 산정모델 개발 -상부공사 중심으로-)

  • Cho, Ji-Hoon;Kim, Sang-Bum
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.197-201
    • /
    • 2008
  • Conceptual cost estimates for domestic highway projects have generally been conducted using governmental unit-price references. Inaccuracies in governmental unit-price data has repeatedly addressed in the Korean construction industry which often lead to poor decision making and cost management practices. Thus, needs for developing a better way of conceptual cost estimating has been widely recognized. This research is considered as the first step in developing such model using real-world cost data based on actual construction activities. The data analyzed in this paper includes 41 P.S.C (Prestressed Concrete) Box bridges which broke into 4 categories based on construction methods such as I.L.M(Incremental Launching Method), M.S.S(Movable Scaffolding System), F.S.M(Full Staging Method), and F.C.M(Free Cantilever Method). Actual design documents; including actual cost estimating documents, drawings and specifications were carefully reviewed to effectively break down cost structures for PSC girder bridges. Among more than 40 cost categories for each P.S.C girder bridge type, 7 of them were identified which accounted for more than 95% of total construction cost (ILM: 99.47%, MSS: 99.22%, FSM: 98.18%, and FCM: 98.12%). In order to validate the clustering of cost categories, the variation of each cost category has been investigated which resulted in between -1.16 % and 0.59%.

  • PDF

A Study of Local Buckling of Steel Bridge Girders subtended to Possible Load Conditions during Construction by Incremental Launching Method (ILM 시공시 발생할 수 있는 하중조합에 대한 강교량 주형의 국부좌굴 연구)

  • 염응준;강민철;황민오;강영종
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2004.10a
    • /
    • pp.203-209
    • /
    • 2004
  • Recently, various and new special methods of construction about steel bridges have been tried, and the study about local buckling under this methods have been performed too. But because of various cases, structural analysis is performed to check safety for each step of construction, and this is not efficient and economical method for time and manpower. So, for solution of this problems, general method about checking safety needs to he developed. In this study, local buckiling of web of girder due to various load cases under construction by ILM(Incremental Launching Method) will be studio considering various parameters such as forces, aspect ratio, boundary condition and so on. Also interaction curve will he plotted for each case.

  • PDF

Development of the Approximate Cost Estimating Model Using Statistical Inference for PSC Box Girder Bridge Constructed by the Incremental Launching Method (통계적 기법을 활용한 ILM압출공법 교량 상부공사 개략공사비 산정모델 개발 연구)

  • Kim, Sang-Bum;Cho, Ji-Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.781-790
    • /
    • 2013
  • This research focuses on development of the conceptual cost estimation models for I.L.M box girder bridge. The current conceptual cost estimation for public construction projects is dependent on governmental average unit price references which has been regarded as inaccurate and unreliable by many experts. Therefore, there have been strong demands for developing a better way of conceptual cost estimating methods. This research has proposed three different conceptual cost estimating method for a P.S.C. girder bridge built with the I.L.M method. Model (I) attempts to seek the proper breakdown of standard works that are accountable for more than 95 percentage in total cost and calculates the amount of standard work's materials from the standard section and volume of I.L.M box girder bridge. Model (II) utilizes a correlation analysis (coefficient over 0.6 or more) between breakdown of standard works and input data that would be considered available information in preliminary design phase. Model(III) obtains conceptual estimating through multiple-regression analysis between the breakdown of standard works and all of input data related to them. In order to validate the clustering of coverage in the preliminary design phase, the variation of I.L.M cost coverage from multiple-regression analysis[model(III)] has been investigated which result in between -3.76% and 11.79%, comparing with AACE(Association for the Advancement of Cost Engineering) which informs its variation between -5% and +15% in the design phase. The model proposed from this research are envisioned to be improved to a great distinct if reliable cost date for P.S.C. girder bridges can be continually collected with reasonable accuracies.

Estimation of Friction Coefficients Based on Field Data (실측값에 근거한 마찰계수의 추정)

  • Jeon, Se Jin;Park, Jong Chil;Park, In Kyo;Shim, Byul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.5A
    • /
    • pp.487-494
    • /
    • 2009
  • Friction coefficients of the prestressing tendon are the basic information required to control the prestressing force introduced to PSC structure during jacking. However, the friction coefficients show considerable differences depending on the specifications, causing much confusion to designers. In this study, the ranges of the friction coefficients presented in domestic and foreign specifications are compared together to clarify the differences. Then, a procedure is proposed that can be used to estimate the wobble and curvature friction coefficients from field data such as elongation and prestressing force and from theory related to the friction. The procedure is applied to various tendon profiles of several PSC bridges constructed by ILM, FCM and MSS. The resulting values are compared with those presented in some specifications and assumed in jacking and a reasonable range of the friction coefficient is discussed. Lift-off tests are also performed in some bridges to further verify the results. The resulting wobble friction coefficients are not as small as those presented in AASHTO specifications but range from the lower limit to mid point of domestic specifications, while the curvature friction coefficients approach or slightly exceed the upper limit.

Stress Distribution on Construction Joint of Prestressed Concrete bridge Members with Tendon Couplers (텐던커플러를 사용한 프리스트레스트 콘크리트 교량부재의 이음부 응력분포 특성)

  • 오병환;채성태;김병석;이만섭
    • Journal of the Korea Concrete Institute
    • /
    • v.13 no.1
    • /
    • pp.1-8
    • /
    • 2001
  • Recently, prestressed concrete(PSC) bridge structures with many repetitive spans have been widely constructed using the segmental construction method in many countries. In these segmentally constructed PSC bridges, there exist many construction joints which is required coupling of tendons or overlapping of tendons to introduce continuous prestress through several spans of bridges. The purpose of this paper is to investigate in detail the complicated stress distributions around the tendon coupled joints in prestressed concrete girders. To this end, a comprehensive experimental program has been set up and a series of specimens have been tested to identify the effects of tendon coupling. The present study indicates that the longitudinal and transverse stress distributions of PSC girders with tendon couplers are quite different from those of PSC girders without tendon couplers. It is seen that the longitudinal compressive stresses introduced by prestressing are greatly reduced around coupled joints according to tendon coupling ratios. The large reduction of compressive stresses around the coupled joints may cause deleterious cracking problems in PSC girder bridges due to tensile stresses arising from live loads, shrinkage and temperature effects. The analysis results by finite element method correlate very well with test results observed complex strain distributions of tendon coupled members. It is expected that the results of this paper will provide a good basis for realistic design guideline around tendon coupled joints in PSC girder bridges.

The study of determination proper nose properties, used for I..L.M constructing economic long spans bridge. (경제성과 장대경간 구성을 구현할 수 있는 I.L.M교량에 사용되는 추진코의 적정제원 산정에 관한 연구)

  • 박상현;이승주;김찬녕;심재수;황의승
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.11a
    • /
    • pp.853-858
    • /
    • 2001
  • The PSC bridge being built by ILM may have greater bending moment during its construction rather than after completion. When it occurs, Engineer should suggest to reduce stress-resultants than to make bigger cross-section with considering stability ,economics, and proper span-to-depth ratio. The used method is to install extruded nose at the end of girder. It substitutes the weighted segment for the light. From the reference, the stiffness of extruded nose, is 1/10 of the main girder, and the length is 60 to 70% of the length of the span, with little justification. In this study, the proper length and stiffness of the nose element is determined by the parametric study and idealizing procedure. The results about the extruded nose through the mixing of the parameter of its stiffness and length, the proper length of extruded nose is 80% of the longest span and the proper stiffenss is 13% of the bending stiffness of the superstructure and the proper length of extruded nose is 70% of the longest span and the proper stiffness is 9.5% of the bending stiffness of the superstructure.

  • PDF

Design and Safety Control in Construction Stage of Prestressed Concrete Box Girder Bridge with Corrugated Steel Web (파형강판 PSC 박스거더 교량의 설계 및 시공중 안전관리)

  • Kim, Kwang-Soo
    • Journal of the Korean Society of Safety
    • /
    • v.23 no.2
    • /
    • pp.87-97
    • /
    • 2008
  • The Ilsun Bridge is the world's longest box girder bridge(801m) with corrugated steel webs and has the widest width($21.2{\sim}30.9m$: tri-cellular cross section) among these kinds of composite girder bridges. It has fourteen spans(50m, 10 at 60m, 50m, 2 at 50.5m) where twelve spans are erected by the incremental launching method and two spans by full staging method. Special topics related to the structural safety of prestressed concrete box girder bridge with corrugated steel web in construction stage and service were reviewed. Investigations focus on the span-to-depth ratio, shear stress of corrugated steel webs and optimization of tile length of steel launching nose. The span-to-depth ratio of Ilsun bridge has been found to be well-planned while the corrugated steel web has been designed highly conservative and it has been observed that the conventional nose-deck interaction equation do not fit well with corrugated steel web bridges. As a result, detailed construction stage analysis was performed to check the stress levels and the safety of preceding design conditions. Finally, from the design review of Ilsun bridge, this study suggests optimal design issues which should be of interest in designing a prestressed concrete box girder bridge with corrugated steel webs.

A Study on Application of GPS for Deflection Management of Curved PCT Girder Bridge under Construction (시공 중 곡선형 PCT 거더교의 처짐 관리를 위한 GPS 적용 연구)

  • Kyu Dal, Lee;Jin Duk, Lee
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.33 no.5
    • /
    • pp.453-461
    • /
    • 2015
  • In order to manage the deflection of a curved PCT girder bridge during construction, a GPS receiver was installed at the spot predicted to be the weak point during the incremental launching so as to measure the deflection at each construction stage. The deflections obtained in the experiment were compared with those derived from the monitoring of stress, temperature and inclination. The comparative analysis of the GPS measurement and analytical values obtained from finite element modeling with respect to the launching distance showed that the measured values differ by 0.6 to 1.6 times to the analytical results. This difference could be significantly reduced by thermal calibration. From the analysis of the behavioral pattern of the bridge, deflection occurred during construction in the concrete tip due to the deflection at the head of the nose at the 95m and 75m-spots, and compression and tension developed respectively at the compression weak zone and tension weak zone. The application of GPS appeared to enable more efficient management of the deflection during the erection of the curved PCT girder bridge and is expected to be helpful for the prediction and management of the behavior in future ILM construction sites.