Korea Electric Power Research Institute has carried out verification of communication conformance on IEC 61850 based IEDs related to power IT project "Development of Prototype for Advanced Substation Automation System based on the Digital Control Technology". Owing to IEC 61850 international standard and digital substation automation system, IED testing process should be changed from the conventional way to the new way described in the paper. This paper describes IED testing procedures based on substation automation system using UML.
Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
/
2008.10a
/
pp.371-374
/
2008
KEPRI has carried out IEC61850 communication conformance test about the IED trial products. This paper describes dataset conformance testing, one of the IEC 61850-10 conformance test items, and test procedures on IED. KEPRI plans to construct the testing field of IEC 61850 based substation automation system with domestic IEDs confirmed their IEC 61850 communication service including dataset.
In order to verify a digital substation based on IEC 61850, KEPRI in charge of POWER IT project related to SAS has constructed IED conformance testing system, which consists of HMI, IED (Intelligent Electronic Device), network equipment, V/I generator, and performed the interoperability test between two IEDs made by other vendors. The test was proceeded based on SCL and with system integrated tools
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.24
no.6
/
pp.169-176
/
2010
Substation Automation System is basically operating throughout communicative services among IEC 61850 based devices. So, minimum requirement in order to install the system in the substation is to verify server and client conformance of IEDs and HMIs according to the IEC 61850 standard. Even though UCA IUG issued IEC 61850 conformance test procedures for both the server and the client, Much of the test is limited to IEDs as server and there is no client-only testing tool except KEMA server test tool sets. this study aims to develop IEC 61850 client testing system for verifying the full communication conformance of the substation automation system and this paper describes the design and implementation of the testing system.
Seo, Jin-Seok;Kim, Tae-Hyeong;Mishra, Anurag;Kim, Gyeong-Nam;Yeom, Geun-Yeong
Proceedings of the Korean Vacuum Society Conference
/
2013.02a
/
pp.577-577
/
2013
플라즈마를 이용하는 공정은 반도체 산업에서 박막트랜지스터, 평면 모니터와 LCD 등 다양한 반도체 및 디스플레이 소자를 제작하는데 중요한 기술 중 하나로 발전되어 왔다. 현재 플라즈마 공정 기술을 이용하여 소자의 크기를 수십 나노 이하로 공정함으로써 수율을 향상시킬 수 있었지만, 소자의 미세화는 그 한계점에 봉착하였다. 그러한 이유로 웨이퍼 사이즈의 크기를 대구경화 시킴으로써 이런 문제점을 극복하고자 하였지만, 대구경 웨이퍼 사이즈에 맞는 차세대 대면적 공정 장비와 그에 따른 플라즈마 소스의 개발과 이를 컨트롤 할 수 있는 능력이 매우 절실하게 되었다. 본 연구에서는 대구경 웨이퍼용 플라즈마 소스를 위해 상대적으로 낮은 압력과 고밀도 플라즈마를 발생시킬 수 있는 유도 결합형 플라즈마원을 사용하였다. 하지만 유도 결합형 플라즈마 소스의 경우 대구경화에 따른 안테나의 길이가 길어짐으로써 생기는 정상파 효과를 피할 수가 없게 되었다. 그러한 이유로, 본 연구에서는 정상파 효과를 줄일 수 있는 상대적으로 낮은 주파수를 사용하는 안테나의 형태를 이용하여 실질적인 공정 영역에 있어서의 균일도 문제를 해결하였다. 또한, 플라즈마의 특성조절을 위해 이중주파수를 사용함 으로써 플라즈마 특성 조절을 하였다. 이러한 형태의 이중주파수를 사용하는 플라즈마 소스를 이용하여 10 mTorr의 Ar/CF4 조건에서 양이온 종들을 PSM (Plasma Sampling Mass spectroscopy, HIDEN Inc.)을 통해 에너지를 분석하였다. 이중 주파수에 있어 전력비율에 따라 IEDs (Ion Energy Distributions)는 많은 변화가 관찰되었으며, 인가하는 입력전력에 따라 E-H mode 전이가 일어남을 관찰할 수 있었다.
Kim, Seok-Kon;An, Yong-Ho;Jang, Byung-Tae;Choi, Jong-Kee;Lee, Nam-Ho;Han, Jung-Yeol;Lee, You-Jin
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.29
no.8
/
pp.18-22
/
2015
Digitalization of the substation in Korea has been in progress so far with focusing on Station Bus. However, its application to Process Bus has been delayed due to some technical issues. IEDs based on Process Bus use the data values of SV and GOOSE. As the size of communication data on Process Bus is comparatively bigger than that of Station Bus, it is very important for the evaluating the performance of Process Bus to analyze the transferring speed and quality of data from the first equipment, which is located on process level, to station level. According to the results of related studies, it is said that the most important factor for the design and operation of Process Bus network is the communication delay with consideration of the volume of packets. In the paper, the results of performance test for the network with and without application of VLAN on Process Bus system that uses integrated IEDs are presented. Additionally, the paper proposes the optimal method to analyze the communication delays of network systems through evaluating the maximum delay time, link process ratio and the amount of lost packets by using a simulation tool.
The Transactions of The Korean Institute of Electrical Engineers
/
v.57
no.1
/
pp.14-19
/
2008
In order to verify a substation automation system based on IEC 61850, Korea Electric Power Research Institute under the project related to SAS has constructed IED testing system, which consists of HMI, IED(Intelligent Electronic Device), network equipment, V/I generator, and performed a various of communication tests such as the interoperability test between two IEDs made by other vendors. The test was proceeded based on SCL(Substation Configuration Description Language). This paper presents ways and procedures to simulate those tests and solutions to clear up SCL based engineering problems and compatibility among the individual manufacture tools.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.62
no.3
/
pp.151-158
/
2013
Large generator of power plant is very important. In order to protect large generator from faults, digital protective relay or IED is required. However, all protective relays for generators of the domestic power plant are operated by foreign products. And now, for technological independence from foreign and improvement of import substitution effect, IEDs using domestic technology are being developed. To evaluate performance of developing next-generation power devices, the study of the dynamic characteristics of the power plant, generator system modeling, fault simulation and analysis, should be considered. Specially, To obtain IEEE Standards COMTRADE format for relay operation test, generator system modeling and fault simulation using PSCAD/EMTDC tools must be preceded. Until now, a complete modeling of generator internal windings and fault simulation techniques dose not exist. In this paper, for evaluation performance of relay elements of developing IED, the generator system modeling and various faults simulation using PSCAD/EMTDC tools were performed. And then, the various transient phenomena through obtained relaying signal of developed modeling were analyzed.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.62
no.3
/
pp.133-138
/
2013
A large generator is an important role in transferring an electric power to power system. The IEDs of large generator often use microprocessor technology to obtain a digital relay system with a wide range of measuring, protection, control, monitoring, and communication functions. However, all generator protection and control systems in Korea imported from abroad and are being operated. In order to reduce the large expense and improve the reliable operation, development of generator protection and control system by domestic technology is required. This paper deals with the design of the IED of generator protection panel for development of generator protection and control system. The major emphasis of the paper will be on the description of hardware and signal processing test results and measurement accuracy of the prototype IED. By developing of generator IED based on DSP and microprocessor, replacement of the generator protection panel imports are expected to be effective.
In this paper, DSPOCS(Digital Switchgear Panel Operation and Control Solution) is designed, which is the intelligent inference operation and control solution of substation based on IED. DSPOCS is designed as a scheduled monitoring and control task and a real-time alarm inference task, and is interlinked with BRES in the required case. The intelligent alarm inference task consists of the alarm knowledge generation part and the real-time pattern matching part The alarm knowledge generation part generates automatically alarm knowledge from DB and saves it in alarm KB. On the other hand, the pattern matching part inferences the real-time event by comparing the real-time event information furnished from IEDs of substation with the patterns of the saved alarm knowledge base.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.