• Title/Summary/Keyword: ICEC

Search Result 8, Processing Time 0.024 seconds

An Analysis of Perceptions of Road Construction Engineers on ICEC Framework at the time of System Transition from Responsibility Supervision to Construction Management (III) - Main Focus of Application for CM & ICEC - (책임감리가 건설사업관리(CM)로 전환시 도입된 역량지수(ICEC)에 대한 도로건설기술자들의 인식 분석(III) - CM과 역량지수 적용을 중심으로 -)

  • Park, Hyo-Sung;Kim, Nak-Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.2
    • /
    • pp.269-276
    • /
    • 2016
  • Recently the organizations related construction express frequently their opinion to MOLIT at the time of introducing the ICEC grade system and converting a system from responsibility supervision (RS) to construction management (CM). However there was no data to investigate the recognition of road construction engineers about the policy change. In this study, a questionnaire survey was conducted and analyzed twice to the road construction engineers on the CM and ICEC grading system at the Korea Institute of Construction Technology Education. The trend of response from the road construction engineers was verified through the survey separately from other institutions. This study analyzed the results and introduced a desirable policy proposal to promote an international competitiveness of the engineering industry.

Improved Model for Index of Construction Engineer's Competency Evaluation System in Domestic Construction Management (국내 건설사업관리 기술인력 역량평가 개선모델(I2CEC))

  • Kang, Seongmi;Cha, Minsu;Lee, Woojae;Ji, Woojong;Cho, Hunhee;Yoo, Wisung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.47-58
    • /
    • 2020
  • The ICEC (Index of Construction Engineer's Competency) quantifies the competence of construction engineers using such parameters as experience, education, and qualifications and assigns four technical grades (expert, advanced, intermediate, and beginners) to construction engineers according to their scores for the efficient management and loading of technical personnel. However, as of 2020, the seventh year since its implementation, ICEC has shown many problems in its application, unlike its intended purpose. So institutional supplementation is required to provide improvement measures that can cope with the changing labor market environment and complement the current ICEC. Therefore, this study examined the current status of the career management system after the introduction of the ICEC, suggested a career index proportional to the competence of construction engineers from the beginner to the expert level, and developed an effective capability evaluation model I2CEC. The improved model presented in this study provides a means to comprehensively judge the performance, experience, and the professional work abilities of construction management engineers. Furthermore, the results of this study are expected to contribute to the development of efficient manpower and career management systems for enhancing the competitiveness of the domestic construction industry.

An Analysis of Perceptions by Road Construction Engineers on ICEC Framework at the Time of System Transition, from Responsibility Supervision to Construction Management(I) - Main Focus on ICEC Framework - (책임감리가 건설사업관리(CM)로 전환시 도입된 역량지수(ICEC)에 대한 도로건설기술자들의 인식 분석(I) - 역량지수 등급 체계를 중심으로 -)

  • Park, Hyo-Sung;Kim, Nak-Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.5
    • /
    • pp.1147-1156
    • /
    • 2015
  • The result of responsibility supervision system which has been enforced for the last twenty (20) years since January, 1994 is evaluated, and keeps an eye out the process of unification and absorption of the system into the construction management (CM). As a baseline data for this study, the grade framework of construction engineer's ICEC introduced with CM is summarized. In this manuscript, the questionaire survey for CM and ICEC was conducted toward the target group of road field construction engineers and analyzed the outcome of the respondents' answers. 50% of the respondents have answered positively for the question about converting responsibility supervision to CM. 48% of the respondents from construction works field have answered positively for converting responsibility supervision system to CM while 38% of the respondents from engineers of supervision field have answered positively, less positive than the answers from works field engineers. 46% of overall respondents have answered, however, to maintain the present system of 40%, 40% and 20% on the survey to the question asking the opinion on the ways of calculating ICEC to use the rates : 40% of career, 40% of qualification and 20% of academic achievements. However, it appeared that engineers who have comparative advantages with academic achievements and career, and engineers with lower grade qualification demanded higher rate for career.

An Analysis of Perceptions by Road Construction Engineers on ICEC Framework at the time of System Transition, from Responsibility Supervision to Construction Management (II) - Focused on CM Terminology & ICEC Coordination - (책임감리가 건설사업관리(CM)로 전환시 도입된 역량지수(ICEC)에 대한 도로건설기술자들의 인식 분석(II) - CM 용어와 ICEC 조정을 중심으로 -)

  • Park, Hyo-Sung;Kim, Nak-Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.6
    • /
    • pp.1357-1366
    • /
    • 2015
  • This study (II) aims to draw up the future-oriented construction policy recommendations based on the outcomes as a result of a broad research and conducting questionnaire surveys on the arguable issues raised by construction engineers for roads and bridges in the course of previous study (I) implementation. As for the question of "The term 'Construction Management (CM)' which currently is defined in two (2) ways", 45% of respondents have answered that two (2) different types of CM should be unified into one (1) CM type as is the case in most advanced countries. About the question of "The ways to educate the CM professionals", many respondents have preferred to acquire CM professional certificate after receiving education for a certain period of time from private CM training institutions. As for the question of The revised draft that the ICEC grade of special engineers for design, construction and quality control areas shall be "more than 78 points from a more than 75 points by the original draft." 52% of respondents preferred to maintain the original draft. About the question of "The reason why the CM system has not been working well yet." 62% of respondents have answered that the staff members who are in charge of handling public project procurements are concerned about the fact that their roles (or activities) might be deprived as a result of CM adoption. In order for the CM system to be activated, based on the notion that the construction projects must be out soured, the reshuffle of the headquarter organization of Ministry of Land, Infrastructure and Transportation (MLIT) should be preceded.

An Extraction and ANP Importance Analysis for Competence Factors of Junior Grade CM Engineer (초급 건설사업관리기술자(CMr)의 요구역량 추출 및 ANP 중요도 분석)

  • Yang, Jinkook;Kim, Sebeom;Lee, Sangbeom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.1
    • /
    • pp.58-64
    • /
    • 2017
  • Construction Management (CM) is being utilized as an efficient project management system. Construction management system provide scientific management techniques as well as the expert's service with the expertise. Accordingly, CM services demand is continuously increasing in construction project. Construction Management engineer grade is distinguished by the Index of Construction Engineer's Competency (ICEC). Construction management engineer requires a higher score than the other fields. However, junior grade CM engineer can get grade according to the education and qualification. This study was conducted junior grade CM engineer depth interview after analyzing the problem of the current CM engineer grade system. As a result, this study was to extracted the 23 kind competence factors. And, competence factors were five area grouped using affinity diagram method. Next, we analyzed the importance utilizing the Analytic Network Process (ANP) technique. As a result, high priority areas were analyzed to be quality and cost areas associated with project management.

A Study on the Career Management for Construction Engineers through the Professional FGI Results: Focused on the Index of Construction Engineer's Competency (전문가 FGI를 통한 건설기술자 경력관리 방안 연구: 건설기술자 역량지수를 중심으로)

  • Lim, Jieun;Park, Yongho
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.12
    • /
    • pp.432-443
    • /
    • 2018
  • This study aims to analyze the current career management system for construction engineers and propose the developed future plan for the career management system. Especially, this study explores the Index of Construction Engineer's Competency(ICEC) and issues for workplace competency development which is the foundation of the career management system for construction engineers and proposes the advanced strategies for operating the career management system. For the developing the future strategy of the current construction engineer's career management system, a focus group interview was conducted in this study. Total 12 experts participated in the FGI. The study results identify the six key issues for advanced construction engineers' career management system. Those six issues include 1)preparing in the inducement of new human resources, 2)institutional modification of the current job/expertise fields, 3)attaching importance of practical experience in the workplace, 4)consideration of various factors of individual career, and 5)developing the highest level's workplace competency. Based on these research findings, theoretical and practical implication and suggestion for future studies were provided.

법령과고시 (2) - 건설기술진흥법 시행령 및 시행규칙, 건설기술자 등급 및 경력인정 등에 관한 기준

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.288
    • /
    • pp.83-85
    • /
    • 2014
  • 건설기술진흥법령 시행령 및 시행규칙과 건설기술자 등급 및 경력인정 등에 관한 기준이 지난 5월 23일부터 본격 시행에 들어갔다. 국토교통부(장관 서승환)는 "건설기술관리법"이 "건설기술진흥법"으로 전부 개정된 이후 그동안 추진해왔던 하위법령(시행령 및 시행규칙)의 개정 작업을 마무리했으며, 건설기술자 역량지수(ICEC)의 구체적인 내용을 담고 있는 "건설기술자의 등급 및 경력인정 등에 관한 기준"도 함께 개정 공포했다.

  • PDF

A Harmful Site Judgement Technique based on Text (문자 기반 유해사이트 판별 기법)

  • Jung, Kyu-Cheol;Lee, Jin-Kwan;Lee, Taehun;Park, Kihong
    • The Journal of Korean Association of Computer Education
    • /
    • v.7 no.5
    • /
    • pp.83-91
    • /
    • 2004
  • Through this research, it was possible to set up classification system between 'Harmful information site' and 'General site' that badly effect to teenagers emotional health. To intercept those entire harmful information sites, it using contents basis isolating. Instead of using existing methods, it picks most frequent using composed key words and adds all those harmful words' harmfulness degree point by using 'ICEC(Information Communication Ethics Committee)' suggested harmful word classification. To testify harmful information blocking system, to classify the harmful information site, set standard harmfulness degree point as 3.5 by the result of a fore study, after that pick up a hundred of each 'Harmful information site' and 'General site' randomly to classify them through new classification system. By this classification could found this new classification system classified 78% of 'Harmful Site' to "Harmful information site' and 96% of 'General Site' to 'General site'. As a result, successfully confirm validity of this new classification system.

  • PDF