• 제목/요약/키워드: Hydro-Generator

검색결과 155건 처리시간 0.108초

풍력발전기의 확률론적 발전비용 절감기여도 평가 (Probabilistic Production Cost Credit Evaluation of Wind Turbine Generators)

  • 박정제;오량;최재석;차준민
    • 전기학회논문지
    • /
    • 제57권12호
    • /
    • pp.2153-2160
    • /
    • 2008
  • This paper develops an algorithm for probabilistic production cost credit evaluation of wind turbine generators(WTG) with multi-state. Renewable energy resources such as wind, wave, solar, micro hydro, tidal and biomass etc. are becoming importance stage by stage because of considering effect of the environment. Wind energy is one of the most successful sources of renewable energy for the production of electrical energy. Case study demonstrates that the wind speed credit in view point of economics can be assessed by using the proposed methodology.

가변속 양수발전 시스템 모델링 (Modeling of Variable-Speed Pumped Storage Hydro)

  • 유진건;안현성;송우석;차한주
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2018년도 전력전자학술대회
    • /
    • pp.350-351
    • /
    • 2018
  • 본 논문은 가변속 양수발전 시스템의 모델링 및 양수발전용 전력변환장치 제어 구조를 분석하고 모델링하였다. 기존 양수발전 시스템은 동기 발전기를 사용하였지만 신재생 에너지원의 출력 변동 및 부하 변동에 따른 주파수의 변화에 빠른 대응을 위한 가변속 양수발전 시스템을 채용하여 계통 전력과 전압, 주파수 등을 보상한다. 양수 발전소의 터빈, 게이트, 조속기 등을 분석하여 모델링하였으며, Doubly fed induction generator를 위한 back-to-back 전력 변환 장치를 발전 및 양수 모드에 사용하기 위해 벡터제어, 속도제어, 유효-무효 전력 제어기 등을 모델링 하였다.

  • PDF

회전자 고정자권선의 절연보수후 절연특성변화 연구 (Change of the Insulation Characteristic for the Rotating machine stator winding after insulation reinforcement)

  • 오봉근;최교남;최형철;임기조
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 전기설비
    • /
    • pp.51-52
    • /
    • 2006
  • Our company(KOWACO) has periodically performed off-line diagnostic test for 14 hydro generators (rated 11 kV over) for 15 years. In this paper, we summarized results of dissipation factor tip-up test and partial discharge test about these generators. Among these, we chose two generators and performed insulation reinforcement (cleaning and varnish painting). We compared change of insulation condition for the stator winding based upon off-line diagnostic test result before and after repair. Test result shows that insulation condition was improved after insulation reinforcement. This insulation reinforcement has a function to reduce cause of deterioration, so we can know that it extends lifetime of generator and it is a very important factor for stable operation of facilities.

  • PDF

기후변화에 따른 우리나라 수문 기상학적 예측의 불확실성 (Uncertainty of Hydro-meteorological Predictions Due to Climate Change in the Republic of Korea)

  • 은코모제피 템바;정상옥
    • 한국수자원학회논문집
    • /
    • 제47권3호
    • /
    • pp.257-267
    • /
    • 2014
  • 기후변화에 따른 기온과 강수량의 변화가 지표수자원에 미치는 영향은 수문기상학 연구에서 매우 중요하다. 본 연구에서는 기후변화가 우리나라 5대강 유역의 유출량에 미치는 영향을 분석하기 위하여 Catchment Modeling Toolkit의 네가지 수문기상 모형을 사용하였다. 세 가지 RCP 시나리오에 대하여 12개 GCM 모형으로부터 미래 2021에서 2040까지(2030s), 2051에서 2070까지 (2060s) 및 2081에서 2099까지(2090s) 기간에 대한 기후자료를 추출하였다. 이들 자료는 LARS-WG 방법으로 상세화 하였으며, 수문기상 모형들은 1999부터 2009까지의 관측 자료를 이용하여 보정 및 검정하였다. 본 연구에서 미래의 유출량은 사분위 범위, 전체범위 및 변동계수 값이 시공간적으로 및 수문기상 모형에 따라서 큰 불확실성을 나타내었다. 종합적으로 볼 때 미래의 유출량은 기준년도에 비하여 RCP2.6, RCP4.5 및 RCP8.5 시나리오에 대하여 10~24%, 7~30% 및 11~30% 증가할 것으로 예상되었다. 본 연구는 수분기상모형과 기후변화 예측의 불확실성을 고려한 미래의 유출량을 모의할 수 있는 방법을 제시하였다.

2 MW 영구자석 직접 구동형 부유식 스파 부이 풍력 발전기의 피칭 운동해석 (Pitching Motion Analysis of Floating Spar-buoy Wind Turbine of 2MW Direct-drive PMSG)

  • 신평호;경남호;최정철;고희상
    • 한국태양에너지학회 논문집
    • /
    • 제37권1호
    • /
    • pp.1-14
    • /
    • 2017
  • A series of coupled time domain simulations considering stochastic waves and wind based on five 1-h time-domain analyses are performed in normal operating conditions. Power performance and tower base Fore-Aft bending moment and pitching motion response of the floating spar-buoy wind turbine with 2 MW direct-drive PMSG have been analyzed by using HAWC2 that account for aero-hydro-servo-elastic time domain simulations. When the floating spar-buoy wind turbine is tilted in the wind direction, maximum of platform pitching motion is close to $4^{\circ}$. Statistical characteristics of tower base Fore-Aft bending moment of floating spar-buoy wind turbine are compared to that of land-based wind turbine. Maximum of tower base Fore-Aft bending moment of floating spar-buoy wind turbine and land-based wind is 94,448 kNm, 40,560 kNm respectively. This results is due to changes in blade pitch angle resulting from relative motion between wave and movement of the floating spar-buoy wind turbine.

3D Casing-Distributor Analysis for Hydraulic Design Application

  • Devals, Christophe;Zhang, Ying;Dompierre, Julien;Vu, Thi C.;Mangani, Luca;Guibault, Francois
    • International Journal of Fluid Machinery and Systems
    • /
    • 제8권3호
    • /
    • pp.142-154
    • /
    • 2015
  • Nowadays, computational fluid dynamics is commonly used by design engineers to evaluate and compare losses in hydraulic components as it is less expensive and less time consuming than model tests. For that purpose, an automatic tool for casing and distributor analysis will be presented in this paper. An in-house mesh generator and a Reynolds Averaged Navier-Stokes equation solver using the standard $k-{\omega}$ shear stress transport (SST) turbulence model will be used to perform all computations. Two solvers based on the C++ OpenFOAM library will be used and compared to a commercial solver. The performance of the new fully coupled block solver developed by the University of Lucerne and Andritz will be compared to the standard 1.6ext segregated simpleFoam solver and to a commercial solver. In this study, relative comparisons of different geometries of casing and distributor will be performed. The present study is thus aimed at validating the block solver and the tool chain and providing design engineers with a faster and more reliable analysis tool that can be integrated into their design process.

양수발전기의 신 효용성 평가 지수 개발 (Development of New Effectiveness Assessment Indices of Pumped Storage Power Plant)

  • 이성훈;최재석;차준민;김남명
    • 전기학회논문지
    • /
    • 제63권7호
    • /
    • pp.867-874
    • /
    • 2014
  • The pumped storage power plants have excellent load following characteristics. It can also be committed quickly for synchronous reserve when it is in the generating mode because it can readily increase its generating power and, consequently, increases the overall system reliability. There are strong incentives for standing the system reliability. Additionally, $CO_2$ emission can be typically impacted due to operation of pumped generators. The increase or decrease of $CO_2$ depends on the generation mix. This paper proposes evaluation of reliability, economy and environment of power system considering pumped generator. This paper describes three case studies of the reliability and economy and environment according to capacity factor and storage capacity of pumped generators. The probabilistic production simulation model is used in this paper. The practicality and effectiveness of the proposed approach are demonstrated by simulation studies for a real size power system model on the $5^{th}$ power plan in Korea.

원자력발전소 비상전력계통 강화 방안에 따른 리스크 영향 평가 (A Risk Impact Assessment According to the Reliability Improvement of the Emergency Power Supply System of a Nuclear Power Plant)

  • 전호준
    • 한국안전학회지
    • /
    • 제27권5호
    • /
    • pp.224-228
    • /
    • 2012
  • According to the results of Probabilistic Safety Assessment(PSA) for a Nuclear Power Plant(NPP), an Emergency Power Supply(EPS) system has been considered as one of the most important safety system. Especially, the interests in the reliability of the EPS system have been increased after the severe accidents of Fukushima Daiichi. Firstly, we performed the risk assessment and the importance analysis of the EPS system based on the PSA models of the reference plant, which is the Korean standard NPP type. Considering a portable Diesel Generator(DG) system as the reliability reinforcement of the EPS system, we modified the PSA models and performed the risk impact assessment and the importance analysis. Although the reliability of the potable DG could be about 20% of the reliability of the alternative AC DG, we identified that Core Damage Frequency(CDF) was decreased by at least 4.6%. In addition, the risk impacts due to the unavailability of the EPS system on CDF were decreased.

세라믹 커플러를 이용한 고전압회전기 고정자권선의 On-line 및 off-line 부분방전 특성 시험 및 분석 (Analysis and lest of On-line and off-line PD Testing for High Voltage Rotating Machines Stator Windings using Ceramic Coupler)

  • 오봉근;김현일;강성화;임기조
    • 한국전기전자재료학회논문지
    • /
    • 제20권10호
    • /
    • pp.895-900
    • /
    • 2007
  • Partial discharge(PD) test can be performed either when the rotating machine is not operating(off-line) or during normal machine operation(on-line). This paper presents an on-line and off-line PD test on a large hydro-generator and induction motor using the same PD acquisition system(PDAS) and ceramic coupler(CC) sensor. PD signal characteristics of CC sensor proved similar with that of epoxy mica coupler(EMC) sensor as a results of PD test for simulated defect winding and frequency response test. A comparison of on-line and off-line PD test for PD characteristic parameters-phase resolved PD(PRPD), maximum PD value(Qmax) and PD occurrence energy(POE)-indicated that on-line PD test could reliably and effectively diagnose insulation conditions which were verified by off-line PD test.

주파수추종 운전 적용을 위한 BESS의 운용 방법 및 효과 (Operation of Battery Energy Storage System for Governor Free and its Effect)

  • 조성민;장병훈;윤용범;전웅재;김철우
    • 전기학회논문지
    • /
    • 제64권1호
    • /
    • pp.16-22
    • /
    • 2015
  • As the development of Battery Energy Storage System(BESS) and the increasing of intermittent energy sources like wind power and photovoltaic, the application of BESS in load frequency control is considered as an effective method. To evaluate the effectiveness of BESS application in frequency control, we defined a governor free model of BESS to conduct dynamic simulation. Using the BESS dynamic model, we implemented the power system dynamic model including steam, gas and hydro turbine generators. In this paper we study the control performance of BESS in primary frequency control. The effect of BESS speed regulation rate and response time on governor free operation is investigated. In addition, we compared BESS from steam turbine generator in view point of frequency regulation.