• 제목/요약/키워드: Hydro turbine generator

검색결과 45건 처리시간 0.026초

Battery Energy Storage Based Voltage and Frequency Controller for Isolated Pico Hydro Systems

  • Singh, Bhim;Rajagopal, V.
    • Journal of Power Electronics
    • /
    • 제9권6호
    • /
    • pp.874-883
    • /
    • 2009
  • This paper deals with an integrated voltage and frequency (VF) controller for isolated asynchronous generators (IAG) driven by a constant power pico-hydro uncontrolled turbine feeding three-phase four-wire loads. The proposed VF controller is used to control the frequency and voltage of an IAG with load leveling. Such a VF controller is also known as an integrated electronic load controller (IELC) which is realized using an isolated star/polygon transformer with a voltage source converter (VSC) and a battery at its DC bus. The proposed generating system with a VFC is modeled and simulated in MATLAB along with Simulink and Simpower system (SPS) toolboxes. The simulated results are presented to demonstrate the performance of an isolated asynchronous generator feeding three-phase four-wire loads with neutral current compensation.

잉여 유출수를 이용한 소수력발전용 수차의 유동특성 해석 및 시험 (Flow characteristics analysis and test in the Pelton turbine for pico hydro power using surplus water)

  • 정선용;이계복
    • 한국산학기술학회논문지
    • /
    • 제17권4호
    • /
    • pp.325-331
    • /
    • 2016
  • 대형 빌딩에 설치된 냉각탑의 순환수를 이용한 소수력 발전용 수차를 개발하기 위해 펠톤 수차설계를 상용코드인 CFX를 사용한 전산유체 해석을 통해 수행하였다. 소수력 발전용 펠톤 수차의 최적설계를 구하기 위해 파이프 단면에 적합한 형태로 펠톤 휠을 절단한 버킷 모양과 버킷 개수 등 관련 주요 설계 인자를 변화시키며 수차 특성을 해석하여 수차 성능에 대한 영향을 평가하였다. 전산수치 해석에 의한 펠톤 수차설계 방법을 검증하기 위해 축소된 크기의 수차를 제작하고 실험을 통한 벤치마크 시험을 수행하였다. 초음파유량계와 압력 트랜스듀서, 오실로스코프를 사용하여 측정한 유동특성과 출력을 수치해석 결과와 비교하여 수치해석 설계방법의 타당성을 증명하였다. 또한 전산수치 해석을 통해 원하는 출력을 얻기 위한 버킷의 모양과 개수를 선정하여 냉각탑이 설치된 대형빌딩에서 건물 내의 냉각수 순환평균속도는 1.2 m/s이고 빌딩의 높이는 30 m인 경우에 대해 순환하는 냉각수인 잉여수를 이용한 kW급 소수력 발전용 펠톤 수차의 개발 가능성을 확인하였다.

국내 소수력발전 기술개발 현황과 전망 (Overview and Trend of Small Hydropower Development in Korea)

  • 이경배;이은웅
    • 유체기계공업학회:학술대회논문집
    • /
    • 유체기계공업학회 2005년도 연구개발 발표회 논문집
    • /
    • pp.735-741
    • /
    • 2005
  • We have studied the prearranged plan and the economy of a candidate site for the development of small hydro power. And also we have confirmed its economy by suggesting the technology of the unmanned operation and the selection of the water turbine generator which has a great efficiency, working rate and suitability to the topographical characteristics of various development sites, for example, irrigation reservoirs, water works pipes, sewage systems and cooling water of a steam power station. We proposed some opinions such as the better improvement of small hydropower industry the people' view, cooperation among industry/university/ research institutes, remote control/maintenance and goverment's legislature and supporting system etc.

  • PDF

부유식 풍력발전 시스템 동역학 해석 프로그램 개발 연구 (A Study on a Dynamics Simulation Program Development for Floating Wind Turbines)

  • 임채환;송진섭;정태영;문석준;고진용;이성균;배대성;배동희
    • 풍력에너지저널
    • /
    • 제2권2호
    • /
    • pp.30-37
    • /
    • 2011
  • A floating wind turbine dynamic simulation program, WindHydro, is newly developed taking into account wind inflow and incident wave. WindHydro consists of 5 modules, HDFloat for hydrodynamics, HDProp for hydrodynamic property calculation, HDMoor for mooring dynamics, AeroDyn for aerodynamics, DAFUL for multi-body dynamics with nonlinear elasticity, and interface program that connects each calculation module. A turbulent wind and regular wave load case is simulated for the 5-MW OC3-Hywind with a spar bouy platform and catenary mooring lines. The results are compared with the results of the FAST(developed by NREL). As a result, the overall system responses from WindHydro and FAST agree well although some differences in the generator responses are observed.

삼천포 해양소수력 성능평가 (Performance Evaluation of the Samcheonpo Small-Hydro Power Plant)

  • 조홍연;조범준;강금석
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2007년도 춘계학술대회
    • /
    • pp.617-620
    • /
    • 2007
  • The performance evaluation of the Samcheonpo small-hydropower plant constructed on the October 25th,2006, was carried out focused on the turbine and generator efficiency analysis by using the measurement data. The unreasonable and unrealistic efficiency results are occurred in some periods because of the data variability, uncertainty, and measurement errors and mistakes. Whereas, the big mismatch is the tidal elevation predicted in the design processes. The difference between the measured and estimated tidal elevation is obvious during the low water period. It should be considered and checked in depth on the efficiency analysis of the planned and constructing small-hydro power plants in other coastal areas.

  • PDF

2 MW 영구자석 직접 구동형 부유식 스파 부이 풍력 발전기의 피칭 운동해석 (Pitching Motion Analysis of Floating Spar-buoy Wind Turbine of 2MW Direct-drive PMSG)

  • 신평호;경남호;최정철;고희상
    • 한국태양에너지학회 논문집
    • /
    • 제37권1호
    • /
    • pp.1-14
    • /
    • 2017
  • A series of coupled time domain simulations considering stochastic waves and wind based on five 1-h time-domain analyses are performed in normal operating conditions. Power performance and tower base Fore-Aft bending moment and pitching motion response of the floating spar-buoy wind turbine with 2 MW direct-drive PMSG have been analyzed by using HAWC2 that account for aero-hydro-servo-elastic time domain simulations. When the floating spar-buoy wind turbine is tilted in the wind direction, maximum of platform pitching motion is close to $4^{\circ}$. Statistical characteristics of tower base Fore-Aft bending moment of floating spar-buoy wind turbine are compared to that of land-based wind turbine. Maximum of tower base Fore-Aft bending moment of floating spar-buoy wind turbine and land-based wind is 94,448 kNm, 40,560 kNm respectively. This results is due to changes in blade pitch angle resulting from relative motion between wave and movement of the floating spar-buoy wind turbine.

풍력발전기의 확률론적 발전비용 절감기여도 평가 (Probabilistic Production Cost Credit Evaluation of Wind Turbine Generators)

  • 박정제;오량;최재석;차준민
    • 전기학회논문지
    • /
    • 제57권12호
    • /
    • pp.2153-2160
    • /
    • 2008
  • This paper develops an algorithm for probabilistic production cost credit evaluation of wind turbine generators(WTG) with multi-state. Renewable energy resources such as wind, wave, solar, micro hydro, tidal and biomass etc. are becoming importance stage by stage because of considering effect of the environment. Wind energy is one of the most successful sources of renewable energy for the production of electrical energy. Case study demonstrates that the wind speed credit in view point of economics can be assessed by using the proposed methodology.

자동동기검출회로 성능진단에 관한 연구 (A Study of In-Depth Diagnosis Method for Automatic Synchronizing Circuits)

  • 박호철;천영식;장기준;정찬수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1999년도 추계학술대회 논문집 학회본부 B
    • /
    • pp.582-584
    • /
    • 1999
  • Generator has synchronized with power Network after build-up output voltage. In order to prevent a current surge when synchronizing, the conditions such as identical no-load voltages identical no-load frequencies and identical phase positions must be met between generator voltage and network voltage. Hydro-Pump generators or Gas-turbine generators, Co-generation Generators that serve peak load of network are synchronized many times. So, Automatic Synchronizing Circuits are very important service. This report apply Diagnosis methods the Automatic Synchronizing Circuits(Device) by developing simulator.

  • PDF

주파수추종 운전 적용을 위한 BESS의 운용 방법 및 효과 (Operation of Battery Energy Storage System for Governor Free and its Effect)

  • 조성민;장병훈;윤용범;전웅재;김철우
    • 전기학회논문지
    • /
    • 제64권1호
    • /
    • pp.16-22
    • /
    • 2015
  • As the development of Battery Energy Storage System(BESS) and the increasing of intermittent energy sources like wind power and photovoltaic, the application of BESS in load frequency control is considered as an effective method. To evaluate the effectiveness of BESS application in frequency control, we defined a governor free model of BESS to conduct dynamic simulation. Using the BESS dynamic model, we implemented the power system dynamic model including steam, gas and hydro turbine generators. In this paper we study the control performance of BESS in primary frequency control. The effect of BESS speed regulation rate and response time on governor free operation is investigated. In addition, we compared BESS from steam turbine generator in view point of frequency regulation.

전력계통 안정화장치(PSS)의 성능 분석을 위한 실시간 디지털 시뮬레이터 응용 (The Application of Real Time Digital Simulator for Analyzing the Performance of Power System Stabilizer(PSS))

  • 허진;김동준;문영환;신정훈;김태균
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제49권9호
    • /
    • pp.459-466
    • /
    • 2000
  • The performance of a commercialized power system stabilizer (PWX-600) for a single hydro-turbine generator and infinite bus system has been investigated using Real Time Digital Simulator (RTDS) in this paper. The test system was composed of RTDS, three phase voltage/current amplifier and the PSS. The test scheme provided a very efficient way to verify the design and control performance of a PSS to be applied to real power system. The scheme can also be applied to verify in real time the performance of hardware and software of power system controllers for FACTS and protective relays effectively.

  • PDF