• Title/Summary/Keyword: Hydro generator

Search Result 155, Processing Time 0.032 seconds

Analysis of Insulation Characteristic for Small Hydro Generator (소수력발전기 절연특성분석)

  • Oh, Bong-Keun;Chang, Jeong-Ho;Lee, Kwang-Ho;Kang, Dong-Sik
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2008.05a
    • /
    • pp.142-145
    • /
    • 2008
  • Electrical insulation of small hydro generator stator winding is one of the most important parts in generator facilities. Some stator winding insulation problems can be identified through analysis of insulation diagnostic test. So, Diagnosis of stator winding insulation is an important measure of ensuring the safe operation and extending the remaining life of small hydro generator. This paper presents case studies of insulation failure in generator stator windings and the results of insulation diagnostic test for small hydro generator stator windings. Especially, Conducting the insulation diagnostic test before the generator installed in site is very important process to keep the good insulation condition in service.

  • PDF

Stand-Alone Pico-Hydro Generation System using a High-Efficiency IPM Synchronous Generator

  • Kurihara, Kazumi;Kubota, Tomotsugu
    • Journal of international Conference on Electrical Machines and Systems
    • /
    • v.3 no.2
    • /
    • pp.121-125
    • /
    • 2014
  • This paper presents a successful stand-alone pico-hydro generation system using a high-efficiency interior permanent-magnet (IPM) synchronous generator. A 1-kW 4-pole V-type IPM generator with low voltage regulation is used for laboratory test in stand-alone hydro energy conversion system. It has been found from experimental results that the constant output voltage is supplied stably by the proposed system under wide speed range.

On-line partial discharge measurement techniques of hydro-generator windings (수력 발전기 권선에서의 운전중 부분방전 측정기법)

  • 황동하;김진봉;김용주;박명수;김택수
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.45 no.2
    • /
    • pp.294-300
    • /
    • 1996
  • In hydro-generator, a groundwall insulation of stator windings gradually deteriorates due to mechanical, thermal, electrical and environmental stresses. These stresses combine to result in loose windings, delamination of the stator insulation and/or electrical tracking of the endwinding, all of which can lead to stator insulation failures. Conventionally, off-line tests such as partial discharge measurement, DC/AC current and .DELTA.tan.delta. tests has been used for estimation of winding condition. However, off-line test requires large power supply and generator outage. In addition, major cause of insulation problems such as loose wedges and slot dischages may not be found with off-line diagnoses. This paper introduces the on-line partial discharge measurement techniques using frequency spectrum analyzer(FSA) for the generator stator windings. The experimental results from the UIAM #1 hydro-generator confirms a optimistic application of on-line generator diagnosis method as a reliable tool for evaluation of winding condition.

  • PDF

Effect of Bidding Strategies of Hydro Generation on an Electricity Market (수력발전기의 경쟁적 입찰전략이 전력시장에 미치는 영향)

  • Lee Kwang-Ho
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.54 no.9
    • /
    • pp.461-466
    • /
    • 2005
  • This paper addresses the bidding strategies of a hydro generator in an electricity market, and their effect on the electricity market in accordance with some parameters: the water volume, the demand elasticity, and the hydro unit performance. The competition of a hydro generator is formulated as a hi-level optimization problem, and the solving scheme for the equilibrium condition is proposed as a set of nonlinear simultaneous equations. The equilibrium of the oligopolistic model is evaluated by comparison with that of a perfect competition model from the viewpoint of a market power. Simulation results show some parameters have an influence on the market power of an electricity market including a hydro generator.

Reliability Improvement of Insulation Diagnosis Using the Hydro-Generator On-Line Partial Discharge Monitoring System (수력발전기 On-line 부분방전 측정 시스템을 이용한 절연상태 진단의 신뢰성 향상)

  • Ok, Yeon-Ho;Lee, Eun-Woong;Lim, Jae-Il;Park, Ji-Kun;Kwak, Won-Ku;Lee, Jae-Heung;Shin, Jae-Pil;Shin, Byoung-Chol
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.58 no.4
    • /
    • pp.469-475
    • /
    • 2009
  • Accident dangerousness of domestic hydro power generators which are operated in Korea is on the increase because of use at the long term. On this, the Off-line diagnosis techniques developed to the On-line by continued domestic technical development since 2000. Especially, On-line insulation diagnosis of domestic hydro power generator is possible by localization of partial electric discharge sensor and On-line insulation diagnosis system. This paper shows the diagnosis result that is applied localized Ceramic Coupler and PDMS-HG(Partial Discharge Monitoring System for Hydro Generator) at four Chung-ju hydro Generator used for 25 years. Particularly, the confidence of insulation diagnosis is improved by using high frequency filter and sampling the partial discharge signals which occur in site. For reviewing the confidence of On-Line insulation diagnosis system, we measured the outside noises and partial discharge signals during practical operation by using the partial discharge diagnosis system of the Full A/D process. And we reviewed the confidence of the On-Line insulation diagnosis system by comparing and analyzing these data.

Predictive Maintenance System using Condition Monitoring System of Hydro-turbine Generator (수차발전기 상태진단시스템을 이용한 예지보전체계)

  • Kim, Eung-Tae;Ko, Sung-Ho;Kim, Hyun;Jeong, Yong-Chae;Choi, Seong-Pil
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2007.05a
    • /
    • pp.453-456
    • /
    • 2007
  • The purpose of this study is to explain the importance of Vibration Monitoring Device by introducing an example of Predictive Maintenance System using Condition Monitoring System of Hydro-turbine generator. Confirming vibration of generation equipment is commissioning procedure during equipment completion for checking guaranteed items. Data from Generator output range are used to determine output band to continue the performance of equipment. The Vibration Monitoring System is not absolute method of maintenance, but if it is used well with expert, it will be visible, data-analyzed, scientific maintenance more than others. And also, Condition Monitoring System is very important for remote controlled small hydro-power plant although most of it is installed in Large hydro-power plant.

  • PDF

Predictive Maintenance System using Condition Monitoring System of Hydro-turbine Generator (수차발전기 상태진단시스템을 이용한 예지보전체계)

  • Kim, Eung-Tae;Ko, Sung-Ho;Kim, Hyun;Jeong, Yong-Chae;Choi, Seong-Pil
    • 유체기계공업학회:학술대회논문집
    • /
    • 2006.08a
    • /
    • pp.57-60
    • /
    • 2006
  • The purpose of this study is to explain the importance of Vibration Monitoring Device by introducing an example of Predictive Maintenance System using Condition Monitoring System of Hydro-turbine generator. Confirming vibration of generation equipment is commissioning procedure during equipment completion for checking guaranteed items. Data from Generator output range are used to determine output band to continue the performance of equipment. The Vibration Monitoring System is not absolute method of maintenance, but if it is used well with expert, it will be visible, data-analyzed, scientific maintenance more than others. And also, Condition Monitoring System is very important for remote controlled small hydro-power plant although most of it is installed in Large hydro-power plant.

  • PDF

Report on Predictive Maintenance System using Condition Monitoring System of Hydro-turbine Generator (수차발전기 상태진단시스템을 이용한 예지보전체계 사례)

  • Ko, Sung-Ho;Jeong, Yong-Chae;Choi, Seong-Pil;Kwack, Young-Kyun;Han, Seung-Yeul
    • The KSFM Journal of Fluid Machinery
    • /
    • v.13 no.1
    • /
    • pp.29-34
    • /
    • 2010
  • The purpose of this study is to explain the importance of Vibration Monitoring Device by introducing an example of Predictive Maintenance System using Condition Monitoring System of Hydro-turbine generator. Confirming vibration of generation equipment is commissioning procedure during equipment completion for checking guaranteed items. Data from Generator output range are used to determine output band to continue the performance of equipment. The Vibration Monitoring System is not absolute method of maintenance, but if it is used well with expert, it will be visible, data-analyzed, scientific maintenance more than others. And also, Condition Monitoring System is very important for remote controlled small hydro-power plant although most of it is installed in Large hydro-power plant.

Project Summary of Three Gorges' 840MVA Hydro-generator with Close-Loop-Self-Circulating Evaporative Cooling System

  • Yuan, Jiayi;Meng, Dawei;Gu, Guobiao;Song, Fuchuan;Zhang, Tianpeng
    • Journal of international Conference on Electrical Machines and Systems
    • /
    • v.3 no.1
    • /
    • pp.48-53
    • /
    • 2014
  • In December 2011 and July 2012, two sets of 840MVA hydro-generator of Three Gorges on Yangtze River with Close-loop-self-circulating evaporative cooling (CLSCEC) system were put into commercial operation. In this paper, we make engineering summary of these two generators with CLSCEC system. We also make a comparison between the internal water cooling (IWC) hydro-generator and the CLSCEC hydro-generator used in Three Gorges power plant in fields of their operating characteristics, working performances, technical features, working safety and reliability. In addition, engineering structures, type tests' results and systematic emulating calculation of CLSCEC schemes are analyzed.

Study on Leading-phase Operation Capability of a 770 MW Jumbo Hydro-generator based on Stability Analysis and End-Region Heat Analysis

  • Fan, Zhen-nan;Zhou, Zhi-ting;Li, Jian-fu;Wen, Kun;Wang, Jun;Sun, Zhang;Wang, Tao;Yao, Bing
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.3
    • /
    • pp.1317-1325
    • /
    • 2018
  • A generator-grid coupling calculation model is established to study the leading-phase operational capability of a 770 MW jumbo hydro-generator in a Chinese ultra-mega hydropower station. The static and dynamic stability of the generator are analyzed and calculated to obtain stability limits under leading-phase operating conditions. Three-dimensional (3D) time-varying nonlinear moving electromagnetic and temperature field models of the generator end-region are also established and used to determine the magnetic field, loss, and temperature of the end-region under the leading-phase operating condition. The simulation results agree with data measured from the actual 770 MW hydro-generator. This paper provides reliable reference data for the leading-phase operation of a jumbo hydro-generator, which will help to improve in the design and manufacture of future hydro-generators.