• Title/Summary/Keyword: Hydraulic loading system

Search Result 144, Processing Time 0.023 seconds

Estimation of Kinetic Coefficient and Assimilated Nutrients Mass in SBR Process (연속회분식 반응 공정에서 동역학적 계수 및 미생물합성에 사용된 영양물질 산정)

  • Ji, Dae-Hyun;Shin, Sang-Woo;Lee, Kwang-Ho;Lee, Jae-Kune
    • Journal of Korean Society on Water Environment
    • /
    • v.23 no.5
    • /
    • pp.607-612
    • /
    • 2007
  • In this study, we investigated the variations of the kinetic coefficients and Chemical Oxygen Demand (COD), N and P mass used for assimilation of a sequencing batch reactor (SBR) system with the variation of SRTs; SRTs of 7.5, 10.0, 12.5, 15.0 and 20.0 days were tested in one cycle of SBR operation to determine the optimum conditions for the operation of the SBR and estimate its COD, nitrogen and phosphorus removal efficiencies. The SBR system was operated under the conditions as follows: an operation time of 6 hours per cycle, a hydraulic retention time (HRT) of 12 hours, an influent COD loading of $0.4kg/m^3/day$, and an influent nitrogen loading of $0.068kgT-N/m^3/day$. The yield coefficient (Y) and decay rate coefficient ($k_d$) were estimated to be 0.4198 kgMLVSS/kgCOD and $0.0107day^{-1}$ by calculating the removal rate of substrate according to the variation of SRT. Considering total nitrogen amount removed by sludge waste process, eliminated by denitrification, and in clarified water effluent with reference to 150 mg/cycle of influent nitrogen amount, the percentage of nitrogen mass balance from the ratio of the nitrogen amount in effluent (N output) to that in influent (N input) for Runs 1~5 were 95.5, 97.0, 95.5, 99.5, and 95.5%, respectively, which is well accounted for, with mass balances close to 100%.

Effect of Heat Treatment of Fatigue Crack Growth of Plasma-Sprayed Coating Steels (플라즈마 용사코팅강재의 피로균열성장에 미치는 감화열처리의 영향)

  • Kim, G.S.;Hyun, C.H.;Kim, Y.S.
    • Journal of Power System Engineering
    • /
    • v.7 no.4
    • /
    • pp.55-60
    • /
    • 2003
  • This paper is to investigate the fatigue crack growth of plasma-sprayed coating steels according to heat treatments. The experimental materials are carbon steels(substrate: S45C) with plasma-sprayed coating layers of Ni-4.5%Al and $TiO_2$. The fatigue test is conducted on compact tension specimen by a servo-hydraulic fatigue testing machine. The specimens are heat-treated at $400^{\circ}C\;and\;800^{\circ}C$, respectively. Loading condition is a constant amplitude sinusoidal wave with a frequency of 10Hz and a load ratio of 0.1. The fatigue crack growth length is automatically measured by a compliance method. In the case of non-heat treated specimens, the fatigue crack growth rates of both substrate and coating specimen are almost same. The crack growth rates of substrates and coating steels by heat treatment are larger than those of the non-heat treated one, because the ductile property increase by heat treatment. In ${\Delta}K<18MPa{\cdot}m^{1/2}$, the crack growth rates of the heat-treated specimens are slightly taster than non-heat treated one. But the both heated and non-heated one are almost same in ${\Delta}K>18MPa{\cdot}m^{1/2}$.

  • PDF

Effects of Rotational Speed and Hydraulic Residence Time on the Ammonia Removal of a Rotating Biological Contactor (RBC) (회전속도와 수리학적 체류시간이 회전원판식(Rotating Biological Contactor;RBC) 여과조의 암모니아 제거에 미치는 영향)

  • 오승용;조재윤;김종만
    • Journal of Aquaculture
    • /
    • v.16 no.3
    • /
    • pp.142-150
    • /
    • 2003
  • Performance of a biological filter, the rotating biological contactor (RBC), is affected by rotational speed and hydraulic residence time (HRT). A RBC with a disc diameter of 62 cm, total surface area of 48.28 $m^2$, volume of 0.34 ㎥, and submergence ratio of 35.4% was tested for the combinations of five rotational speeds (1, 2, 3, 4 & 5 rpm) and three HRT (0.5, 1.0 & 2.0 hr) to find out the maximum removal efficiencies of total ammonia nitrogen (TAN) and nitrite nitrogen of a simulated recirculating aquaculture system. Ammonia loading rate in the system was 25 g of TAN/ ㎥. day. Removal efficiencies were checked when TAN concentrations in the system stabilized for 3 days in each treatment. The concentration of TAN in the system decreased with increasing rotational speed of the RBC up to 4 rpm in all HRT (P<0.05). At the rotational speed of 5 rpm, the efficiencies decreased in all HRT (P<0.05). When the rotational speeds were 1, 2, 3, 4, and 5 rpm, TAN concentrations in the system were 1.35, 0.94, 0.69, 0.66, and 0.76 mg/L at the 0.5 hr HRT, 2.86, 1.18, 0.96, 0.87, and 1.11 mg/L at the 1.0 hr HRT, and 5.30, 2.44, 1.99, 1.77, and 2.01 mg/L at the 2.0 hr HRT, respectively. The TAN removal efficiencies of the RBC at the rotational speeds of 1, 2, 3, 4, and 5 rpm were 32.9, 49.5, 65.1, 72.9, and 62.9% in 0.5 hr HRT,33.1, 74.1, 87.1, 95.8, and 78.5% in 1.0 hr HRT, and 35.5, 76.7, 89.6, 97.0, and 85.5% in 2.0 hr HRT, respectively. TAN removal efficiency of RBC per pass increased with increasing HRT. However, TAN concentration in the system also increased. The best operating condition among the treatments was obtained at the treatment of 0.5 hr HRT and 4 rpm (P<0.05). The TAN concentration was 0.66 mg/L. Concentrations of nitrite nitrogen (NO$_2$$^{[-10]}$ -N) in the system decreased with increasing rotational speed in all HRT while that in the system increased with increasing HRT in all rotational speeds. The ranges of NO$_2$$^{[-10]}$ -N concentrations at HRT of 0.5, 1.0, and 2.0 hr in the system were 0.26~0.32, 0.31~0.56, and 0.43~l.45 mg/L, respectively. The ranges of daily removal rates of TAN in this system were 20.03~23.0 g TAN/㎥ㆍday and those of nitrite nitrogen were 19.65~30.25 g NO$_2$$^{[-10]}$ -N/㎥ㆍday.

Kinematics and Structural Analysis for Optimization of an Electro-Hydraulic Sliding Deck Systems (전동 유압 슬라이딩 데크 시스템 최적화를 위한 기구학 및 구조해석)

  • Moon, Hyeok-Joo;Ryuh, Beom-Sahng;Oh, Young-Sup;Kim, Man-Jung;Lee, Jung-hun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.6
    • /
    • pp.21-28
    • /
    • 2017
  • Electro-hydraulic sliding deck systems have been developed to reduce the weight for the loading of an agricultural machine. The extension length of the sliding deck was calculated according to the bed's dump angle. The optimum thickness and material were determined using a large and heavy load at acceptable angles. In addition, the degrees of freedom were calculated to obtain the input/output relationship of the system. An equation was derived using a simplified model formula for the extended length of the sliding deck according to the bed's dump angle. Also, the advance length at the maximum and minimum angles of the system was determined using numerical analysis. A down-scaled model of the system was constructed and verified by experiments. The deck was simplified to determine the material and thickness of the sliding deck and for the selection of the two representative materials. The simplified model was tested in deformation tests and stress tests with different thicknesses and materials using a structure analysis program. The analysis results show that ATOS80 is the best among the two materials for reducing the weight of the system.

A Study on the Anaerobic Treatment of the Phenol-bearing Wastewater with two Sludge Blanket-Packed Bed Reactors in Series (2단의 슬러지-고정상 반응기에서 페놀 함유 폐수의 혐시성 처리에 관한 연구)

  • 정종식;안재동;박동일;신승훈;장인용
    • Journal of Environmental Health Sciences
    • /
    • v.21 no.4
    • /
    • pp.1-9
    • /
    • 1995
  • This study was carried to investigate the biodegradability of phenol in the wastewater with the two sludge blanket-packed bed reactor in series. Each reactor had a dimension of 0.09 m i.d. and 1.5 m height and consisted of two regions. The lower region was a sludge blanket of 0.5 m height and the upper region was a packed-bed of 1 m height. The packed bed region was charged with ceramic raschig rings of 10 mm i.d., 15 mm o.d. and 20 mm length. The reactors were operated at 35$\circ$C and the hydraulic retention time(HRT) was maintained 24 hours. The synthetic wastewater composed of glucose and phenol as major components was fed into the reactor in a continuous mode with incereasing phenol concentration. In addition, the nutrient trace metals($Na^+, Mg^{2+}, Ca^{2+}, PO_4^{3-}, NH_4^+, Co^{2+}, Fe^{2+}$ etc.) were added for growing anaerobes. The phenol concentration of the effluent, the overall gas production, the composition of product gas, the efficiency of COD reduction and the duration of acclimation period were measured to determine the performance of the anaerobic wastewater treatment system as the phenol concentration of the influent was increased from 600 to 2400 mg//l. Successfully stable biodegradation of phenol could be achieved with the anaerobic treatment system from 600 to 1, 800 mg/l of the influent phenol concentration. The upper level of influent phenol loading was high enough to meet most of the practical requirement. The duration of acclimation increased with the phenol loading. At steady state of the influent phenol concentration of 1800 mg/l, the treatment performance indicated the phenol reduction efficiency of 99%, the COD reduction efficiency of 99% and the gas production rate of 37 l/day. At the influent phenol concentration of 2400 mg/l, however, the operation of the treatment system was noted unstable. While the concentration of methane in biogas decreased with increasing the influent phenol loading, the carbon dioxide was increased. However, the concentration of hydrogen was varied negligibly. The concentration of methane was high enough to be used as a fuel. As a result, it is suggested that anaerobic phenol wastewater treament was economical in the sense of energy recovery and wastewater treatment.

  • PDF

Study on Natural Wastewater Treatment Systems by Constructed Wetland for Rural Area (인공습지에 의한 농촌오수처리에 관한 연구)

  • 윤춘경;권순국;김형중
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.39 no.4
    • /
    • pp.55-63
    • /
    • 1997
  • Constructed wetland system which can be applied to the rural wastewater treatment system was examined by pilot plant in Kon-Kuk University. Hydraulic loading rate of wastewater was about 0.16m$^3$/m$^2$. day and theoretical detention time in the system was 1.38 days. The effluent of the septic tank for the school building was applied as inflow to the system. The influent concentration of DO was zero but effluent was up to 4.37mg/${\ell}$ which implies that oxygen was supplied enough from atmosphere by reaeration to support biological activity of the system. Average influent concentration of BOD was 104mg/${\ell}$ and effluent was 24mg/${\ell}$ with average removal rate of 76%. Average influent concentration of COD was 215mg/${\ell}$ and effluent was 63mg/${\ell}$ with average removal rate of 70 % . Average influent concentration of SS was 78mg/${\ell}$ and effluent was 10mg/${\ell}$ with average removal rate of 87%. Two components, BOD and SS, are regulated by law to keep maximum water quality standard of 80mg/${\ell}$ when daily outflow rate is less than 100$m^3$/day which is the case of most rural communities. Therefore, the results from the experiment showed that constructed wetland system can meet the water quality standard easily. Average influent concentration of total nitrogen was 165mg/lwhich is relatively higher than normal wastewater, and effluent was about 156mg/${\ell}$ with average removal rate of only 6%. Average influent concentration of total phosphorus was 41 mg/${\ell}$ and effluent was 6mg/${\ell}$ with average removal rate of 87%. Overall, constructed wetland system was thought to be effective to treat wastewater if nitrogen removal mechanism is improved. Considering low cost, less maintenance, and high treatability, this system can be a practical alternative for the wastewater treatment in rural area The experiment was performed during the summer and fall season, and treatment efficiency of the system is expected to decrease in low temperature. therefore, further study including temperature is required to evaluate feasibility of the system more in detail.

  • PDF

A Study on the Evaluation of Two-Phase Anaerobic Process for Public Livestock Wastewater Treatment Plant (이상혐기공정의 축산폐수 공공처리시설 적용 가능성에 관한 실험적 연구)

  • Oh, Sung Mo;Kim, Moon Ho;Bae, Yoon Sun;Park, Chul Hwi
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.21 no.3
    • /
    • pp.331-339
    • /
    • 2007
  • The purpose of this study was to investigate the biodegradability and performance of organic removal and methane production rate when treating piggery wastewater using a pilot scale two-phase anaerobic system operated up to a volumetric rate of $10m^3/day$. The pilot scale two-phase anaerobic process is consisted of a continuous-flow stirred-tank reactor (CFSTR) for the acidification phase and an Upflow Anaerobic Sludge Blanket reactor (UASB) for the methanogenesis. The acidogenic reactor played key roles in reducing the periodically applied shock-loading and in the acidification of the influent organics. The acidogenic CFSTR was operated at organic loading rates (OLR) between 1.8 and $14.4kgCOD/m^3{\cdot}day$, and the UASB reactor was operated between 0.5 and $5.6kgCOD/m^3{\cdot}day$. A stable maximum biogas production rate was $81m^3/day$ and the methane conversion rate of the organic matter varied from 0.30 to $0.42L\;CH_4/g\;COD_{removed}$(0.40) at hydraulic retention time (HRT) above 3.5days. The methane contents ranged from 73 to 82% during the experimental period. It is known that most of the removed organic matter was converted to methane gas, and the produced biogas might be high quality for its subsequent use.

Treatment of Acid dye Using Microbial Immobilization (미생물 고정화를 이용한 산성염료의 처리)

  • 김정목;조무환;양용운
    • Textile Coloration and Finishing
    • /
    • v.11 no.2
    • /
    • pp.19-26
    • /
    • 1999
  • Strains degrading and decolorizing acid dyes, Nylosan red E-BL 150%. were isolated from natural system, was named as ARK3. The optimal culture conditions of temperature and pH were $35^\circ{C}$, 7.0, respectively. Growth rate of cells in conditions of aerobic shaking more than standing culture conspicuously increased, and optical density of those to strain ARK3 were found as 1.38 and 0.25 after 42 hrs. Decolorization efficiency in batch culture which used as immobilization media to natural zeolite was 15% after 6 hrs, while suspension culture was 5%, also its of immobilization and suspension culture were 90% and 85% after 48 hrs, respectively. Decolorization efficiency of air-lift bioreactor was more than 90% to a dilution rate of $0.038hr^{-1}$, but that was decreased as 70%, when the dilution rate was $0.05hr^{-1}$. Even though at maximum dilution rate of this study, there was not appeared "wash out" phenomienon of biomass. Decolorization efficiency was 97.7% at a dilution rate of $0.025hr^{-1}$, when influent dye concentration was $100mg/\ell$. But if influent dye concentration increased as $150mg/\ell$, even though MLVSS increased, that of treatment water decreased as 93%. Also, when influent dye concentration increased as $200mg/\ell$ and $300mg/\ell$, decolorization efficiencies of treatment water abruptly decreased as 85% and 63%, respectively. Decolorization efficiency was more than 92% to the limit volumetric loading rate of $3.75mg/\ell\cdot{hr}$hr, without regard to variation of influent dye concentration or hydraulic retention time. if volumetric loading rate was more than $3.80mg/\ell\cdot{hr}$, at same condition, decolorization efficiency was lower decrease of retention time than increase of influent dye concentration.entration.

  • PDF

Performance Enhancement of Anaerobic Treatment of Waste Sludge by Chemical Pretreatment (화학적 전처리를 통한 혐기성 슬러지 처리효율의 향상)

  • 허준무;박종안;손부순
    • Journal of environmental and Sanitary engineering
    • /
    • v.13 no.1
    • /
    • pp.16-25
    • /
    • 1998
  • Laboratory-scale experiment using anaerobic fluidized bed reactor was carried out to investigate the prehydrolysis step with caustic soda on the treatment efficiency of anaerobic sludge treatment, since the overall rate-limiting step for the complete anaerobic digestion of sludge was the hydrolysis step by extracellular bacterial enzymes of insoluble polymeric molecules. Reactors received a sludge which had not been pretreated, a 50-50 mixture of pretreated and untreated sludge, and the fully pretreated sludge. Hydraulic retention time of 10, 5, 2.5 days and 1 day were applied with an respective equivalent organic loading rate of 1.17, 2.23, 4.17, 11.24 gCOD/L/d. Reactor with the untreated sludge did not archieve adequate digestion even at the HRT of 5 days, and reactor, which received the 50-50 mixture, operated well at the HRT of 5 days, but began to show signs of unstable digestion at the HRT of 2.5 days. While, reactor, which was fed the hydrolyzed sludge, operated reasonably well at the 2.5 days, but was showing somewhat decrease in removal efficiencies. Results, therefore, have substantiated that the limiting reaction in the anaerobic treatment process is hydrolysis. The soluble COD did not significantly accumulate in the reactor as organic acid form, even when they were highly stressed. It was believed that this resistance to a build-up of organic acids and soluble COD behavior was mainly due to the maintenance of the methane bacteria in the fixed-film system which prevents washout as the organic loading increased. The anaerobic fluidized bed reactor was therefore effective for the digestion of waste activated sludge at short HRT.

  • PDF

Total Phosphorus Removal in Cattail Wetland Purifying Effluent from a Night Soil Treatment Plant during Its Initial Operation (분뇨처리장 방류수를 정화하는 부들습지의 초기운영 단계에서 총인의 제거)

  • Yang, Hongmo
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.8 no.1
    • /
    • pp.45-51
    • /
    • 2005
  • Total phosphorus(TP) removal was examined in a surface-flow wetland constructed in April 2003 during its initial operating stage from June to November 2003. Its dimensions were 87mL by 14mW. It was a part of a four-wetland-cell treatment system constructed near the Kohung Estuarine Lake located in the southern part of Korea. Effluent from a night soil treatment plant was discharged into the wetland and purified effluent from the wetland was discharged into Sinyang Stream flowing into the Lake. Cattails(Typha angustifolia ) from natural wetlands were cut at about 40 cm height and transplanted into the wetland. An average of 25.0$m^3$/day of effluent flowed from the plant into the wetland. Water depth was maintained about 0.2m and hydraulic detention time was about 5.2 days. Average heights of the cattail stems in June and October 2003 were 47.2 and 164.6cm, respectively. The average number of stems was 10.2 stems/$m^2$ in June 2003 and 18.8 stems/$m^2$ in October 2003. Average temperature of influent and effluent ranged 23.4 and $24.2^{\circ}C$, respectively. The average TP concentrations of influent and effluent were about 1.31, 0.50mg/L, respectively. TP loading rate of influent into the wetland averaged 26.81mg/$m^2$, day and average TP loading rate of effluent was 10.04mg/$m^2$, day. Monthly average TP removal by the wetland during the warm growing season of cattails(June to September) ranged 16.28~19.57mg/$m^2$, day and during the cold senescent period (October to November) ranged 12.62~13.90mg/$m^2$, day. TP removal in the wetland continued during the cold winter months and was primarily done by sedimentation and precipitation of phosphorus rather than phosphorus absorption by cattails and microorganisms.