• Title/Summary/Keyword: Hybrid room-and-pillar method

Search Result 3, Processing Time 0.018 seconds

A Study on the Stability Analysis of Underground Mine using LIDAR (LIDAR를 활용한 지하광산의 안정성 분석에 관한 연구)

  • Lee, Seung-Joong;Kim, Byung-Ryeol;Jin, Yeon-Ho;Choi, Sung-Oong
    • Tunnel and Underground Space
    • /
    • v.27 no.6
    • /
    • pp.406-421
    • /
    • 2017
  • This study describes a precise numerical analysis process by adopting the real image of mine openings obtained by LIDAR, which can produce a point cloud data by measuring the target surface numerically. Research area is a section of underground limestone mine which is used hybrid room-and-pillar method for improving the production rate. From the application of LIDAR to this section several results were deduced, that is, the central axis of upper and lower vertical safety pillars is distorted to the direction of NW and the section area of lower vertical safety pillar is $34m^2$ smaller than the designed area of $100m^2$. The results of precise measurement in geometrical shape of mine openings and precise simulation in numerical analysis confirms that LIDAR techniques can be suggested as a valuable tool for stability analysis in underground mine by configuring the mine opening shape.

Analysis on the Ore Recovery from Operating the Room & Pillar Hybrid Mining Method in the Korean Limestone Mine (국내 석회석 광산에서 주방식하이브리드 채광법의 채수율 분석)

  • Kwon, Dukjoon;Kim, Jaedong
    • Tunnel and Underground Space
    • /
    • v.27 no.3
    • /
    • pp.161-171
    • /
    • 2017
  • Demand for high-grade limestone is increasing, but the production in the domestic mines has been limited due to the lack of systematic development plans and efforts to develop mining technology to improve the recovery ratio, transition to high-cost underground mining due to increasing social awareness of environmental protection, and the smallness of the domestic mining industry, etc. In this study in connection with this issue, an analysis on the recovery change by improvement of mining method was executed. 3D modeling technique was used to construct a 3D model. 3D model includes the geological structure, the limestone ore body and the underground pits and tunnels excavated at the Daepyeong District of Daesung MDI Donghae District. By using the 3D model, measured resources, reserves and ore recovery were evaluated from the results of pilot operation of the room and pillar hybrid mining method, which is a variant of room and pillar mining method. These results were compared with those obtained from the conventional mining method. The ore recovery obtained by hybrid mining method was found to be up to 71.6%, showing about 26%p. increase compared with the case of conventional mining method.

Case study of microseismic techniques for stability analysis of pillars in a limestone mine (석회석 광산 내 광주의 안정성 분석을 위한 미소진동 계측기술의 현장적용)

  • Kim, Chang Oh;Um, Woo-Yong;Chung, So-Keul;Cheon, Dae-Sung
    • Tunnel and Underground Space
    • /
    • v.26 no.1
    • /
    • pp.1-11
    • /
    • 2016
  • This study deals with the case that was the field application of the microseismic monitoring techniques for the stability monitoring in a domestic mine. The usefulness and limitations of the microseismic techniques were examined through analyzing the microseismic monitored data. The target limestone mine adopted a hybrid room-and-pillar mining method to improve the extraction ratio. The accelerometers were installed in each vertical pillar within the test bed which has the horizontal cross-section $50m{\times}50m$. The measured signals were divided into 4 types; blasting induced signal, drilling induced signal, damage induced signal, and electric noise. The stability analysis was performed based on the measured damage induced signals. After the blasting in the mining section close to the test bed, the damage of the pillar was increased and rockfall near the test bed could be estimated from monitored microseismic data. It was possible to assess the pillar stability from the changes of daily monitored data and the proposed safety criteria from the accumulated monitored data. However, there was a difficulty to determine the 3D microseismic source positions due to the 2D local sensor arrays. Also, it was needed to use real-time monitoring methods in domestic mines. By complementing the problems encountered in the mine application and comparing microseismic monitored data with mining operations, the microseismic monitoring technique can be used as a better safety method.