Analysis of the HwaSungSungYoukEuGye for Estimating the Resources of PalDal-Mun Construction (팔달문 건설의 소요자원 산정을 위한 화성성열의궤 분석)

  • Kim, Kyoon-Tai
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05c
    • /
    • pp.1-6
    • /
    • 2009
  • The HwaSungSungYouk is one of the construction project in viewpoint of today's construction management and various information how to build the HwaSung at the last of the eighteen century had been recorded in HwaSungSungYoukEuGye. The purpose of this study is to analyse the data in HwaSungSungYoukEuGye in viewpoint of today's construction management for estimating the resources of PalDal-mun construction. In the record, there are a 10t of information relate to time management, cost management and human resource management, and the concept of modern construction management will be also use to figure out the construction data of the HwaSungSungYoukEuGye.

  • PDF

A Study on the Analysis of the HwaSungSungYouk-EuGye in the Aspect of the Modern Construction Management -Focus on ChangAhn-Mun's Construction Work- (현대(現代) 건설관리개념(建設管理槪念)을 통한 "화성성역의궤(華城城役儀軌)"의 분석(分析)에 관한 연구(硏究))

  • Yi, Tae-Yeual;Lee, Sang-Hae
    • Journal of architectural history
    • /
    • v.10 no.3 s.27
    • /
    • pp.61-76
    • /
    • 2001
  • The purpose of this study is not only to evaluate the capacity of construction management but also to understand the capacity of construction productivity by analysing various information, mainly collected from the book, HwaSungSungYouk-EuGye. The book was made by ChungCho who was one of the great kings Choson Dynasty, which has lots of information about how to build HwaSung during the last of the eighteen century. It is true that previous researches have showed lots of limitation to study the HwaSungSungYouk-EuGye though it contained a plenty of construction data. The main reason would be the absence of study methods to analyze HwaSungSungYouk-EuGye systematically. That's why there have not been overall studies about the HwaSungSungYouk-EuGye. This study starts from the definition that the HwaSungSungYouk was one of the construction projects which is the concept for construction management today. The construction project can be defined in terms of its distinctive characteristics: a project is a temporary endeavor undertaken to create a unique product. Temporary means that every project has a definite beginning and a definite end. Unique means the product is different in some distinguishing way from all similar products. A project is also undertaken several kinds of organizations. They may Involve a single person or many thousands. This study is to show some of the effective methods. Firstly, the concept of the database system today can be applied to effectively control and classify the complicated data in the HwaSungSungYouk-EuGye. Secondly, on the basis of the database system, the concept of modern construction management will be also use to figure out the construction data of the HwaSungSungYouk-EuGye.

  • PDF

The Concept of Construction Management Showing up the HwaSungSungYoukEuGye in Choson Dynasty (조선시대 화성성역의궤의 건설관리적 의미)

  • Kim, Kyoon-Tai
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.167-171
    • /
    • 2008
  • HwaSungSungYouk was one of the construction project in viewpoint of today's construction management and various information how to build the HwaSung at the last of the eighteen century had been recored in HwaSungSungYoukEuGye. The purpose of this study is to analyse the HwaSungSungYoukEuGye' management technic in viewpoint of today's construction management. In the record, there are a lot of informtion relate to record management, time management, cost management, etc. and the concept of the managements can be applied to today's construction project effectively. The concept and detail of the HwaSungSungYouk's project management should be analysed more.

  • PDF

A Case Analysis on the Time Management of the HwaSung Construction Project in Choseon Dynasty (조선시대 화성성역의 공정관리 사례분석)

  • Kim, Kyoon-Tai
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.6
    • /
    • pp.139-145
    • /
    • 2008
  • The objective of this paper is to analyze the construction management capacity of Choseon Dynasty and suggest a new interpretation on the construction capacity of the time management by reviewing the time management case during a representative construction project, HwaSungk construction project implemented in the latter period of Choseon Dynasty around 200 years ago. which was described in HwaSungSungYoukEuGye. The analysis results of the time management capacity during the latter period of Choseon Dynasty depicted in the HwaSungSungYoukEuGye is summarized as follows: (1) It took 2 years and 6 months to complete the Hwasung construction project. However, all of the single buildings were constructed within 6 months, a relatively short period of time. Judging from the fact, it can be assumed that the construction techniques using wood of the time were very sophisticated. (2) When the HwaSung was constructed, it took a relatively short period of time to complete works from placing the foundation to erecting columns and to placing a crossbeam on the columns. Based on the fact, it can be also inferred that assembly processing techniques of the time were also sophisticated and the level of member processing and assembling techniques of the time was considerably good as well. (3) The HwaSung construction was continued throughout the year without any influence by weather conditions, which tells us that division of labor by work was performed, and it was possible to mobilize labor force for the construction project even during the busy farming seasons.

A Study on the Application of the Construction Management showing up the HuaSungSungYouk-EuGye during the Chosen Dynasty (조선시대 화성성역의궤에 나타난 건설관리 적용에 관한 연구)

  • Yi Tae-Yeual;Lee Sang-Hae;Kim Yea-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.341-346
    • /
    • 2001
  • The purpose of this study is not only to show up the fact which a kind of construction management was applied during the ancient Korea, especially, Chosun Dynasty but also to understand its construction capacity by analysing various information. mainly collected from the book, HwaSungSungYouk-EuGye. The book was made by ChungCho who was one of the great kings Choson Dynasty, which has lots of information about how to build HwaSung during the last of the eighteen century. This study starts from the definition that the HwaSungSungYouk was one of the construction projects which is the concept for construction management today. The construction project can be defined in terms of its distinctive characteristics: a project is a temporary endeavor undertaken to create a unique product. Temporary means that every project has a definite beginning and a definite end. Unique means the product is different in some distinguishing way from all similar products. A project is also undertaken several kinds of organizations. They may involve a single person or many thousands. 1'his study is to show some of the effective methods. Firstly, the concept of the database system today can be applied to effectively control and classify the complicated data in the HwaSungSungYouk-EuGye. Secondly, on the basis of the database system, the concept of modem construction management will be also use to figure out the construction data of the HwaSungSungYouk-EuGye.

  • PDF

A Modern Interpretation of the Resources Required for the Construction of Paldal-mun in the Joseon Dynasty through the Analysis of HwaSungSungYouk-EuGye (화성성역의궤 분석을 통한 조선시대 팔달문 건설 소요자원의 현대적 해석)

  • Kim, Kyoon-Tai
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.6
    • /
    • pp.641-652
    • /
    • 2021
  • Although detailed information on the construction of Hwasung was recorded in the Hwasungsungyouk-eugye, analysis and evaluation from the perspective of modern construction management were limited. Therefore, in this study, construction management related information such as time, cost, and manpower was analyzed for Paldal-mun. The main work involved in the construction of Paldal-mun was foundation work and masonry work, and the total construction period was 6 months, with the overall construction progressing very quickly. The total cost of the construction of Paldal-mun was about 52,423 Nyong, which can be divided into about 15,9332 Nyang for materials and 36,4901 Nyang for labor cost. Converting these to present value, the material cost is about 1.1 billion won and the labor cost is about 2.5 billion won, and the sum of these is about 3.6 billion won. In the future, we plan to conduct additional research in this area such as deriving detailed input manpower related to the work period for each type of work.