• Title/Summary/Keyword: Housing Development Project

Search Result 255, Processing Time 0.019 seconds

A Study of the Urban Tree Canopy Mean Radiant Temperature Mitigation Estimation (도시림의 여름철 평균복사온도 저감 추정 연구)

  • An, Seung Man;Son, Hak-gi;Lee, Kyoo-Seock;Yi, Chaeyeon
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.44 no.1
    • /
    • pp.93-106
    • /
    • 2016
  • This study aimed to estimate and evaluate the thermal mitigation of the urban tree canopy on the summer outdoor environment by quantitative use of mean radiant temperature. This study applied the SOLWEIG model based $T_{mrt}$ comparison method by using both (1) urban tree canopy presence examples and (2) urban tree canopy absence examples as constructed from airborne LiDAR system based three-dimensional point cloud data. As a result, it was found that an urban tree canopy can provide a decrease in the entire domain averaged daily mean $T_{mrt}$ about $5^{\circ}C$ and that the difference can increase up to $33^{\circ}C$ depending both on sun position and site conditions. These results will enhance urban microclimate studies such as indices (e.g., wind speed, humidity, air temperature) and biometeorology (e.g., perceived temperature) and will be used to support forest based public green policy development.

A study on improving the bike way in the Urban river Waterfront (도시하천 수변공간 내 자전거도로 개선방안 연구)

  • Seo, Yong-Soo;Dong, Jae-Uk;Cho, Sung-Hak
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.5
    • /
    • pp.481-489
    • /
    • 2017
  • The study area,Cheonan Stream, is an urban river that flows through urban areas in close proximity to densely populated areas and multi-use facilities. The natural river improvement project from 2006 to 2015 improved the quality of life of local residents with the improvement of river function, the restoration of the natural ecosystem and the securement of hydrophilic space. A bike way in the constructed waterside space was built focusing on trails. This study suggests improvements appropriate for insufficient bike way function-related regulations. The problems of ramps, river crossing facilities, stairway facilities, safety facilities, signs, road markings, and parking facilities, etc.have arisen in the utilization situation and citizen consciousness survey. As an improvement, it was suggested that 12% or fewer ramps should be improved, a submerged bridge should be installed at 7 places separated by stepping bridges, and signs and road markings according to bike way-related regulations should be installed and bike parking facilities at Cheonan station and Cheonan bus terminal should be expanded. The bike way in the waterfront of ChoenanCheon(river) will increase the accessibility and utilization rate of short-distance transportation with the institutional expansion of bike use facilities and work organizations and the improvement of facilities in accordance with urban rivers and bike-related regulations. Therefore, it is expected that the development of the living space will be beneficial for the citizens due to the elimination of traffic in the city and the activation of bike traffic.

Development of a Computer System and Suggestion of Man-Hours for Demolition Cost Estimation (해체공사비 산정을 위한 품산정 기준과 전산시스템의 개발)

  • Kim, Hyo Jin;Kang, Leen Seok;Lee, Dong Wook;Kim, Chang Hak
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.3
    • /
    • pp.1007-1015
    • /
    • 2014
  • The importance of construction waste reusing and recycling is becoming increasingly large because the demolition industry is in current trend to pursue for sustainable growth. As the considering situation of the domestic housing construction and existing house, a scale of demolition industry is expected to be increased continuously. But the related cost regulations that are used in tendering in the demolition industry are insufficient, also the computer system for estimating the demolition costs have not been developed yet. Therefore, in this study suggests man-hours of 21EA items which are utilized to estimate demolition cost and work rate of $1.0m^3$ breaker which is used mostly in domestic demolition industry after analyzing a case study for deconstruction works. The computer system is developed for the estimating demolition cost easily, which are including five modules such as a project information, a unit cost management, a standard unit cost table, a bill of quantity, and a reporting system. This computer system is possible to apply for estimating cost of both mechanical demolition and blasting demolition. The biggest advantage of this system is to estimate cost to utilize standard WBS which is linked with standard unit table and each DB. This can help unskilled users use easily for it.

Comparative Analysis of BIM Acceptance Factors between Korea and China (한국과 중국의 BIM 수용영향요인 비교분석)

  • Song, Jingxu;Lee, Seulki;Yu, Joungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.3-14
    • /
    • 2021
  • In the Chinese construction industry, the utilization of Building Information Modeling (BIM) aims to increase the total output of the construction industry by solving the problem of inefficient interoperability in the construction industry. In 2011, the Chinese Ministry of Housing and Urban-Rural Development despite the technical advantages of BIM and the government policy, the BIM adoption rate in China is lower than 45%. Meanwhile, as the South Korean construction industry is a step ahead of its Chinese counterpart in introducing and utilizing BIM, it is expected that BIM is more actively utilized and accepted in South Korea than in China. According to a comparative study based on the hype-cycle theory, South Korea is at a more advanced stage of introducing BIM, than in China. This study aimed to suggest how to increase BIM utilization rates in China. To this end, this study comparatively analyzed factors affecting BIM acceptance between China and South Korea. For the comparative analysis of the BIM acceptance factors between China and South Korea, literature reviews on the technology acceptance model (TAM) and BIM acceptance model were carried out, and based on that, the BIM acceptance factors were classified. Other BIM acceptance factors were also added and considered, as they reflected Chinese national characteristics and construction industry. As for the derived BIM acceptance factors, construction project participants, especially actual BIM users in China and South Korea, were targeted for the survey. A t-test using SPSS 22.00 was carried out to identify significant differences in data. Finally, based on the t-test results, this study suggested ways of improving the BIM utilization rate in China. Based on the findings, this study is expected to contribute to activating BIM adoption in the Chinese construction industry and also to set a theoretical foundation for future studies on BIM utilization in the industry.

Development of Geotechnical Information Input System Based on GIS on Standization of Geotechnical Investigation Result-format and Metadata (지반조사성과 양식 및 메타데이터 표준화를 통한 GIS기반의 지반정보 입력시스템 개발)

  • Jang, YongGu;Lee, SangHoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.4D
    • /
    • pp.545-551
    • /
    • 2008
  • The MOCT(Ministry of Construction & Transportation) gave a order named as "The guideline for computerization and application of geotechnical investigation result" to an affiliated organization in March 2007. Today, pilot project of construction of geotechnical information database is in process to be stable for its system after applying this guideline, and discipline how to input investigated data for related users. We have developed standard for geotechnical investigation result-format, metadata for distribution of geotechnical information and to coordinate based on world geodetic system. Also, We had a introduce to status with respect to use the input system, collect a statistics of input contents. At a result, improvement items of input system is proposed. It was analyzed that most users put to practical use easily as a result of education for making use of on the spot of the developed GIIS. But There were problems with the GIIS as well as complexity of metadata formation, such as error of moving part of information window, and a part of recognition error of install program in accordance with computer OS circumstances. Particularly, to improve some parts of GIIS is needed, because of use of or KNHC (Korea National Housing Corporation)-specific format and difference of input process followed by MOCT's guideline. In this study, it is planning to make up for occurred problems, and improvements when operating and managing the Geotechnical Information DB center in 2008.