• Title/Summary/Keyword: Hot-Standby

Search Result 40, Processing Time 0.022 seconds

Reliability Analysis of Hot-Standby Sparing System with Common Cause Failures for Railway (공통고장모드를 고려한 대기 이중계 구조의 철도 시스템 신뢰도 분석)

  • Park, Chan-woo;Chae, Eunkyung;Shin, Duck-ho
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.3
    • /
    • pp.349-355
    • /
    • 2017
  • Failures of railway systems can result in train delays or accidents, and therefore high reliability is required to ensure safety of railway systems. To improve reliability, railway systems are designed with redundant systems so that the standby system will continue to function normally even if the primary system fails. Generally, overall system reliability can be evaluated by the reliabilities of the parts of the whole system and the reliability of the redundant system considering common failures in case of each system is not conform physical, functional and process independent. In this study, the reliability of the hot-standby sparing system is analyzed the independent systems and dependent systems with common failures. The reliability for the standby system can be effectively analysed using Markov models, which can model the redundant configuration and the state transition.

Comparative studies for Bayes Reliability Estimators of Standby System with Imperfect Switch

  • Lee, Changsoo;Chang, Chuseock
    • Communications for Statistical Applications and Methods
    • /
    • v.7 no.2
    • /
    • pp.525-531
    • /
    • 2000
  • Bayes estimators for reliability of a two-unit hot standby system with the imperfect switch based upon a complete sample of failure times observed from exponential distributions under squared error loss and some priors for failure rates are proposed, and mean squared errors of proposed several Bayes estimators for the system reliability are compared unmerically each other through the Monte Carlo simulation.

  • PDF

Notes on the Comparative Study of the Reliability Estimation for Standby System with Exponential Lifetime Distribution

  • Kim, Hee-Jae
    • Journal of the Korean Data and Information Science Society
    • /
    • v.14 no.4
    • /
    • pp.1055-1065
    • /
    • 2003
  • We shall propose maximum likelihood, Bayesian and generalized maximum likelihood estimation for the reliability of the two-unit hot standby system with exponential lifetime distribution that switch is perfect. Each estimation will be compared numerically in terms of various mission times, parameter values and asymptotic relative efficiency through Monte Carlo simulation.

  • PDF

Notes on the Comparative Study of the Reliability Estimation for Standby System with Rayleigh Lifetime Distribution

  • Kim, Hee-Jae
    • Journal of the Korean Data and Information Science Society
    • /
    • v.15 no.1
    • /
    • pp.239-250
    • /
    • 2004
  • We shall propose maximum likelihood, Bayesian and generalized maximum likelihood estimation for the reliability of the two-unit hot standby system with Rayleigh lifetime distribution that switch is perfect. Each estimation will be compared numerically in terms of various mission times, parameter values and asymptotic relative efficiency through Monte Carlo simulation.

  • PDF

Bayesian Reliability Estimation of Two-Unit Rot Standby System

  • Lee, Chang-Soo;Kim, Hee-Jae;Moon, Yeung-Gil;Lee, Jang-Choon
    • Journal of the Korean Data and Information Science Society
    • /
    • v.9 no.1
    • /
    • pp.89-94
    • /
    • 1998
  • We shall propose several Bayes estimators for reliability of a two-unit hot standby system with the imperfect switch based upon a complete sample of failure times observed from an exponential distribution, and the proposed reliability Bayesian estimators are compared numerically each other in sense of mean squared error.

  • PDF

A Study on Power Supply Method Design for Hot Standby Sparing System via Reliability Modeling (신뢰도모델링에 의한 이중계제어기 전원공급방식 설계에 관한 연구)

  • Shin, Duck-O;Lee, Kang-Mi;Lee, Jae-Ho;Kim, Yong-Kyu
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.5
    • /
    • pp.527-532
    • /
    • 2007
  • In this paper, we suggest those two design plans for power supply method of Hot Standby Sparing System; one is the plan using MTBF based on Constant Failure Rate, and the plan using Reliability Function is the other. Traditionally, RBD (Reliability Block Diagram) is used for reliability prediction which is required to meet any requirements before system operation. However, the system that has redundancy, such as Hot Standby Sparing System, Is not suitable for system reliability modeling using combination model, such as RBD. In this paper, therefore, we demonstrate that for redundancy controller, redundancy modeling design toward fault occurrence design is more effective to build up a system with higher reliability and achieve the effectiveness of loss cost due to maintenance and failure occurred in operation, rather than combinational modeling design.

A Case Study of Measuring and Analyzing Electric Energy Usage in University Facilities Using Smart Plug (스마트플러그(IOT)를 이용한 대학시설의 전기에너지 사용량 계측 및 분석 사례 연구)

  • Park, Jun-Young;Lee, Chun-Kyong;Park, Tae-Keun
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.9
    • /
    • pp.27-34
    • /
    • 2018
  • The purpose of this study is to demonstrate and analyze the function of a Smart Plug before and after it is applied on the electrical appliances by controlling standby power usage. The research measures and analyzes the amount of electrical energy used while activating the Smart Plug with two types of appliances in a university facilities. The smart plugs were applied into a Group 1 appliances (Multi-function device, computer, laptop, Air con) which completely hinder the standby power, and a Group 2 appliances (Refrigerator, cold and hot water dispenser) which does not completely hinder the standby powers due to the characteristics of the function. First, the total standby power saving of all electrical appliances (Group 1 and Group 2) using the Smart plug was measured as 4.59%. Second, the energy saving of the Group 1 products was analyzed as 26.43%. Third, the standby power saving of the air conditioners from mid October to early December was measured as 31.06%, during the seasons when air conditioning was not actively in use. The research indicates that all specified appliances did have better energy efficiency with the Smart plug regardless of the amount of energy usage.

Design of Processor Duplication using Extend Warm standby sharing (Warm standby sharing을 이용한 프로세서 이중화의 설계)

  • Goo, Jung-Du
    • Proceedings of the KAIS Fall Conference
    • /
    • 2010.05a
    • /
    • pp.336-338
    • /
    • 2010
  • 이동통신시스템에서 RNC의 MCP는 호 처리를 담당하는 부분으로, 신뢰도와 실시간성이 요구된다. MCP는 높은 견고성을 갖도록 구현되지만 다소간의 오류 율(Fault late)은 존재할 수밖에 없으므로 프로세서를 이중화하여 활성화된 프로세서가 장애를 일으키더라도 대기중인 프로세서가 연속적인 서비스를 제공할 수 있어야 한다. Warm standby sharing에 비하여 Hot standby sharing은 데이터 손실이 없고 오류 데이터가 확산되지 않는 등의 다수의 장점을 갖지만 동기화 문제로 인하여 이를 시스템에 실제로 구현하는 것은 어렵다. 따라서 본 연구에서는 동기화의 장점에 데이터 손실 및 거짓 데이터의 확산 문제를 개선 함으로서, 실제 구현의 용이성 및 성능 향상이라는 결과를 얻으려 하였다.

  • PDF

LOSS OF OFFSITE POWER TEST EXPERIENCE FOR YGN 4

  • Chi, Sung-Goo;Sung, Kang-Sik;Kim, Se-Chang;Kim, Eul-Ki;Eom, Young-Meen;Park, Young-Boo
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1995.10a
    • /
    • pp.230-234
    • /
    • 1995
  • The loss of offsite power test was successfully performed on YGN 4 to demonstrate that the reactor can be shutdown and the RCS can be maintained in a hot standby condition following a loss of all offsite Alternating Current (AC) power. Following the loss of main generator and all offsite AC power, the ensile emergency diesel generators were automatically started and the plant was stabilized via natural circulation. Plant conditions were maintained in hot standby for at least 30 minutes before offsite power was restored. Thus, the capability of equipment, controls and instrumentation necessary to remove decay heat from the core using only ensile emergency power was demonstrated, thereby satisfying all objectives and acceptance criteria of the test.

  • PDF

Development of Digital DC-ARC Welding Machine

  • Kim, Hak-Kyeong;Park, Ba-Da
    • Journal of Ocean Engineering and Technology
    • /
    • v.20 no.6 s.73
    • /
    • pp.18-23
    • /
    • 2006
  • This paper introduces the results of the development of a new mobile digital DC-arc welding machine (DDWM). A simple PI controller is applied to the DDWM to control the output welding current that is tracking the constant setting current. Furthermore, a hot-start function, an anti-stuck function, a standby mode and an intelligential circuit breaker (ICB) are included in the DDWM. The DDWM increases welding quality and saves more power energy than a conventional welding machine. The DDWM is changed from ready mode into the standby mode, automatically, after 2-minute intervals from this unload start. Then, the DDWM is changed into ready mode, automatically, since it is reused for welding. Moreover, the DDWM increases welding quality, productivity and reduces costs of welding. So, the DDWM can make a considerable contribution to the mobile welding industries. The effectiveness of the DDWM was proven by the experimental results.