Analysis of Tensile Force of Nail and Displacement of Soil Nailed Wall at Stepwise Excavation (단계별 굴착시 쏘일네일링 벽체의 변위와 네일의 인장력 분석)

  • 전성곤
    • Journal of the Korean Geotechnical Society
    • /
    • v.15 no.6
    • /
    • pp.71-86
    • /
    • 1999
  • The displacements of soil nailed wall and the nail tensile force for 11 soil nailing sites were investigated by using measurements obtained from inclinometer and strain gauge. The maximum horizontal displacement which occurred between 5% and 15% of the final excavation depth was found to be below 0.3% and 0.2% of excavation depth for well and poorly constructed sites. It was also found that the maximum horizontal displacements for 0.4%, 0.3% and 0.2% of excavation depth occurred when the ratios of nail length to final excavation depth were 0.5, 0.5~0.6 and 0.6~0.7. But the maximum horizontal displacement increased by 0.3% of excavation depth when the ratio was above 0.7. This was probably due to the shallow excavation depth and the deep soil stratum. The non-dimensional maximum tensile force of nail, K, from ground surface to $(0.6H_f)$ of the final excavation depth was less than 0.8 and decreased linearly between $(0.6H_f)$ and the final excavation depth. Also, the maximum tensile force was found to reach up to 60% of the ultimate tensile force at final excavation.

  • PDF

Stress Release Zone Around Sub-structure Constructed by Non-open Cut Methods (비개착공법으로 건설된 지하구조물 주변 지반 응력이완영역 규명)

  • Seo, Ho-Sung;Cho, Kook-Hwan
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.4
    • /
    • pp.480-488
    • /
    • 2016
  • For the development of areas around railway lines, subsurface construction using the non-open cut method under the railway has recently been increased. However, when a structure under a railway is constructed, the stress release of the ground is not considered an important factor in the design. In this study, laboratory tests were conducted to determine a zone of stress relaxation. Field tests using an inclinometer were performed to measure the horizontal displacement of the ground during non-open cut construction. The stress release zone and the subgrade stiffness were investigated by numerical analysis. The results of the laboratory tests indicated that the failure zone in the ground was similar to a Rankine's active earth pressure zone. The measured data from the inclinometer in the field tests showed that displacements started when a steel pipe was pushed into the ground. The results of numerical analysis show that lateral earth pressure was also close to Rankine's active earth pressure. The roadbed support stiffness of the soil around the structure decreased to 40% of the original value. The ground around the subsurface structure constructed using nonopen cut methods should be reinforced to maintain the running stability of train.

Instrumentation Management of the Deep Soft Ground with Dredged Clay Reclaimed in the Upper (준설점토가 상부에 매립된 대심도 연약지반 계측관리)

  • Jung, Na-Young;Kang, Seung-Chan;Kim, Tae-Hyung
    • Journal of the Korean Geotechnical Society
    • /
    • v.38 no.12
    • /
    • pp.67-78
    • /
    • 2022
  • In this study, the measurement results of the coastal deep soft ground buried in the upper part of the dredged clay were analyzed and compared with the current specification standards. Based on the results, a suitable proposal was suggested for the selection, installation, data arrangement, and analysis of each instrument used in the deep soft ground improvement construction. The pore water pressure meter has a range of 1.5 times or more of the expected measurement range, considering the field conditions of the soft ground. The groundwater level meter installed in the horizontal drainage layer checks the change in the groundwater level during the embanking as well as the performance of the catchment well and the horizontal drainage layer. Therefore, it is important to manage so that the groundwater level exists inside the horizontal drainage layer during embanking. It is enough to install the inclinometer in the gravel layer below the soft ground or weathered rock with an N value of 40 or more for the deep soft ground. It seems desirable to install a screw type for differential settlement meter. However, the screw type should not settle due to its own weight. Considering that it is a dredged landfill where subsidence occurs significantly, it is sufficient to manage the tolerance of leveling at about 10 mm (L is the one-way distance (km)).

Design of a Full Polarimetric Scatterometer for X-Band (X-밴드용 완전 편파 Scatterometer 설계)

  • Hwang, Ji-Hwan;Lee, Kyung-Yup;Park, Seong-Min;Oh, Yi-Sok
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.20 no.12
    • /
    • pp.1308-1315
    • /
    • 2009
  • A full-polarimetric scatterometer(HPS: Hongik Polarimetric Scatterometer) for X-band is designed, fabricated, and verified using the theoretically well-known point-targets in this paper. The X-band full-polarimetric scatterometer consists of an OMT(Orthogonal-Mode Transducer)+horn antenna, the angle control part for the OMT+horn antenna, a transmitter/receiver with a network analyzer and a frequency-conversion circuitry, and a movable support of these parts. We use an inclinometer sensor to control the vertical and horizontal incidence angles. The full polarimetric data can be obtained because of the polarization switches and the OMT. The accuracy of the scatterometer system is verified by measuring the polarimetric RCS(Radar Cross Section) of one of the theoretically well-known point-targets, i.e., a corner reflector.

Characteristics of Subsidence of a Road During the New Tubular Roof Construction Around a Shallow Tunnel (저심도 터널주변의 NTR보강 중 발생한 도로면 침하의 특성)

  • Kim, Cheehwan
    • Tunnel and Underground Space
    • /
    • v.28 no.6
    • /
    • pp.620-634
    • /
    • 2018
  • The NTR(New Tubular Roof) method was used to secure the stability of the tunnel and minimize the subsidence of the road. The tunnel was constructed at about 7.5 meters deep below the highway. with a width of about 21 meters. Following the NTR method, 13 steel pipes with a diameter of 2.3 meters were digged and pushed in longitudinally along the tunnel profile and cut out sides of pipes to connect to adjacent pipes, then filled the inside of pipes and the connected space between pipes with concrete to complete the lining of the tunnel to be excavated. As the steel pipes were digged in sequentially, the area of relaxation was connected to each other and behaves like a gradually widening tunnel. When the steel pipes were digged in to the widest points of the tunnel, the settlement rate of the road surface was increasing to the maximum as 2.2 mm and the total settlement until the lining construction was approximately 7.7 mm. After that, by excavating a tunnel inside the pre-installed lining, an additional settlement of about 4.3 mm was occurred, resulting in the total settlement of about 11.8 mm after completing of tunnel construction.

Estimation of the Deformation Modulus for a Fault Zone using Crown Settlements Measured During Tunnel Excavation (터널 굴착 중 측정된 천단변위를 이용한 단층대의 변형계수 산정)

  • Yun, Hyun-Seok;Moon, Seong-Woo;Song, Gyu-Jin;Seo, Yong-Seok;Kim, Ji-Soo;Woo, Sang-Baik
    • The Journal of Engineering Geology
    • /
    • v.24 no.2
    • /
    • pp.227-235
    • /
    • 2014
  • The deformation modulus is one of the essential factors in determining ground behavior and safety during tunnel excavation. In this study, we conducted a back-analysis using crown settlements measured during tunnel excavation, using a horizontal inclinometer on a fault zone of pegmatite, and calculated the deformation modulus of the fault zone. This deformation modulus calculation was then compared with deformation moduli found through established relationships that use the correlation between RMR and the deformation modulus, as well as the results of pressure-meter tests. The deformation moduli calculated by back-analysis differs significantly from the deformation moduli determined through established relationships, as well as the results from pressure-meter tests conducted across the study area. Furthermore, the maximum crown settlements derived from numerical analysis conducted by applying deformation moduli determined by these established relationships and the pressure-meter tests produced noticeable differences. This result indicates that in the case of a weak rock mass, such as a fault zone, it is inappropriate to estimate the deformation modulus using preexisting relationships, and caution must be taken when considering the geological and geotechnical characteristics of weak rock.

Evaluation of Soil Stiffness and Excavation Support Wall Deformation at Deep Excavation Site Using Inverse Analysis (역해석을 이용한 지반 강성 산정 및 굴착 지지벽체의 변형 평가)

  • Kim, Taesik;Jung, Young-Hoon
    • Journal of the Korean GEO-environmental Society
    • /
    • v.21 no.12
    • /
    • pp.5-10
    • /
    • 2020
  • In this study, the evolution of soil engineering property values according to excavation was analyzed through the inverse analysis for the OO deep excavation site located in Incheon. The stiffness of the ground was updated by comparing the horizontal wall deformation of the excavation support wall calculated by the finite element analysis at each stage of excavation and the value measured using an inclinometer. The updated stiffness was used to predict the response of the excavation support wall in the next excavation step. The finite element analysis method using the Hardening Soil model was used, and the stratum where the excavation support wall is located was selected as the stratum for the inverse analysis. The inverse analysis results showed that the stiffness value at the stiffness value at the initial stage of excavation is larger than the stiffness used in the original design. As the excavation proceeds, the stiffness calculated through the second inverse analysis was found to decrease compared to the value derived by the first inverse analysis. Therefore, it can be stated that the deformation of the excavation support wall can be accurately calculated through finite element analysis when an appropriate stiffness value is input according to the excavation stage.

Characteristics of Shear Strength and Consolidation Behavior of Soft Ground according to Stage Fill (단계성토에 따른 연약지반의 전단강도 및 압밀거동 특성)

  • Bang, Seongtaek
    • Journal of the Korean GEO-environmental Society
    • /
    • v.21 no.7
    • /
    • pp.17-26
    • /
    • 2020
  • The soft ground in the southwest coastal area composed of marine clay is greatly influenced by sediment composition, particle size distribution, particle shape, adsorption ions and pore water characteristics, tide and temperature. In addition, the geotechnical properties are very complex due to stress history, change in pore water, dissolution process and gas formation. In this study, the physical and mechanical properties of the soft ground were evaluated through field tests and laboratory tests to investigate the strength increase characteristics according to consolidation on the soft ground in the southwest coast. In addition, in order to understand the consolidation behavior of soft ground such as subsidence, pore water pressure, horizontal displacement of soil by embankment load, measuring instruments such as pore water pressuremeter, settlement gauge, inclinometer and differential settlement gauge was installed, and a piezocon penetration test was carried out step by step to confirm the increase in shear strength of the ground. Through this, it was confirmed that the shear strength of the ground is increased according to the stages of filling. In addition, by evaluating the properties of consolidation behavior, strength increase and consolidation prediction by empirical methods and theories were compared to analyze the characteristics of strength increase rate and consolidation behavior in consideration of regional characteristics.