INCORPORATION OF TOTAL TIME MANAGEMENT INTO HIGHWAY PROJECT TIME MANAGEMENT SYSTEM

  • Yuan Jianbo;Liu Weijun;Zhang Jianren
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.796-801
    • /
    • 2005
  • Time management is one of the critical tasks in project management. Based on the theories of total quality management, this authors presented a project time management method, total time management (TTM), so as to facilitate highway project time management. This paper discussed the four fundamental characteristics of TTM: total factors management, staff management, project life cycle management, and Plan-Do-Check-Action (PDCA) cycle management. Now, most managers use computer software to manage the project. In order to make the theory of TTM more executable, the authors develop a project time management system suitable for TTM. This paper presents this time management system's analysis processes including system requirement, key functions etc..

  • PDF

Cost and Schedule Analysis of Highway Projects based on Project Types

  • Shrestha, Bandana;Shrestha, Pramen P.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.50-56
    • /
    • 2022
  • Change Orders generally impact cost and schedule performance of highway projects. However, highway projects that do not have any change orders also face cost growth and schedule delays. This study seeks to determine the cost and schedule performance of Texas DOT projects by collecting project data for 120 highway projects completed between 2016 to 2020. For the study, we selected project data that has zero or negative change orders which were then grouped and analyzed based on their Project Types i.e., maintenance works; structural works; restoration and rehabilitation works; and safety works. The study found that performance of Maintenance and Safety type projects had less cost and schedule growth among the data analyzed. Statistical tests also found that even though the projects have no change orders, Rehabilitation and Restoration type projects experienced significant schedule growth compared to others. However, the data did not show any significant cost and schedule growth for the projects when statistical tests were performed on overall data. The study concluded that highway projects are experiencing schedule growth even though the projects had no change orders. Results from the study can help planners, engineers, and administrators to gain better insight on how different types of highway projects are performing in terms of cost and schedule and eventually derive appropriate solutions to minimize cost and schedule growth in such projects.

  • PDF

EVALUATING THE FEASIBILITY OF THE HIGHWAY ENGINEERING SCHEDULE USING SIMULATION TECHNIQUE

  • Liu Weijun;Yuan Jianbo;Zhang Jianren
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.897-901
    • /
    • 2005
  • In the highway engineering, the performance, quantity and status of machines available for the project have direct impact on the project time. For instance, the status of machines, such as working or in trouble, have great influence on the activity execution. Therefore, while scheduling the project, the project manager always increases the spare machines or prolong the activity time to avoid delaying the project time when some of the machines are in trouble in construction site. However, how many are the spare machines and how long are the prolonged activity time, which are estimated subjectively by the manager. This subjective estimation has been criticized for systematically overestimating or underestimating quantity of the machines and the activity time. In the paper, we propose and prototype a model to simulate the status of the machines in construction site, and then to evaluate the schedule feasibility considering the performance, quantity and statues of the machines involved.

  • PDF

Success Factors of Highway Construction Projects in Egypt: AHP Approach

  • El-Maaty, Ahmed Ebrahim Abu;El-Hamrawy, Saad;Akal, Ahmed Yousry
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.4
    • /
    • pp.7-14
    • /
    • 2016
  • While the idea of the existence of a set of key factors for success in planning, designing and construction of projects is not new, it remains one of the most important issues in the field of construction management. This is due to project success factors are inputs to project management practice which can lead directly or indirectly to project success. This study identifies the success factors which can be used for improving the highway projects performance in Egypt during the project pre-construction and construction phases. Through a detailed literature review 35 success factors are identified. Furthermore, the AHP is adopted to prioritize the studied factors through the application of questionnaire survey. The study establishes that implementing an effective quality control and assurance systems, allow sufficient time for feasibility studies, design, drawing and tender preparation, effective cost control system and frequency of project budget updates, preparing adequate designs and drawings and determining sufficient time to implement the desired scope of work are the most important success factors for enhancing the highway projects performance in Egypt.

What's Vision For Asian Highway Construction ('아시아 고속도로'건설 이떻게 되고 있나? 국토개발측면의 $\ulcorner아시아 고속도로\urcorner$건설과 비전)

  • 정무용
    • Journal of the Korean Professional Engineers Association
    • /
    • v.37 no.4
    • /
    • pp.37-42
    • /
    • 2004
  • It seems to possible to construction of Asian Highway that will connect 32 nations of asian total 45 nations. Asian 32 nations will be connected by Asian Highway Project. and Since 1965,this project had been discussed four times to when ESCAP managed this project. This article is study about 'Asian Highway construction and vision' at the view of national and land development.

  • PDF

Economic Evaluation of National Highway Construction Projects using Real Option Pricing Models (실물옵션 가치평가모형을 이용한 국도건설사업의 경제적 가치 평가)

  • Jeong, Seong-Yun;Kim, Ji-Pyo
    • International Journal of Highway Engineering
    • /
    • v.16 no.1
    • /
    • pp.75-89
    • /
    • 2014
  • PURPOSES : This study evaluates the economic value of national highway construction projects using Real Option Pricing Models. METHODS : We identified the option premium for uncertainties associated with flexibilities according to the future's change in national highway construction projects. In order to evaluate value of future's underlying asset, we calculated the volatility of the unit price per year for benefit estimation such as VOTS, VOCS, VICS, VOPCS and VONCS that the "Transportation Facility Investment Evaluation Guidelines" presented. RESULTS : We evaluated the option premium of underlying asset through a case study of the actual national highway construction projects using ROPM. And in order to predict the changes in the option value of the future's underlying asset, we evaluated the changes of option premium for future's uncertainties by the defer of the start of construction work, the contract of project scale, and the abandon of project during pre-land compensation stages that were occurred frequently in the highway construction projects. Finally we analyzed the sensitivity of the underlying asset using volatility, risk free rate and expiration date of option. CONCLUSIONS : We concluded that a highway construction project has economic value even though static NPV had a negative(-) value because of the sum of the existing static NPV and the option premium for the future's uncertainties associated with flexibilities.

Factors That Affect Project Time and Cost Performance during Highway Construction Using Incentive/Disincentive Provisions

  • Pyeon, Jae-Ho;Park, Moonseo;Jung, Sangsun;Park, Taeho
    • Land and Housing Review
    • /
    • v.11 no.4
    • /
    • pp.115-124
    • /
    • 2020
  • Incentive/Disincentive (I/D) contract is designed for minimizing any disruption of traffic flow in road construction projects. I/D contracting projects have been evaluated with regard to time and cost performance in various states, more than 35 states. However, construction project managers and planners have little understanding of the project factors that affect the project time and cost performance of highway construction projects using I/D regulations. Therefore, the purpose of this research is to find factors that affect I/D project success or failure to improve the decision-making process for the implementation of I/D projects. In order to achieve the objectives of this research, the researchers collected I/D road construction project data from FDOT and performed evaluation for each collected project. Then, project data analysis to identify key factors that affect I/D project performance was performed. In conclusion, five significant factors for project time performance and six significant factors for project cost perfornace were identified and summarized.

Analysis of the Construction Plan and Enforcement Condition of the Port Circular Highway for Cargo Transportation of the Pusan Port (부산항 물동량 처리를 위한 광역배후수송도로의 건설계획과 시행실태 분석)

    • Journal of Korean Port Research
    • /
    • v.13 no.2
    • /
    • pp.313-322
    • /
    • 1999
  • Pusan the principal port of South Korea, has opened its door since 1876. Currently, the four-stage port construction project is under way to handle ever-growing marine transportation volume. While the port unloading capabilities are increasing the infrastructure to deal with all the transportation volume failed to catch up with them. Accordingly the city had to suffer from worst traffic congestion on due to the increasing container traffic volume causing logistical costs to rise. This study was designed to inspect the enforcement of infrastructure construction plan and suggest systematical and effective ways to improve the plan. The study focused on :\circled1The decision-making procedure, \circled2Financial resource for the plan, \circled3Effectiveness of the project enforcement, and \circled4Who will be in charge of the project. As a result from the study, these followings were suggested to improve the plan. First, Pusan Port Infrastructure consisting of (Inter-city Free way, Belt Highway and Outer Highway) should be immediately legally-regulation project. Second, the method to finance the project should be deter-mined and investment consultation among the central government the city government and private sector should be also made. Measures to make the central government budget allocation for the project mandatory should be discussed. Third, Effectiveness of the project can be doubled by gradually or partialyl opening the routes based on long-term or short-term operating plans. Fourth, The organizer of the project should be appointed, or a special task-force team in charge of the plan can be formed.

  • PDF

ORGANIZATIONAL AND COMMUNICATION ISSUES FOR MANAGING DESIGN-BUILD HIGHWAY PROJECTS

  • G. Edward Jr. Gibson;James T. O'Connor;Giovanni C. Migliaccio;Pramen P. Shrestha
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.974-979
    • /
    • 2005
  • Effective communication flow is a fundamental for the success of any construction projects. The key role of communications among project parties is even more critical in the case of Design-Build (DB) projects. Previous research has shown that these projects have an environment where integration between different project team members and schedule constraints increase channels of communication, and require faster communication flows. This paper summarizes the findings from research analyzing organizational structures and communication flow of the Texas State Highway 130 (SH130) project. Awarded in 2002, the SH130 project, totaling $1.3 billion USD, constitutes the "pilot" application for the DB approach in the state of Texas. A set of observations pertaining to team organization and communication issues in the design-build environment is included.

  • PDF

Estimation of Induced Highway Travel Demand (도로교통의 유발통행수요 추정에 관한 연구)

  • Lee, Gyu-Jin;Choe, Gi-Ju
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.7 s.93
    • /
    • pp.91-100
    • /
    • 2006
  • Travel Demand Forecasting (TDF) is an essential and critical process in the evaluation of the highway improvement Project. The four-step TDF Process has generally been used to forecast travel demand and analyze the effects of diverted travel demand based on the given Origin-Destination trips in the future. Transportation system improvements, however, generate more travel, Induced Travel Demand (ITD) or latent travel demand, which has not been considered in the project evaluation. The Purpose of this study Is to develop a model which can forecast the ITD applied theory of economics and the Program(I.D.A) which can be widely applied to project evaluation analysis. The Kang-Byun-Book-Ro expansion scenario is used to apply and analyze a real-world situation. The result highlights that as much as 15% of diverted travel demand is generated as ITD. The results of this study are expected to improve reliability of the project evaluation of the highway improvement Project.