A Study on the Analysis of Scaling Failure Cause in L-Shoulder Concrete Structure (L형측구 콘크리트 구조물의 표면박리파손 원인분석에 관한 연구)

  • Jeon, Sung Il;Nam, Jeong Hee;Ahn, Sang Hyeok;An, Ji Hwan
    • International Journal of Highway Engineering
    • /
    • v.16 no.6
    • /
    • pp.27-37
    • /
    • 2014
  • PURPOSES : The purpose of this study is to verify the causes of surface scaling at L-shoulder concrete structure. METHODS : From the literature reviews, mechanisms of frost damage were studied and material properties including strength, air void, spacing factor and scaling resistance of L-shoulder concrete structure were analyzed using core specimens taken by real fields. RESULTS : The spacing factor of air void has relatively high correlation of surface conditions : lower spacing factor at good surfacing condition and vice versa. If the compressive strength is high, even thought spacing factor does not reach the threshold value of reasonable durability, the surface scaling resistance shows higher value. Based on these test results, the compressive strength also provide positive effect on the surface scaling resistance. CONCLUSIONS : The main causes of surface scaling of L-shoulder could be summarized as unsuitable aid void amount and poor quality of air void structure. Secondly, although the compressive strength is not the governing factor of durability, but it shows the positive effect on the surface scaling resistance.

Factors That Affect Project Time and Cost Performance during Highway Construction Using Incentive/Disincentive Provisions

  • Pyeon, Jae-Ho;Park, Moonseo;Jung, Sangsun;Park, Taeho
    • Land and Housing Review
    • /
    • v.11 no.4
    • /
    • pp.115-124
    • /
    • 2020
  • Incentive/Disincentive (I/D) contract is designed for minimizing any disruption of traffic flow in road construction projects. I/D contracting projects have been evaluated with regard to time and cost performance in various states, more than 35 states. However, construction project managers and planners have little understanding of the project factors that affect the project time and cost performance of highway construction projects using I/D regulations. Therefore, the purpose of this research is to find factors that affect I/D project success or failure to improve the decision-making process for the implementation of I/D projects. In order to achieve the objectives of this research, the researchers collected I/D road construction project data from FDOT and performed evaluation for each collected project. Then, project data analysis to identify key factors that affect I/D project performance was performed. In conclusion, five significant factors for project time performance and six significant factors for project cost perfornace were identified and summarized.

Detecting Red-Flag Bidding Patterns in Low-Bid Procurement for Highway Projects with Pattern Mining

  • Le, Chau;Nguyen, Trang;Le, Tuyen
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.11-17
    • /
    • 2022
  • Design-bid-build (DBB) is the most common project delivery method among highway projects. State Highway Agencies (SHAs) usually apply a low-bid approach to select contractors for their DBB projects. In this approach, the Federal Highway Agency suggests SHAs heighten contractors' competition to lower bid prices. However, these attempts may become ineffective due to collusive bidding arrangements among certain contractors. One common strategy is the rotation of winning bidders of a group of contractors who bid on many of the same projects. These arrangements may also be specific to a particular region or vary in time. Despite the practices' adverse effects on bidding outcomes, an effective model to detect red-flag bidding patterns is lacking. This study fills the gap by proposing a novel framework that utilizes pattern mining techniques and statistical tests for unusual pattern detection. A case study with historical data from an SHA is conducted to illustrate the proposed framework.

  • PDF

Statistical Analysis about Characteristics of Tunnel Portal Slopes on the National Highway in Korea (국내 일반국도 터널 갱구사면 특성 통계 분석)

  • Kwon, O-Il;Baek, Yong;Koo, Ho-Bon;Bae, Gyu-Jin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.745-750
    • /
    • 2005
  • The demand of tunnels has been increased for the linear improvement of general national highway, and road construction and/or enlargement in Korea. Also, the collapses of tunnel portal slope have been increased in recent due to heavy rain caused by global warming. Therefore, it has been risen the requirement of system for the stability of tunnel portal slope in Korea as well as all over the world. The objective of this research is to develop an effective maintenance system for supervising the tunnel portal slope. This paper is a basic proposal to execute a survey on the current status and state of the tunnel portal slopes that were already installed along general national highways.

  • PDF

Exploring Long-Term Performance in Design-Build Best-Value Evaluation Criteria

  • Calahorra-Jimenez, Maria;Poore, Tanner
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.74-82
    • /
    • 2022
  • Improving long-term performance in highway projects is an imperative goal for public administrations. Project delivery and procurement methods might provide an opportunity to align design and construction processes with this goal. Previous studies have explored whether project delivery methods impact the long-term performance of highway projects. However, these studies did not focus specifically on how core elements within the procurement might relate to long-term performance. Thus, this research aims to fill this gap by exploring to what extent and how long-term evaluation criteria are considered in design-build best-value procurement of highway projects. To this end, content analysis was conducted on 100 projects procured between 2009 and 2019 by 19 DOTs across the U.S. The analysis of 365 evaluation criteria found that (1) roughly 11% of them related to long-term performance. (2) The weight given to these criteria in the overall technical proposal was lower than 30%. (3) Sixty-five percent (65%) of long-term evaluation criteria focused on design while 15% related to materials and technology, respectively. The results of this study are a first steppingstone to initiate a deep exploration of the relationship between procurement practices and actual project performance. Currently, with sustainability and life cycle assessments being top concerns in infrastructure projects, this line of research might be of particular interest to DOTs and highway agencies across the U.S. and worldwide.

  • PDF

A methodology for an effective utilization of construction equipment for highway construction projects (도로공사 공정계획을 위한 공정 로직 및 건설장비 효율화 방안)

  • Song, Hojeong;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.26-34
    • /
    • 2014
  • Highway construction is a combination of linear, repetitive, and highly equipment intensive operations. Various types of construction equipment are deployed to ensure undisrupted performance of construction, and thus productivity improvement and cost-saving can be achieved through well-thought-out planning. The selection of construction equipment is dependent upon construction sequence, site conditions, and construction methods. In the process of planning, management should consider various types of construction methods per each type of construction operation. Also, management should map out proper construction equipment operation plan that takes the construction duration and cost measures into consideration. However, limited availability of historic data from the similar types of operations has been a stumbling block to proper construction planning, making the operations performed based upon experience and intuition guided by rules-of-thumb. As a consequence, the planing phase rarely provided an adequate validity in the implementation phase. The researchers developed a process logic for each construction type that management can utilize from early phase of highway construction planning process. Moreover, derived the construction equipment combination optimized for efficiency by using the process simulation technique. The developed method is expected to be useful for the decision-making process that aims to evaluate efficiency of various process plans and to ensure optimal selection of construction equipment for highway construction projects.

Development of Evaluation Factor of Certification System for Korean Green Road -Focused on Design/Construction Stage of Expressway and National Highway- (한국형 녹색도로인증시스템 평가요소 개발 - 고속도로 및 국도 건설단계 중심 -)

  • Park, Jae-Woo;Lee, Du-Heon;Koo, Jai-Dong;Noh, Kwan-Sub
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.16-25
    • /
    • 2014
  • Recent national policy agenda of 'Low-Carbon Green Growth' has been implemented as the important vision of the country. The government has set a target of entering the seven major world powers of Green Nation at 2020, and five major world powers at 2050. In order to achieve the goal, the reduction of greenhouse gases and the composition of green land and transportation has been promoted as an important policy. In a construction industry sector, policies and technologies for reducing greenhouse gas emissions and energy have been actively developed. In the case of developed countries, research for green road infrastructure has been conducted, which is the basis for certification system of green highway. This paper benchmarks the policies and cases of developed countries, verifies the applicability in the domestic road sector, and suggests the introduction of the certification system of green highway.

A Cost Estimation Model for Highway Projects in Korea

  • Kim, Soo-Yong;Kim, Young-Mok;Luu, Truong-Van
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.922-925
    • /
    • 2008
  • Many highway projects are under way in Korea. However, owners frequently find that the project cost exceeds the budget and they are unable to identify the underlining reasons. The main purpose of this research is to develop cost models for transportation projects in Korea using the multiple linear regression (MLR). The data consist of 27 completed transportation projects, built from 1991 to 2001, The technique of multiple regression analysis is used to develop the parametric cost estimating model for total budget cost per highway square meter (TBC/$m^2$). Findings of the study indicated that MLR car be applied to highway projects in Korea. There are twf) major contributions of this research. (1) the identification of transportation parameters as a significant cost driver for transportation costs and (2) the successful development of the parametric cost estimating models for transportation projects in Korea.

  • PDF

INCORPORATION OF TOTAL TIME MANAGEMENT INTO HIGHWAY PROJECT TIME MANAGEMENT SYSTEM

  • Yuan Jianbo;Liu Weijun;Zhang Jianren
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.796-801
    • /
    • 2005
  • Time management is one of the critical tasks in project management. Based on the theories of total quality management, this authors presented a project time management method, total time management (TTM), so as to facilitate highway project time management. This paper discussed the four fundamental characteristics of TTM: total factors management, staff management, project life cycle management, and Plan-Do-Check-Action (PDCA) cycle management. Now, most managers use computer software to manage the project. In order to make the theory of TTM more executable, the authors develop a project time management system suitable for TTM. This paper presents this time management system's analysis processes including system requirement, key functions etc..

  • PDF

Current Practices of Collecting and Utilizing Daily Work Report Data and Areas for Improvements

  • Shrestha, K. Joseph;Jeong, H. David;Gransberg, Douglas D.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.205-209
    • /
    • 2015
  • A significant amount of data including ongoing construction activities, work quantities, resources utilized by contractors, and site conditions is collected in highway construction sites on a daily basis by resident engineers. This data is commonly known as daily work reports (DWRs) in the U.S. Although a lot of time and effort is invested in collecting the DWR data, its utilization has been very limited. This paper discusses current practices of collecting and utilizing DWR data among various Departments of Transportation in the U.S., and discusses the challenges and opportunities for better collection and utilization of the data. An extensive literature review and two nationwide surveys in the U.S. were conducted as a part of this study. Finally, it provides a set of recommendations to effectively address the challenges identified and maximize the benefits of utilizing DWR data such as supporting various decisions for highway project development process. The findings of this study are implementable ideas that can aid DOTs in making data-driven decisions throughout the project development processes in the future.