Implementing an Application Tool of Life Cycle Cost Analysis (LCCA) for Highway Maintenance and Rehabilitation in California, USA

  • Kim, Changmo;Lee, Eul-Bum
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.376-380
    • /
    • 2015
  • Life-Cycle Cost Analysis (LCCA) for highway projects is known as an effective analytical technique that uses economic principles to evaluate long-term alternative investment options, especially for comparing the values of alternative pavement design structures and construction strategies. In the Unites States, the 2012 Moving Ahead for Progress in the 21st Century Act (MAP-21) amended the United States Code to mandate that the United States Government Accountability Office (GOA) conducts a study of the best practices for calculating life-cycle costs and benefits for the federally funded highway projects in 2013. The RealCost 2.5CA program was developed and adapted as an official LCCA tool to comply with regulatory requirements for California state highway projects in 2013. Utilization of this California-customized LCCA software helps Caltrans to achieve substantial economic benefits (agency cost and road user cost savings) for highway projects. Proper implementation of LCCA for roadway construction and rehabilitation would deliver noticeable savings of agency's roadway maintenance cost especially in developing counties where financial difficulties exist.

  • PDF

Cost and Schedule Analysis of Highway Projects based on Project Types

  • Shrestha, Bandana;Shrestha, Pramen P.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.50-56
    • /
    • 2022
  • Change Orders generally impact cost and schedule performance of highway projects. However, highway projects that do not have any change orders also face cost growth and schedule delays. This study seeks to determine the cost and schedule performance of Texas DOT projects by collecting project data for 120 highway projects completed between 2016 to 2020. For the study, we selected project data that has zero or negative change orders which were then grouped and analyzed based on their Project Types i.e., maintenance works; structural works; restoration and rehabilitation works; and safety works. The study found that performance of Maintenance and Safety type projects had less cost and schedule growth among the data analyzed. Statistical tests also found that even though the projects have no change orders, Rehabilitation and Restoration type projects experienced significant schedule growth compared to others. However, the data did not show any significant cost and schedule growth for the projects when statistical tests were performed on overall data. The study concluded that highway projects are experiencing schedule growth even though the projects had no change orders. Results from the study can help planners, engineers, and administrators to gain better insight on how different types of highway projects are performing in terms of cost and schedule and eventually derive appropriate solutions to minimize cost and schedule growth in such projects.

  • PDF

Construction stage analysis of Kömürhan Highway Bridge using time dependent material properties

  • Altunisik, Ahmet Can;Bayraktar, Alemdar;Sevim, Baris;Adanur, Suleyman;Domanic, Arman
    • Structural Engineering and Mechanics
    • /
    • v.36 no.2
    • /
    • pp.207-223
    • /
    • 2010
  • The aim of this study concerns with the construction stage analysis of highway bridges constructed with balanced cantilever method using time dependent material properties. K$\ddot{o}$m$\ddot{u}$rhan Highway Bridge constructed with balanced cantilever method and located on the 51st km of Elazi$\check{g}$-Malatya, Turkey, highway over Firat River is selected as an application. Finite element models of the bridge are modelled using SAP2000 program. Geometric nonlinearity is taken into consideration in the analysis using P-Delta plus large displacement criterion. The time dependent material strength variations and geometric variations are included in the analysis. Elasticity modulus, creep and shrinkage are computed for different stages of the construction process. The structural behaviour of the bridge at different construction stages has been examined. Two different finite element analyses with and without construction stages are carried out and results are compared with each other. As analyses result, variation of internal forces such as bending moment, axial forces and shear forces for bridge deck and column are given with detail. It is seen that construction stage analysis has remarkable effect on the structural behaviour of the bridge.

Assessing Contractor Competition in Competitive Bidding for Highway Construction Projects Using Network Analysis

  • Le, Chau;Arya, Minakshi;Moriyani, Muhammad Ali;Le, Tuyen
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.18-24
    • /
    • 2022
  • State highway agencies (SHAs) typically apply a competitive procurement procedure to select contractors for their design-bid-build projects. Since the level of competition affects construction bid prices and project outcomes, the Federal Highway Agency (FHWA) suggests SHAs seek ways to improve competition among contractors continuously. However, they rarely conduct an empirical assessment of the current competition level necessary to identify room for improvement. Besides the number of bidders on a project, other factors such as winning or losing rates among the contractors in previous projects can also indicate the degree of competition; only a few contractors may have won the majority of the projects in a specific region. However, few studies have investigated such factors. This paper proposes a network analysis-based approach to evaluating contractor competition levels of highway projects using historical bid tabulation data. The proposed method provides insights into overall competition levels, the determination of competitive contractors, and winning rate distribution among contractors.

  • PDF

AN ASSET MANAGEMENT ASSESSMENT MODEL FOR STATE DOTs

  • Steven Cooksey;Hyung Seok David Jeong;Myung-Jin Chae
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.380-387
    • /
    • 2009
  • In the past, many state Departments of Transportation (DOTs) in the U.S. managed their highway assets on a "worst first" basis and planned their highway projects in a tactical rather than strategic fashion. Due to increasingly tight highway budgets and recognition of long term benefits of asset management systems, the Federal Highway Administration (FHWA) has strongly pushed and encouraged state DOTs to implement asset management for managing their highway assets and highway projects. Currently, many DOTs have actively implemented and are in the process of applying this asset management concept for their highway infrastructure. However, different DOTs are developing different asset management systems because of their different organizational structures, data management structures, relationship with the legislature, and investment priorities. This study first identifies asset management indicators which are essential to successfully implementing asset management systems for State highway assets. The research team conducted a survey of asset management experts and reviewed the practices and policies of leading DOTs in asset management. Based on these indicators, this study develops an Asset Management Assessment Model (AM2) for different asset management systems. This model can be used by different DOTs to evaluate their current asset management systems and identify their strong areas and also their weak areas to improve in order to fully benefit from the advanced concept of asset management.

  • PDF

The Measurement of Road Alignment Using GPS-IMU System (GPS-IMU 통합 시스템을 이용한 도로기하구조 측정에 관한 연구)

  • Park, Jae-Hong;Yun, Duk-Geun;Sung, Jung-Gon;Lee, Jun-Seok
    • Journal of Korean Society of Transportation
    • /
    • v.30 no.5
    • /
    • pp.61-69
    • /
    • 2012
  • It is important for highway maintenance and safety assessment to get the accurate highway geometric information. However, it is difficult to acquire good highway geometric information due to missing blueprints or deteriorated highway sections. This research, to get highway geometric information rapidly, has developed a highway geometric analysis algorithm that uses data from vehicles with GPS-IMU integrated system. In conclusion, the result shows that 3.38% of error-ratio for the horizontal alignment and 0.083 absolute value difference for vertical grade comparing with highway drawings. Therefore, the result suggest that the developed method can be applied to the road safety inspection or road safety audit.

Present States of Geosynthetics used in the Highway Construction (고속도로 건설에 사용되는 토목섬유 현황과 개선사항 고찰)

  • 조성민;이학구;김경석
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.11c
    • /
    • pp.157-168
    • /
    • 1999
  • Geosynthetics are commonly used for filtering, layer separations, drainages, cutoffs, and reinforcements. In highway constructions, geotextile mats have been used for the purposes of vehicle trafficability, separations and embankment reinforcements. Geosynthetics are utilized as prefabricated vertical drains and also used as horizontal drainage layers substituted for the sand mat. Geogrids, essential element of reinforced retaining walls, are sometimes spread under the highway pavement. Besides various usage mentioned above, many type of them are also used as drainage of backfill in culverts and bridge abutments. In this paper, problems of specifications and regulations concerning mostly used geotextiles are specifically dealt with from the practical aspects of field engineering and efforts are given upon improvement of them. Especially, relevant sections of "Standard Specifications for the Highway Construction by Korea Highway Corporation"are being revised and these are introduced in detail.

  • PDF

Introduction of PCC Pavement Sections and Associated Research in KHC Test Road

  • Kim, Ji-Won;Kwon, Soon-Min;Lee, Jae-Hoon;Kim, Do-Wan
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2003.05a
    • /
    • pp.197-203
    • /
    • 2003
  • Korea Highway Corporation(KHC) began the ambitious KHC Test Road construction project from 1997. It is 7.7km long two-lane highway next to the mainline of Jungbu Inland Expressway. The KHC Test Road construction was completed at the December 2002. It is composed of twenty-five PCC test pavement sections. Section design parameters are (1) concrete slab thickness, (2) base type, (3) base thickness (12, 15, and 18cm), and (4) pavement type. Twenty-five PCC test pavement sections contain 1241 sensors to evaluate the behavior of pavement system under traffic load and environmental change. The behavior of pavement systems will be identified by the observation of sensor measurement and pavement distress survey from test pavement sections. The Test Road research outcome will validate the Korean Pavement Design Guide which is develop by on-going funded research from the Ministry of Construction and Transportation.

  • PDF

ESG-oriented Governance Work System for Smart Highway Implementation

  • Bong-Shik, Yun;So-Wol, Yoo
    • Smart Media Journal
    • /
    • v.11 no.10
    • /
    • pp.36-45
    • /
    • 2022
  • This study was promoted to prepare an ESG-oriented work system for Korea Expressway Corporation through sustainable highway construction, IOT-based smart highway preparation, and establishment of a broad convergence business governance system between multiple ministries and implementing entities. Based on the 2nd Basic Plan for Landscape Policy (2020~2024) and the Public Design Promotion Act (2018~2022), the study was conducted through the improvement of the highway design method to be applied for four years from 2021 to 2024, the changes in construction and social conditions related to expressways, the analysis of policies and plans to secure consistency with the 'Korean New Deal', and the analysis of the project performance and work promotion system that the Korea Expressway Corporation's business execution organization has promoted together with each government department. The results of this research are expected to help the Korea Expressway Corporation establish the 21st Innovation Plan for the phased construction of a "100-years landscape with people" and the preparation of a sustainable future highway environment creation project for the lives and safety of the people.

The Prospects of Highway Road in Consideration of Natural Environment (친환경 고속도로의 건설 방향)

  • Jeon, Gi-Seong;Kim, Tae-Su
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.3 no.3
    • /
    • pp.105-112
    • /
    • 2000
  • For the purpose of building up the construction prospects of highway in consideration of natural environment. The tree planting and flower seeding in highway road side using native species were offered to natural landscape and resting area landscaping for peoples, and these area were 194place. The tree planting and flower seeding activity is to improve driving circumstances, and to conserve living and natural environment along the highways. And, preparation of ecotone and biotope at the highway surroundings for natural ecosystem conservation is an important activity, and planting of natural plants is generally carried out near wildlife ecoroads in order to give the way for animals. The primary purpose of this tree planting and seeding is not only to reduce environmental pollution, but also to enhance the ecological surroundings of highway circumference. Ultimately, It is essential that the constructive method of highway think over such as ecological environment and road design, surveying and management, construction, highway maintenance etc.

  • PDF