• Title/Summary/Keyword: Highway construction

Search Result 865, Processing Time 0.023 seconds

Heat Transfer Analysis for Asphalt Mixture Temperature Variation due to Wind Speed (풍속에 따른 포설 아스팔트 혼합물의 온도변화에 대한 열전달 해석)

  • Yun, Tae Young;Yoo, Pyeong Jun
    • International Journal of Highway Engineering
    • /
    • v.17 no.4
    • /
    • pp.33-40
    • /
    • 2015
  • PURPOSES: Evaluation of the wind speed effect on the temperature drop of an asphalt mixture during construction, by using the transient heat transfer theory and dominant convective heat transfer coefficient model. METHODS: Finite difference method (FDM) is used to solve the transient heat transfer difference equation numerically for various wind speeds and initial temperature conditions. The Blasius convective heat transfer coefficient model is adapted to account for the effect of wind speed in the temperature predictions of the asphalt mixture, and the Beaufort number is used to select a reasonable wind speed for the analysis. As a function of time and depth, the temperature of the pavement structure is predicted and analyzed for the given initial conditions. RESULTS : The effect of wind speed on the temperature drop of asphalt mixture is found to be significant. It seems that wind speed is another parameter to be accounted for in the construction specifications for obtaining a better quality of the asphalt mixture. CONCLUSIONS: It is concluded that wind speed has a significant effect on the temperature drop of the asphalt layer. Although additional field observations have to be made to reflect the effect of wind speed on the construction specifications, it appears that wind speed is a dominant variable to be considered, in addition to the atmospheric temperature.

EVALUATION OF COST-TIME RELATIONSHIPS FOR CONTRACTORS PARTICIPATING IN COST-PLUS-TIME BIDDING

  • Saeed Abdollahi Sean Pour;Hyung Seok David Jeong
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.479-487
    • /
    • 2013
  • State Highway Agencies (SHAs) have started utilizing cost-plus-time bidding (A+B bidding) since Federal Highway Agency (FHWA) declared it operational on May 4, 1995. Although this technique has successfully accelerated many projects by incorporating construction time in the bidding competition, a framework to illustrate the interactions of incentive/disincentive (I/D) rates on the competitiveness of contractors participating in the bid competition is yet to be developed. In a previous research, authors indicated that for each bid competition there is an efficient cap for I/D rates which are dictated by the capabilities of contractors in project acceleration. However, the results of previous study were based on the assumption that there is a statistically significant relationship between cost and time. In this study, the entire cost-plus-time projects implemented by the Oklahoma Department of Transportation (ODOT) were investigated. Then the significance of relationship between cost and time were analyzed for each contractor utilizing Analysis of Variance (ANOVA) technique, and the price-time function of each contractor was determined by regression analysis. The results of the analysis indicate that there is a significant relationship between cost and time for the majority of contractors. However, a quadratic relationship is not always significant and for some contractors a linear price-time relationship is significant. The results of this project can be used not only by ODOT to optimize the incentive/disincentive rates but also by contractors to determine the most competitive strategies of other bid participants.

  • PDF

Development of Tunnel Asset Management (TAM) Program

  • Hamed Zamenian;Dae-Hyun (Dan) Koo
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.576-582
    • /
    • 2013
  • Typical highway infrastructure systems include roadway pavement, drainage systems, tunneling, and other hardware components such as guardrails, traffic signs, and lighting. Tunnels in a highway system have provided significant advantages to overcoming various natural challenges including crossing underneath bodies of water or through mountainous areas. While only a few tunnel failure cases have been reported, the failure rate is likely to increase as these assets age and because agencies have not emphasized tunneling asset management. A tunnel system undergoes a deterioration life cycle pattern that is similar to other infrastructure systems. There are very few agencies in the United States implementing comprehensive tunnel asset management programs. While current tunnel asset management programs focus on inspection, maintenance, and operation safety, there is an increasing need for the development of a comprehensive life cycle tunnel asset management program. This paper describes a conceptual framework for a comprehensive tunnel asset management program. The framework consists of three basic phases including a strategic plan, a tactical plan, and an operational plan to provide better information to the decision makers. The strategic plan is a basic long term approach of tunnel asset management. The tactical plan determines specific objectives and the operational plan actually applies asset management objectives in practice. The information includes operational condition, structural condition, efficiency of the system, emergency response, and life cycle cost analysis for tunnel capital improvement project planning.

  • PDF

Settlement Behavior of Geogrid Reinforced Railroadbed (지오그리드로 보강된 철도노반의 침하 거동)

  • 신은철;김두환;김남현
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.407-414
    • /
    • 2000
  • Recently the geogrids are being used in some large projects such as Inchon International Airport construction, highway construction, and Korean High-Speed Railway construction with not only the merit of simple construction but also reinforcing efficiency for the soft ground. Main function of roadbed is to provide a stable foundation in terms of bearing capacity and settlement for the subballast and ballsat layers. Differential settlement of the railroad should be avoided. The cyclic laboratory model tests were performed to investigate the settlement behavior of geogrid reinforced railroadbed. The ratio of settlement of roadbed under cyclic loading with three layers of geogrid reinforced is less than 1/2 of the roadbed thickness without reinforcement.

  • PDF

A Study On Context Sensitive Highway Design Based On Improved Operating Speed Prediction Methods in National Roads (환경 친화적 도로 설계를 위한 기초 연구 (노선대 지형 및 지역 요소를 고려한 일반국도 주행속도 예측 모형))

  • Kim, Sang-Youp;Choi, Jai-Sung
    • Journal of Korean Society of Transportation
    • /
    • v.23 no.7 s.85
    • /
    • pp.17-33
    • /
    • 2005
  • Highway design speed is a very important design element which determines highway design level. When determining highway design speed, one would estimate it utilizing the most likelihood of design speed and vehicle operating speed relationship. Existing operating speed prediction models only include highway geometric characteristics and their impacts on speed, which usually can not consider the impact of highway design speed on surrounding roadway environment and land use pattern. If this happens, excessive highway construction cost and huge environmental impact can occur. In this research project, a new vehicle operating speed prediction model was developed which can reflect the effect of surrounding roadway environment into vehicle speed prediction. The followings are the research findings : Firstly, highway terrain types and land use pattern on national roads were classified and integrated into drivers' visual recognition pattern. This was performed using a data management software. Secondly, the developed highway terrain types and land use pattern were related to vehicle speeds and it was found that there were significant statistical differences among vehicle speed for each different terrain and land use pattern. Thirdly. the General Linear Model analysis was employed to analyze the effects of highway geometric features, terrain types, and land use patterns. For two-lane highway and four-lane highway tested in this research project, it was found that R squares were 0.67 and 0.85, respectively. Additionally an optimal highway design speed range table, based on this research project. was proposed for practical use. This table can be reliably used on South Korean national road design, but discretion is required for applying this table to other types of highways including provincial roads and municipal roads.

Development of Alignment Information Extraction System on Highway by Terrestrial Laser Scanning Technique (지상 레이저 스캐닝 기법에 의한 도로선형정보 추출 시스템 개발)

  • Kim, Jin-Soo
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.10 no.4
    • /
    • pp.97-110
    • /
    • 2007
  • A laser scanning technique has been attracting much attention as a new technology to acquire location information. This technique might be applicable to a wide range of areas, most notably in geomatics, due to its high accuracy of location and automation of high-density data acquisition. A alignment information extraction system on highway has been developed in this study by utilizing the advantages of the laser scanning technique. The system can accurately interpret the alignment information of highway and can be applied to actual works. To develop the alignment information extraction system on highway, an algorithm that can automatically separate a horizontal alignment into a straight line, a transition curve, and a circular curve was developed. It can increase its efficiency compared to the conventional methods. In addition, an algorithm that can automatically extract design elements of horizontal and vertical alignments of highway was developed and applied to an object highway. This yielded higher practicality with more accurate values compared to those from previous studies on the extraction of design elements of highway alignment. Furthermore, the extracted design elements were used to perform a virtual driving simulation on the object highway. Through this, data were provided for a visual judgment for judging visually whether the topography and structures were harmonized in a three-dimensional manner or not. The study also presents data that can serve as a basis to determine highway surface freezing sections and to analyze three-dimensional sight distance models. Through the establishment of a systematic database for diverse data on highway and the development of web-based operating programs, an efficient highway maintenance can be ensured and also they can provide important information to be used when estimating a highway safety in the future.

  • PDF

Key Exchange Protocol based on Signcryption in SMART Highway (SMART Highway 환경에서의 사인크립션 기반 키 교환 프로토콜)

  • Kim, Su-Hyun;Lee, Im-Yeong
    • Journal of Korea Multimedia Society
    • /
    • v.16 no.2
    • /
    • pp.180-189
    • /
    • 2013
  • The SMART Highway project combines road construction with advanced technology and vehicle telecommunications. Its expected outcome is a world-leading intelligent road that is green, fast, and comfortable. A vehicular ad-hoc network(VANET) is the core technology of the SMART Highway, whose transport operation is based on road vehicles. The VANET is a next-generation networking technology that enables wireless communication between vehicles or between vehicles and a road side unit(RSU). In the VANET system, a vehicle accident is likely to cause a serious disaster. Therefore, some information on safety is essential to serve as the key exchange protocol for communication between vehicles. However, the key exchange scheme of the general network proposed for a fast-moving communication environment is unsuitable for vehicles. In this paper, communication between multiple vehicles more efficient and secure key exchange at the vehicle certification by signcryption is proposed.

Distribution and Characteristics of Native and Exotic Plants on Cut Slopes and Rest Areas along Korean Highway Lines

  • Kim, Kee-Dae
    • Journal of Environmental Science International
    • /
    • v.16 no.5
    • /
    • pp.549-559
    • /
    • 2007
  • Vegetation surveys were performed at 45 plots along 10 highways cut slopes in South Korea. Total floral inventory, species richness and exotic plant percentage were obtained within each plot. Life history and life form of each species appeared were analyzed. Community types were classified using hierarchical cluster analysis and detrended correspondence analysis and non-metric multidimensional scaling were conducted from vegetation matrix. 292 species of vascular plants were discovered and the number of natives and exotics were 226 and 66, respectively. There were no significant differences of species richness and exotic plant percentage between cut slopes and rest areas. Hierarchical cluster analysis indicated five clear vegetation associations in cut slopes and rest areas. Detrended correspondence analysis indicated that species composition of total and native plants were similar along the highway cut slopes whereas exotic plants were distributed differentially along the highway cut slopes. in non-metric multidimensional scaling, the studied sites were more separated from each other on the basis of their species composition than the results of detrended correspondence analysis with respect to total, native and exotic plants. The both ordination represented that exotic plants have not been made uniform yet on cut slopes and rest areas by highway corridor in spite of diverse chronosequences after highway construction termination (1 to 22 years). This study showed that the distribution of species composition in exotic plants was different and localized on cut slopes and rest areas of highway in this representative peninsula area of North East Asia and the invasion of exotic plants can retard the process of plant species homogenization.

Gyeongbu Highway: Political Economic Geography of Mobility and Demarcation (경부고속도로: 이동성과 구획화의 정치경제지리)

  • Choi, Byung-Doo
    • Journal of the Economic Geographical Society of Korea
    • /
    • v.13 no.3
    • /
    • pp.312-334
    • /
    • 2010
  • This paper examines the process of Gyeongbu Highway construction from the standpoint of political economy, which was pursued by President Park Jeong-Hee in the 1960s, focusing on the politics of mobility and demarcation implied in it. As results of examination, it can be argued that Gyeongbu Highway was seen as a powerful element to promote a socio-spatial integration of population and hence to enforce an authoritative political power of the Park regime through creation of mobility; that it has had an strong impact on changing the physical landscape of national space and the spatio-temporal rhythm of everyday life by extending the 'machine space' as a non-place; that it has provided a physical infrastructure on which the period of capital circulation could be reduced through its effect of space-time compression. But Gyeongbu Highway has led serious problems such as uneven regional development, expansion of non-place or alienated place, ecological destruction and pollution. In conclusion, a sustainable politics is suggested to overcome this kind of 'tragedy of highway' and to develop the highway as a true way of political and spatial balance and integration.

  • PDF

Effects of soil-structure interaction on construction stage analysis of highway bridges

  • Ates, Sevket;Atmaca, Barbaros;Yildirim, Erdal;Demiroz, Nurcan Asci
    • Computers and Concrete
    • /
    • v.12 no.2
    • /
    • pp.169-186
    • /
    • 2013
  • The aim of this paper is to determine the effect of soil-structure interaction and time dependent material properties on behavior of concrete box-girder highway bridges. Two different finite element analyses, one stage and construction stage, have been carried out on Komurhan Bridge between Elazi$\breve{g}$ and Malatya province of Turkey, over Fırat River. The one stage analysis assume that structure was built in a second and material properties of structure not change under different loads and site conditions during time. However, construction stage analysis considers that construction time and time dependent material properties. The main and side spans of bridge are 135 m and 76 m, respectively. The bridge had been constructed in 3 years between 1983 and 1986 by balanced cantilever construction method. The parameters of soil-structure interaction (SSI), time dependent material properties and construction method are taken into consideration in the construction stage analysis while SSI is single parameter taking into consideration in the one stage analysis. The 3D finite element model of bridge is created the commercial program of SAP2000. Time dependent material properties are elasticity modulus, creep and shrinkage for concrete and relaxation for steel. Soft, medium, and firm soils are selected for evaluating SSI in both analyses. The results of two different finite element analyses are compared with each other. It is seen that both construction stage and SSI have a remarkable effect on the structural behavior of the bridge.