• Title/Summary/Keyword: Highway assets

Search Result 8, Processing Time 0.019 seconds

AN ASSET MANAGEMENT ASSESSMENT MODEL FOR STATE DOTs

  • Steven Cooksey;Hyung Seok David Jeong;Myung-Jin Chae
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.380-387
    • /
    • 2009
  • In the past, many state Departments of Transportation (DOTs) in the U.S. managed their highway assets on a "worst first" basis and planned their highway projects in a tactical rather than strategic fashion. Due to increasingly tight highway budgets and recognition of long term benefits of asset management systems, the Federal Highway Administration (FHWA) has strongly pushed and encouraged state DOTs to implement asset management for managing their highway assets and highway projects. Currently, many DOTs have actively implemented and are in the process of applying this asset management concept for their highway infrastructure. However, different DOTs are developing different asset management systems because of their different organizational structures, data management structures, relationship with the legislature, and investment priorities. This study first identifies asset management indicators which are essential to successfully implementing asset management systems for State highway assets. The research team conducted a survey of asset management experts and reviewed the practices and policies of leading DOTs in asset management. Based on these indicators, this study develops an Asset Management Assessment Model (AM2) for different asset management systems. This model can be used by different DOTs to evaluate their current asset management systems and identify their strong areas and also their weak areas to improve in order to fully benefit from the advanced concept of asset management.

  • PDF

Evaluation of Road Asset Value using Alternative Depreciation methods : Focusing on National Highway No.1 (대체적 감가상각기법을 활용한 도로자산의 가치 평가 : 국도 1호선을 중심으로)

  • Do, Myungsik;Park, Sunghwan;Choi, Seunghyun
    • International Journal of Highway Engineering
    • /
    • v.19 no.3
    • /
    • pp.19-30
    • /
    • 2017
  • PURPOSES : This study proposes the road asset valuation approach using alternative depreciation methods. It has become necessary to have asset management system according to the adoption of accrual basis accounting for governmental financial reporting and the amendment of the road act. Therefore, it is very important to analyze the effect of depreciation methods on road asset value as a basic research for road asset management system. METHODS : The Ministry of Strategy and Finance (MOSF) has mainly performed road asset valuation based on Write down Replacement Cost and Straight Line depreciation method. This study suggests some appropriate asset valuation methods for road assets through case analysis using three depreciation methods: Consumption-based depreciation method, Condition-based depreciation method, and Straight Line depreciation method. A road asset valuation data of national highway route 1 (year 2014) is used to analyze the effect of three depreciation methods on the road asset value. Road assets include land and structures (pavement, bridge, and tunnel). This study mainly focuses on structures such as bridges and tunnels, because according to governmental accounting standards, land and road pavement assets do not depreciate. RESULTS : The main results of this study are as follows. Firstly, overall asset value of national highway route 1 was estimated at 6.97 trillion KRW when MOSF's method (straight-line depreciation method) is applied. Secondly, asset value was estimated at 4.85 trillion KRW on application of consumption-based depreciation method. Thirdly, asset value was estimated at 4.37 trillion KRW when condition-based depreciation method is applied. Therefore, either consumption-based or condition-based depreciation methods would be more appropriate than straight-line depreciation method if we can use the condition data of road assets including land that are available in real time. CONCLUSIONS : Since road assets such as pavements, bridges, and tunnels have various patterns of deterioration and condition monitoring period, it is necessary to consider a specific valuation method according to the condition of each road asset. Firstly, even though road pavements do not depreciate, asset valuation through condition-based depreciation method would be more appropriate when requirements for application of non-depreciation approach are not satisfied. Since bridge and tunnel facilities show various patterns of deterioration and condition monitoring period by type and condition level, consumption-based depreciation method based on deterioration model would be appropriate. Therefore, it is necessary to have a reasonable asset management system to apply condition-based depreciation method and a periodic condition investigation to manage road assets well.

Study about the Evaluation of Bridge Asset Valuation for Maintenance (유지관리를 위한 교량 시설물 자산 평가 방법에 대한 연구)

  • Lee, Dong Hyun;Kim, Joo Yeub;Ji, Seung-Gu;Lee, Sang Soon;Kim, Ji-won
    • International Journal of Highway Engineering
    • /
    • v.14 no.6
    • /
    • pp.13-23
    • /
    • 2012
  • PURPOSES : This study is to improve the highway management and rehabilitation efficiently by method for asset management. METHODS : Based on the literature review, The concept of this paper is to investigate the use of asset values from a Bridge management system to improvement of maintenance system more efficiently. This study is suggested for an evaluation method based on the current bridge condition by Written-down replacement cost of the assets. RESULTS : We suggests the optimization methodology of road asset valuation for budge distribution and performance measure. CONCLUSIONS : We evaluate all of national highway's bridge by the optimization methodology of road asset valuation, and suggest application methods of asset result.

Development of Level of Service System for Road Infrastructure Asset Management (도로시설물 자산관리를 위한 서비스수준체계 개발)

  • Han, Dae Seok;Yoo, In Kyoon;Lee, Su Hyung
    • International Journal of Highway Engineering
    • /
    • v.16 no.4
    • /
    • pp.75-86
    • /
    • 2014
  • PURPOSES: The aim of this paper is developing user-oriented flexible Level Of Service (LOS) system for integrated asset management of various road facilities. It is essential to overcome limitations of general management systems which only focus on a type of assets (e.g. pavement, bridge etc.), and to serve a customizable LOS platform for smooth implementation and future improvement of the LOS considering various managerial environments of road agencies. METHODS: This study suggested a total framework of the LOS system as a process for self-development, operation and improvement of LOS system to conduct the PDCA (Plan-Do-Check-Act) in management process. In the process, we adopted user-customizable elements regarding asset definition, service index and evaluation method to match with the managerial environment of road agencies. In addition, we conducted an empirical study on the entire process of the suggested LOS system with a real road agency (Korea Express Highway) to prove applicability of the LOS system. RESULTS: From the empirical study, we confirmed that the suggested LOS system framework were suitable for development of customized LOS system. In addition, evaluation of asset conditions by LOS ratings, and quantification of vision achievement of the Korea Express Highway were successfully made. It would be the first trial in integrated management approach with LOS systems for numerous road facilities. CONCLUSIONS : It was recognized that easy application and sustainable improvement of the LOS was the most critical point in asset management. The suggested LOS system would be a powerful weapon as a managerial tool in preparing tight budget, aging infrastructures, and increased demands for more accountability both in Korea and internationally. Implementation of the LOS system needs to be expanded to the other infrastructure members to serve satisfactory level of service to taxpayers.

A Study on Improvement of Level of Highway Maintenance Service Using Self-Organizing Map Neural Network (자기조직화 신경망을 이용한 고속도로 유지관리 서비스 등급 개선에 대한 연구)

  • Shin, Duksoon;Park, Sungbum
    • Journal of Information Technology Services
    • /
    • v.20 no.1
    • /
    • pp.81-92
    • /
    • 2021
  • As the degree of economic development of society increases, the maintenance issues on the existing social overhead capital becomes essential. Accordingly, the adaptation of the concept of Level of service in highway maintenance is indispensable. It is also crucial to manage and perform the service level such as road assets to provide universal services to users. In this regards, the purpose of this study is to improve the maintenance service rating model and to focus on the assessment items and weights among the improvements. Particularly, in determining weights, an Analytic Hierarchy Process (AHP) is performed based on the survey response results. After then, this study conducts unsupervised neural network models such as Self-Organizing Map (SOM) and Davies-Bouldin (DB) Index to divide proper sub-groups and determine priorities. This paper identifies similar cases by grouping the results of the responses based on the similarity of the survey responses. This can effectively support decision making in general situations where many evaluation factors need to be considered at once, resulting in reasonable policy decisions. It is the process of using advanced technology to find optimized management methods for maintenance.

Comparing the Operation Cost of Washington Safety Rest Areas with Other States Using Performance-Based Method

  • Shrestha, Kishor;Berg, Alix;Tafazzoli, Mohammadsoroush;Kisi, Krishna
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.640-648
    • /
    • 2022
  • In the United States, the Safety Rest Areas (SRAs) were introduced as highway roadside infrastructures in the early 1900s. The State Departments of Transportation (DOTs) operate/maintain their SRAs using different methods. The Washington DOT used the in-house workforce method for over 20 years, whereas some states moved to Performance-Based Contracting (PBC) from the in-house workforce to save cost primarily. Several existing studies claimed that using the PBC approach saved costs on several highway assets. Thus, the principal objective of this study is to compute and compare the unit operating/maintenance cost of SRAs using the in-house workforce method (in Washington state) with the PBC approach (in other states). The findings of this study show that the average annual cost using the PBC approach was much more than the average annual cost using the in-house workforce approach. The findings also show that in Washington state, the 'Labor Cost' category was a key expenditure, which is statistically higher than other categories. The 'Labor Cost' was followed by the 'Other Services', and then 'Materials and Supplies' and 'Equipment.' The study's findings indicated that outsourcing does not always save costs for agencies. The study findings may help transportation construction/maintenance professionals select a cost-effective approach for their future planning.

  • PDF

Development of Tunnel Asset Management (TAM) Program

  • Hamed Zamenian;Dae-Hyun (Dan) Koo
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.576-582
    • /
    • 2013
  • Typical highway infrastructure systems include roadway pavement, drainage systems, tunneling, and other hardware components such as guardrails, traffic signs, and lighting. Tunnels in a highway system have provided significant advantages to overcoming various natural challenges including crossing underneath bodies of water or through mountainous areas. While only a few tunnel failure cases have been reported, the failure rate is likely to increase as these assets age and because agencies have not emphasized tunneling asset management. A tunnel system undergoes a deterioration life cycle pattern that is similar to other infrastructure systems. There are very few agencies in the United States implementing comprehensive tunnel asset management programs. While current tunnel asset management programs focus on inspection, maintenance, and operation safety, there is an increasing need for the development of a comprehensive life cycle tunnel asset management program. This paper describes a conceptual framework for a comprehensive tunnel asset management program. The framework consists of three basic phases including a strategic plan, a tactical plan, and an operational plan to provide better information to the decision makers. The strategic plan is a basic long term approach of tunnel asset management. The tactical plan determines specific objectives and the operational plan actually applies asset management objectives in practice. The information includes operational condition, structural condition, efficiency of the system, emergency response, and life cycle cost analysis for tunnel capital improvement project planning.

  • PDF

Asset Evaluation Method for Road Pavement Considering Life Cycle Cost (생애주기비용을 고려한 도로포장의 자산가치 평가에 대한 연구)

  • Do, Myungsik;Kim, Jeunghwan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.1D
    • /
    • pp.63-72
    • /
    • 2009
  • This study aims at establishing the decision-making support system for the highway assets, long-term performance presumption and evaluation of asset value, which are appropriate for Korea, and proposing the methods of the optimal engineering method and the timing decision for the preventive maintenance through the project evaluation, the optimization method and life-cycle analysis related to the highways. In order to supplement the current problem of the near-sighted budget management system, which chooses the maintenance place of the highway, depending on the level of the budget with fixed amount, the long-term required budget prediction system and the economy principle were introduced, so that the pavement agency can predict the level of the required budget, and it was aimed to develop the pavement asset evaluation system to maintain the performance of the highway with the minimum of the cost. In the use of the highway pavement asset evaluation system, to maintain the appropriate level of the pavement evaluation index, when the budget was efficiently established in the reference of the required maintenance budget for the chosen section of the highway in the year concerned, it was possible to analyze the most rational pavement maintenance budget. With this result, it is estimated to prevent the unnecessary waste of budget in advance, and through the development of the decision-making system for the long-term performance presumption and the asset value estimation of the pavement, it is expected to able to analyze the previous evaluation of the project related to the highway and the feasibility of introduction.