• Title/Summary/Keyword: Highrise Building

Search Result 44, Processing Time 0.023 seconds

Differential Column Shortening of Plaza zrakyat Office Tower Including Inelastic Effect (비산성효과를 고려한 Plaza Rakyat 오피스동의 기둥부등축소량)

  • 송화철;유은종;정석창;주영규;안재현;박칠림
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1997.10a
    • /
    • pp.475-480
    • /
    • 1997
  • Highrise concrete buildings are very sensitive to cumulative and differential shortening of their vertical element such as wall and columns. Inelastic deformation due to creep and shrinkage consist of various factors and load history af actual building is very complicated. Therefore, for the accurate prediction and compensation of axial shortening, special efforts in design and construction phase are required to ensure long-term serviceability and strength requirement. In this paper, axial shortening estimation and compensation procedure is presented, which utilized experimentally determined concrete properties and preliminary load history and computerized approach, in case of Plaza Rakyat office tower, 79-story reinforced concrete building under construction in Malaysia.

  • PDF

Foundation Design the 151 story Incheon Tower in Reclamation Area

  • Abdelrazaq, Ahmad;Badelow, Frances;Kim, Sung-Ho;Park, Yung-Ho
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.157-171
    • /
    • 2009
  • A 151 storey super high-rise building located in an area of reclaimed land constructed over soft marine clay in Songdo, Korea is currently under design. This paper describes the design process of the foundation system of the supertall tower, which is required to support the large building vertical and lateral loads and to restrain the horizontal displacement due to wind and seismic forces. The behaviour of the foundation system due to these loads and foundation stiffness influence the design of the building super structure, displacement of the tower, as well as the raft foundation design. Therefore, the design takes in account the interactions between soil, foundation and super structure, so as to achieve a safe and efficient building performance. The site lies entirely within an area of reclamation underlain by up to 20m of soft to firm marine silty clay, which overlies residual soil and a profile of weathered rock. The nature of the foundation rock materials are highly complex and are interpreted as possible roof pendant metamorphic rocks, which within about 50m from the surface have been affected by weathering which has reduced their strength. The presence of closely spaced joints, sheared and crushed zones within the rock has resulted in deeper areas of weathering of over 80m present within the building footprint. The foundation design process described includes the initial stages of geotechnical site characterization using the results of investigation boreholes and geotechnical parameter selection, and a series of detailed two- and three-dimensional numerical analysis for the Tower foundation comprising over 172 bored piles of varying length. The effect of the overall foundation stiffness and rotation under wind and seismic load is also discussed since the foundation rotation has a direct impact on the overall displacement of the tower.

  • PDF

Impact Sound Insulation Characteristics of Floors according to the number of P'yong and Layers (초고층 공동주택의 평수와 층수에 따른 바닥충격음 차음 특성)

  • Lee, Sang-Woo
    • KIEAE Journal
    • /
    • v.4 no.3
    • /
    • pp.71-78
    • /
    • 2004
  • Apartment housing is a widely-spread type in Korean housing market. Nevertheless, it has caused serious problems such as traditional community corruption, unsafe structure, defects and litigation from noise. Noise, especially in concrete structure for apartment housing, is hardly controlled in proper to prevent sound transmission between upper and lower families with existing system. In foreign countries, there are floating floor system to enhance the noise control performance in multi-family housing. This study is to examine the impact sound insulation performance of floors according to the different P'yong and Layers by field measurement in highrise building.

Seisminc Response of Base Isolated Structures with MR Dampers (MR 감쇠기를 적용한 기초격리구조물의 지진응답)

  • 고봉준;황인호;이종세
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2003.09a
    • /
    • pp.505-512
    • /
    • 2003
  • As large structures such as highrise buildings and cable-stayed bridges become lighter and more flexible, the necessity of structural control for reducing excessive displacement and acceleration due to seismic excitation is increased. As a means to minimize seismic damages, various base isolation systems are adopted or considered for adoption. In this study, the seismic performance of M dampers are studied and compared with that of the NZ system as a base isolation system As the control algorithm of the MR damper, the clipped-optimal control(applied LQR method) is employed. A five-story building is modeled and the seismic performance of the two systems subjected to three different earthquakes is compared. The results show that the M damper system can provide superior protection than the NZ system for a wide range of ground motions.

  • PDF

ANALYSIS OF THE INFLUENCE OF WEATHER ON CONSTRUCTION PRODUCTIVITY RATE FOR SUPER-HIGHRISE BUILDING CONSTRUCTION FRAMEWORK

  • Jae-won Shin;Han-kook Ryu;Moon-seo Park;Hyun-soo Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1124-1128
    • /
    • 2005
  • The duration of a construction project is not only a key element for taking a new order, but also a strict yardstick to determine certain project successful or not. However, since construction project is basically outdoor job and most of the activities are proceeded out-air, no matter how the schedule plan has been established accurately, actual project proceeds due to the weather condition, beyond anyone's control. In this paper, the functional relationship between work productivity rate and weather elements is suggested by regression analysis. Difference of the relationship and influence of weather due to the seasonal group are also revealed. With these results, by simulating actual weather data and generating weather forecast through historical data, more accurate schedule would be obtained.

  • PDF

Optimal Compensation of Differential Column Shortening in Tall Buildings for Multi Column Groups (고층건물의 멀티 기둥그룹에 대한 부등기둥축소량의 최적보정기법)

  • Kim, Yeong-Min
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.21 no.2
    • /
    • pp.189-197
    • /
    • 2008
  • This study presents optimal compensation algorithm of differential column shortening for more than two column groups. The proposed algorithm produces the minimum story groups and their compensation thicknesses which satisfy constraint conditions on performance and construction and enables not only the relative compensation but also the mixed compensation considering absolute shortening. The simulated annealing algorithm is used as the main optimization technique. The applicability of the proposed algorithm was verified by applying it to the 61-storey building where compensation of differential column shortening had already been performed. Using, the proposed algorithm compensation was performed easily and the number of compensation was less than the field method.

Energy Saving Potentials of Dedicated Outdoor Air System in a High-rise Apartment Building (외기전담 시스템 기반 초고층 공동주택 중앙 환기시스템의 에너지 절감효과 분석)

  • Kim, Min-Hwi;Kim, Jin-Hyo;Kwon, Oh-Hyun;Jeong, Jae-Weon
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2009.11a
    • /
    • pp.291-296
    • /
    • 2009
  • This paper investigates the energy saving potentials of a dedicated outdoor air system (DOAS) applied to a highrise apartment building. As for a typical $132-m^2$ apartment unit, two different HVAC systems; centralized DOAS-Ceiling Radiant Cooling Panel and decentralized Energy Recovery Ventilator-Packaged Air Conditioner were installed. Transient behavior and control characteristics of each system were modeled numerically using a commercial equation solver program, and annual cooling coil load and heating load reduction potentials were compared. The research shows that DOAS-Ceiling Radiant Cooling Panel system can reduce the cooling coil load over 21% annually compared with the current Energy Recovery Ventilator-Packaged Air Conditioner pair. In addition, over 40% of annual ventilation heating load can be reduced by use of DOAS.

  • PDF

Shear Lag in Framed Tube Structures with Multiple Internal Tubes (복수의 내부 튜브를 가진 골조 튜브 구조물의 Shear Lag)

  • 이강건;이리형
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.13 no.3
    • /
    • pp.351-360
    • /
    • 2000
  • A simple numerical modelling technique is proposed for estimating the shear lag effects of framed-tube system with multiple internal tubes. The tube(s)-in-tube structure is analysed by using an analogy approach in which each tube is individually modelled by a beam that can accounts for the flexural and shear deformations, as well as the shear lag effects. The numerical analysis is based on the minimum potential energy principle in conjunction with the variational approach. The shear lag phenomenon of such structures is studied with additional bending stresses. Structural parameters governing the shear lag behaviour in tube(s)-in-tube structures are also investigated through thirty-three numerical examples.

  • PDF

Acceptable Supply Air Conditions of Dedicated Outdoor Air System for a High-rise Apartment Building (초고층 공동주택 외기전담 시스템 기반 중앙 공급식 환기시스템의 적정 급기조건 설정)

  • Kim, Min-Hwi;Kim, Jin-Hyo;Kwon, Oh-Hyun;Jeong, Jae-Weon
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2009.11a
    • /
    • pp.285-290
    • /
    • 2009
  • The main thrust of this paper is to investigate acceptable supply air conditions of a dedicated outdoor air system (DOAS) for highrise apartment buildings. As for a typical $132-m^2$ apartment unit, it was assumed that centralized DOAS-Ceiling Radiant Cooling Panel was installed. Transient behavior and control characteristics of each system were modeled numerically using a commercial equation solver program. The optimized dew point temperature of the DOAS was discussed on the basis of the ASHRAE standard 62.1-2007 and the current Korean ventilation standard for apartments. It was found that the optimized dew point temperature of the DOAS supply air accommodating total latent load of a space is $11-12^{\circ}C$ and the appropriate supply air temperature of the DOAS is $11-12^{\circ}C$ in cooling period and neutral temperature of $18-20^{\circ}C$ in intermediate period.

  • PDF

Three Dimensional Construction Stage Analysis and Deformation Monitoring of a Reinforced Concrete Highrise Building (철근콘크리트조 초고층건물의 3차원 시공단계 해석 및 시공중 변형 계측)

  • Jeong, Daegye;Yu, Eunjong;Ha, Taehun;Lee, Sungho
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.27 no.6
    • /
    • pp.573-580
    • /
    • 2014
  • In this paper, axial strains and lateral displacements of columns in a 58-story reinforced concrete building were measured using vibrating wire gauge and laser scanner, respectively, and compared with predicted values. Predictions were obtained using ASAP, which is a 3D construction stage analysis program developed based on PCA report. Comparisons indicated that columns in the middle of floor plan showed good correlation with predictions. However, the columns in the corners showed some deviations. Lateral displacement of columns between measurement and estimation showed similar trends but considerable deviations, which are seemingly caused by construction error of column faces, and inaccuracy in differential vertical displacement prediction.