• Title/Summary/Keyword: High-Speed Railway Tunnel

Search Result 212, Processing Time 0.028 seconds

Experimental Study on the Slanted Portals for Reducing the Micro-pressure Waves in High-speed Train-tunnel System(I) (고속철도 터널에서 경사갱구 입구의 미기압파 저감성능에 관한 연구(I))

  • Kim, Dong-Hyeon;Shin, Min-Ho;Han, Myeong Sik
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.2 no.2
    • /
    • pp.3-10
    • /
    • 2000
  • The compression wave produced when a high-speed train enters a tunnel propagates along the tunnel ahead of the train. The micro pressure wave related to the compression wave is a special physics phenomena created by high-speed train-tunnel interfaces. A among methods for the purpose of reducing the micro pressure wave is to delay the gradient of the compression wave by using aerodynamic structures. The objective of this paper is to determine the optimum slanted portal using the moving model rig. According to the results, the maximum value of micro pressure wave is reduced by 19.2% for the $45^{\circ}$ slanted portal installed at the entrance of the tunnel and reduced by 41.9% for the $45^{\circ}$ slanted portals at the entrance and exit of the tunnel. Also it is reduced by 34.6% for the $30^{\circ}$ slanted portals installed at the entrance and exit of the tunnel.

  • PDF

The Safety Analysis under failure of the 1st and 2ne Suspension Elements of the Next Generation High-speed Train model (차세대 고속철도 차량 모델의 1.2차 현가요소의 고장 발생 시 안전성 해석)

  • Kim, Ji-Young;Park, Tae-Won;Yoon, Ji-Won;Cho, Jae-Ik
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.984-988
    • /
    • 2010
  • In Korea, the next generation high-speed train, whose target is maximum speed of 400km/h and operating speed of 370km/h, has been developed since 2007. In this paper, the safety of the next generation high-speed train is compared UIC 518OR under the malfunctioning situation of the suspension system. The bogie of the next generation high-speed train has two suspensions. Two different vehicle models of the next generation high-speed train are created by using VAMPIRE and ADAMS/Rail, which are specialized to design railway vehicle. And Those models are showed same dynamic properties. First of all, the sensitivity analysis of ModelCenter is performed using model of VAMPIRE. One suspension element which has significant effects on the safety are selected by result of the sensitivity analysis. And then, the dynamic analysis when the suspension element is broken is performed using ADAMS/Rail. The 30km track between Pungsegyo and Biryong tunnel in Gyeongbu High-speed Line was used at the dynamic analysis. The estimated value is found by using the normal method of UIC 518OR. The estimated values on the normal/fault state and the limit values of UIC 518OR are compared. Finally, the safety of the next generation high-speed train is verified.

  • PDF

A study on quantitative risk assessment for railway Tunnel fire (철도터널에서 차량화재시 정량적 위험도 평가에 관한 연구)

  • Yoo, Ji-Oh;Nam, Chang-Ho;Jo, Hyeong-Je;Kim, Jong-Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.4
    • /
    • pp.307-319
    • /
    • 2010
  • As we learned in Daegu subway fire accident, fire in the railway tunnel is prone to develop to large disaster due to the limitation of smoke control and smoke exhaust. In railway tunnel, in order to ensure fire safety, fire prevention and fighting systems are installed by quantitative risk assessment results. Therefore, in this research, developed the program to establish quantitative risk assessment and suggested quantitative safety assessment method including fire scenarios in railway tunnel, fire and evacuation analysis model, fatality estimate model and societal risk criteria. Moreover, this method applys to plan preventing disaster for Honam high speed railway tunnel. As results, we presented the proper distance of escape route and societal risk criteria.

Effect of a Pressure Relief System in a High-speed Railway Tunnel (고속 열차 터널의 공기압력 감소를 위한 압력 제어 시스템)

  • Seo, Sang Yeon;Ha, Heesang;Lee, Sang Pil
    • Tunnel and Underground Space
    • /
    • v.28 no.3
    • /
    • pp.247-257
    • /
    • 2018
  • High-speed trains have been developed widely in many countries in order to transport large quantity of people and commodities rapidly. When a high speed train enters a tunnel, aerodynamic resistance is generated suddenly. The resistance caused from air pressure induces micro pressure wave and discomfort to passengers in a train. Therefore, a pressure relief system should be installed in a tunnel to reduce the resistance acting against the running train in a tunnel. Additionally, the shape of a grain should be streamlined in order to reduce aerodynamic resistance caused by a high-speed train. The cross-section of a tunnel also should be carefully designed to reduce discomfort of passengers. This study represents the effect of pressure relief ducts installed between two running tunnels. The pressure relief duct was integrated with a cross-passage in order to save cost and construction time. One-dimensional network numerical simulations were carried out in order to estimate the effect of pressure relief systems.

Flow Analysis Using 1 and 3 Dimensional Hybrid Mesh For Ultra-High Speed Vehicle Inside A Long Distance Tunnel (1-3차원 혼합격자를 이용한 장거리 터널 내 고속 운송체 유동해석)

  • Kim, Tae-Kyung;Choi, Joong-Keun;Kwon, Hyeok-Bin;Kim, Kyu-Hong
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.107-118
    • /
    • 2011
  • This paper performs flow analysis of ultra-high speed vehicle inside the long distance tunnel. One and three dimensional hybrid mesh was used for describing moving motion and flow analysis of an vehicle inside a long distance tunnel which over 20 km. Flow analysis and aerodynamic drag measuring were performed by three dimensional mesh: around vehicle, and pressure waves of a tunnel was measured by one dimensional mesh: the other region where rare changing of flow pattern.

  • PDF

A Study on the Effect of Mud-flap on the Cabin Noise in KTX (고속열차의 객실 소음에 미치는 머드플랩의 영향에 관한 연구)

  • Choi, Seong-Hun;Chung, In-Soo;Seo, Sung-Il
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.5 s.36
    • /
    • pp.550-554
    • /
    • 2006
  • In the early stage of operation of KTX, passengers complained of the excessive cabin noise as the passes the tunnel. The noise is caused partly by wheel-rail contact and partly by airflow around the carbody. In this study, to reduce the cabin noise, the effect of the mud-flaps located between the cars is investigated. A series of tests was conducted to clarify the influences of the type and length of mud-flap, and train speed on the cabin noise. The optimum length of mud-flap was found. The shedding vortices around the mud-flap is thought to be the cause of the aerodynamic noise. Strouhal number and the resonant shedding frequency around the mud-flap correlated well with the cabin noise level.

Development of seismic fragility curves for high-speed railway system using earthquake case histories

  • Yang, Seunghoon;Kwak, Dongyoup;Kishida, Tadahiro
    • Geomechanics and Engineering
    • /
    • v.21 no.2
    • /
    • pp.179-186
    • /
    • 2020
  • Investigating damage potential of the railway infrastructure requires either large amount of case histories or in-depth numerical analyses, or both for which large amounts of effort and time are necessary to accomplish thoroughly. Rather than performing comprehensive studies for each damage case, in this study we collect and analyze a case history of the high-speed railway system damaged by the 2004 M6.6 Niigata Chuetsu earthquake for the development of the seismic fragility curve. The development processes are: 1) slice the railway system as 200 m segments and assigned damage levels and intensity measures (IMs) to each segment; 2) calculate probability of damage for a given IM; 3) estimate fragility curves using the maximum likelihood estimation regression method. Among IMs considered for fragility curves, spectral acceleration at 3 second period has the most prediction power for the probability of damage occurrence. Also, viaduct-type structure provides less scattered probability data points resulting in the best-fitted fragility curve, but for the tunnel-type structure data are poorly scattered for which fragility curve fitted is not meaningful. For validation purpose fragility curves developed are applied to the 2016 M7.0 Kumamoto earthquake case history by which another high-speed railway system was damaged. The number of actual damaged segments by the 2016 event is 25, and the number of equivalent damaged segments predicted using fragility curve is 22.21. Both numbers are very similar indicating that the developed fragility curve fits well to the Kumamoto region. Comparing with railway fragility curves from HAZUS, we found that HAZUS fragility curves are more conservative.

Rational high-speed railway plan for passing through metropolis (고속철도의 합리적인 광역도시 통과방안)

  • Ahn Yong-Mo;Kim Hong-Yeoun
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.144-150
    • /
    • 2005
  • After the historic opening of the first section of KTX(Korea Train eXpress), it has been made changes three times in a plan to pass through cities of Daejeon, Daegu in the construction of the high speed train's second section(underground${\to}$ on ground${\to}$ under ground${\to}$ on ground). Thereafter, it has been repeatedly argued that the plan to pass through underground caused many problems such as prevention of an accident in tunnel, the difficulty of maintainence, the disadvantage of passengers' moving line. Thus construction on ground plan is coming up again with relation to the interest among local people. There have been lots of national budget loss, construction period delay in this project and people hardly trust policies about national project and nor do engineers. It will be presented that the railway line which is accorded with the characteristics of region, an agreement with local communities about national project, the reasonable procedure to determine how to pass through cities, resolve the conflict among neighborhood, and the role of engineers.

  • PDF

Characteristics of Vibration of Track and Vehicle Body According to Type of Track in Tunnel of High-Speed Railway Lines (고속철도 터널에서의 궤도 형식에 따른 궤도와 차체의 진동 특성)

  • Kim, Man Cheol;Jang, Seung Yup
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1D
    • /
    • pp.125-132
    • /
    • 2006
  • In the present study, in order to elucidate the vibration characteristics of track and train body according to the type of track in tunnel, the vibration accelerations of the track and the KTX train body have been measured in tunnels of Kyong-Bu high-speed railway(HSR) lines, and the frequency analysis of the measured data has been performed. From this, the vibration characteristics of the track components such as rail, sleeper, ballast and slab, the tunnel lining and the vehicle body according to the type of track are investigated and their relation is analyzed. The test results show that the vibration of rail and vehicle body rapidly increases at 80Hz in tunnel, and that is much higher in the tunnel on which the concrete slab track is placed. According to the results of the present study, rail supporting stiffness can variate the vibration characteristics of the total system including the vehicle, and therefore the correlation between the vibration of vehicle should be taken into account to determine the supporting stiffness of the slab track.

Structure stability study for existing subway tunnel segment of Seoul-Busan high-speed railroad (Daegu - Busan) construction (경부고속철도(대구-부산) 도심통과 노반신설 공사중 기존 지하철 터널구간의 구조적 안정성 검토)

  • Kong, Byung-Seung;Kim, Min-Ho
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1752-1759
    • /
    • 2007
  • In the new Seoul-Busan high speed railroad construction specially city center passage roadbed establishment is recommended the staibility for the existing subway tunnel segments of Busan subway line No. 1 and No.2. regarding the appearance condition, a quality condition and the durability of the objective facility site exact inspection, and it evaluates the numerical analysis which uses MIDAS GTS it leads and there is the objective of the place where the stability of the objective facility and this tunnel it investigates. To immediacy of the on-the-spot inspection result whole facility it is a condition where the reinforcement which is simple not to be hindrance is necessary, 2nd Line case it is a condition which transfer is good but the general defect and the damage which occur from the tunnel of NATM type were confirmed part. While roadbed establishment constructing that the continuous maintenance is necessary, it is judged. The result of 1st, 2nd Line maximum sinkage, unequal sinkage and the lining stress of numerical analysis are within permission and the damage degree is appearing with the fact that the degree it will can disregard it is slight. But it enforces necessary Pre-grouting in order to minimize an actual tunnel face conduct and when the tunnel is excavated it is judged with the fact that necessary to minimize the outflow possibility.

  • PDF