• 제목/요약/키워드: High-Rise Building Project

검색결과 180건 처리시간 0.028초

초고층 주상복합 건물의 개발사업 단계에 따른 주변지역 아파트가격의 변화에 관한 연구 (A Study on the Changes of the Apartment price in Accordance with Project process of Super high-rise mixed use buildings)

  • 김상환;최원철;김주형;김재준
    • KIEAE Journal
    • /
    • 제10권5호
    • /
    • pp.159-164
    • /
    • 2010
  • High-rising buildings are a sort of solution to recent cities. Till now real estate development was concentrated in new development on vacant lots, and it resulted urban sprawl. Generally large cities are confronted with the exodus of industry and population from city. High-rising buildings solve many problems associated with this problem. The purpose of this research is to identify the effect of super high-rise mixed use building project process on apartment price. For this study, the hypothesis is that price of apartments is influenced by project process of super high-rise mixed use building. The study concerned 4 variations of project process that is building permits stage, sale stage, construction starting stage and stage of moving into building. The target projects of buildings are selected by number of floor(over 40 floors) and construction time. And 48 apartment complex are selected around super high-rise mixed use building. This study uses hedonic price function to analysis effect of project process of super high-rise mixed use building. A price of apartments is defined as a dependent variable. Characteristics of residence, complex, district and super high-rise building are defined as independent variables. The results are as follows; first, there is no error in price model of this study. Second, it is found that apartment price was influenced negatively by building permit stage and sale stage of super high-rise mixed use building. But that was influenced positively by construction starting stage and stage of moving into building of that. Third, as the project process of super high-rise mixed use building was proceeded, price of apartments was increased.

Meeting the Energy Reduction Goal on a High Rise Building thru IPD Framework

  • Jeong, Pyung Oh;Lee, Peter;Kim, Sang-jin
    • 국제초고층학회논문집
    • /
    • 제2권2호
    • /
    • pp.93-96
    • /
    • 2013
  • Greenhouse gas emissions and excessive energy consumption have been an on-going world issue nowadays. We can find that the majority portion is caused by high-rise office buildings. In order to resolve these problems, it is extremely important to implement various active or passive strategies in a building design. To successfully meet these design goals and energy reduction approaches, a project building must utilize an efficient design process from the early start. One of the most effective project delivery process called Integrated Project Delivery (IPD) will be implemented in a case study project building (KEPCO) during design phase and show how important it is to plan a project's green environmental performance goal together through an early collaboration from all key project participants, which helps to construct an successful green building design without any critical construction pitfalls.

초고층빌딩 거푸집 공사의 장단점 비교에 관한 연구 (Comparative Study of Strength and Weakness of System Form in High-rise Building Project)

  • 박병주;유승규;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.9-10
    • /
    • 2012
  • According to the recent trends in the construction business have been actively booming both overseas plant orders and high-rise buildings orders. In addition high-rise building projects have being promoted or is actually under construction in Korea. Frame structure review which is the most consuming period on high-rise building is essential on that project. In this study looks for the currently form system and compares to those large system used in high-rise buildings.

  • PDF

OWAS기법을 활용한 초고층 코어월 공사의 근로자 작업자세 분석 (Working Posture Analysis Using OWAS method of Core Wall Construction in High-rise Building)

  • 이준혁;김태훈;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.72-73
    • /
    • 2016
  • Working Posture is an important factor directly connected with quality and productivity of the construction project. In particular, High-rise building construction is required to manage the working posture due to the repetitive task and unfavorable working condition such as high place work, limited space. However existing construction planning of high-rise building construction has a negative effect on the labor's productivity because it is not insufficiently considered for working posture. Therefore the purpose of this study is to suggest a work that needs improvement by analyzing labor's working posture quantitatively using OWAS method. These results would provide the basic information to improve the productivity of the construction project by supporting the construction plan considering the working posture in high-rise building.

  • PDF

Citic Tower Construction Key Technology

  • Xu, Lishan
    • 국제초고층학회논문집
    • /
    • 제8권3호
    • /
    • pp.185-192
    • /
    • 2019
  • Citic Tower is the first over-500 m-tall super highrise building in the world, located in the high seismic intensity area with paek ground acceleration over 0.2g in 475 years. This project is unique in its complexity, large volume, and challenging site conditions (zero site for construction). The traditional techniques can hardly meet safty, quality and schedule requirements of the construction. This article introduces the key construction technologies that are innovatively developed and applied in Citic Tower project construction, including intelligent super-high-rise building integrated construction platform system, independently developed by the CCTEB; Jump-Lift Elevator, which is the first of the kind with service height over 500 meters; combined temporary-and-permanent fire protection systems. The BIM technology is also applied in this project. Through technical innovation, and utilization of technologies, construction speed and safety had been greatly improved.

Information-based Smart Construction Management of High Rise Building Under the Complex Surrounding Environment in City Core Area

  • Liang, Haoqing;Li, Jian;Song, Weiqing
    • 국제초고층학회논문집
    • /
    • 제10권3호
    • /
    • pp.203-210
    • /
    • 2021
  • With the development of urbanization, the increasing of buildings density in urban core areas result in the complexity of construction environment. High-rise landmark building is always preferred in the construction of urban core areas. Super high-rise buildings construction are facing construction management difficulties due to the complex working conditions and enormous building system, especially with the complex surrounding environment of the urban core area, the construction management of super high-rise buildings in the area requires higher, refined and detailed standard. Based on a super high-rise project in a core area of Shanghai which has 370 m building height and 772,643 m2 building area, with complex surrounding environment, narrow construction site and many super-high-altitude crossing works. With the application of BIM technology, the Internet of Things, the LAN communication and other various intelligent mechanical equipment, information management systems, the efficiency and refinement of construction management are improved, ensuring the smooth implementation of the project while effectively controlling the impact on the surrounding environment.

Multitasking Façade: How to Combine BIPV with Passive Solar Mitigation Strategies in a High-Rise Curtain Wall System

  • Betancur, Juan
    • 국제초고층학회논문집
    • /
    • 제6권4호
    • /
    • pp.307-313
    • /
    • 2017
  • This paper outlines the processes and strategies studied and selected by the team during the design stages of the project for the incorporation of BIPV into the tower's façade. The goal was to create a system that helps reduce internal heating and cooling loads while collecting energy through photovoltaic panels located throughout the building. The process used to develop this façade system can be broken down into three stages. 1. Concept: BIPV as design catalyst for a high-rise building. 2. Optimization: Balancing BIPV and Human comfort. 3. Integration: Incorporating BIPV into a custom curtain wall design. The FKI Project clearly illustrates the evolution building enclosures from simple wall systems to high performance integrated architectural and engineering design solutions. This design process and execution of this project represent the design philosophy of our firm.

Structural Design of Mid-Story Isolated High-Rise Building - Roppongi Grand Tower

  • Nakamizo, Daiki;Koitabashi, Yuichi
    • 국제초고층학회논문집
    • /
    • 제7권3호
    • /
    • pp.233-242
    • /
    • 2018
  • Since the response reduction effect on over 200-meter-tall resulting from the seismic isolation system is smaller in general than low-rise and mid-rise buildings, mid-story isolated buildings are considered to reduce the response in the upper part above the isolation story, however, in many cases, the acceleration response just below the isolation story is likely to be the largest. This paper presents the structural design schemes, the design of the main structural frames, and the constructions of a 230-meter-tall super high-rise building with mid-story isolation mechanism integrated in Roppongi, Tokyo. Moreover, this paper shows how the architectural and structural design for integrating a mid-story isolation system in a super high-rise building has been conducted and what solutions have been derived in this project. The realization of this building indicates new possibilities for mid-story isolation design for super high-rise buildings.

초고층 건설공사 시공단계 리스크 요인 도출 및 분석 (Extraction and Analysis of Construction Phase Risk Factors in High-rise Construction Project)

  • 김수용;김성현;양진국
    • 한국건설관리학회논문집
    • /
    • 제17권2호
    • /
    • pp.90-98
    • /
    • 2016
  • 고층 건설 프로젝트는 다양한 위험 요인이 있다. 주요 위험 요인은 시간 지연과 비용의 증가 등의 부정적인 결과이다. 따라서, 본 연구는 PROMETHEE 기법을 사용하여 초고층 건설공사 시공 단계에서의 위험 요인을 분석하였다. 이를 위해, 본 연구는 전문가 표적집단면접법(FGI)을 통해 위험 인자를 확인 하였다. 그리고 PROMETHEE는 초고층 건설공사 위험 분석을 위한 설정 평가기준으로 사용 하였다. 다음으로, 평가지표 계산의 기준은 PDRI에서 정의 레벨을 사용하여 구성하였다. 선호지수 및 평가 지표는 설문을 통해 규명되었다. 이러한 과정을 통해, PROMETHEE 기법을 이용하여 본 연구는 초고층 건설공사 시공 리스크의 중요도를 산정하였다. 그 결과, 높은 수준의 위험 요인은 다음과 같이 나타났다. 이것은 '재료 리프팅 운영 계획', '아웃리거 벨트 트러스 건설', '고층 건물의 기초 작업 계획'과 '고층 건물의 구조 개념을 고려'이다.