• Title/Summary/Keyword: High school building

Search Result 1,039, Processing Time 0.028 seconds

Customized Safety Information Delivery System for Unskilled Construction Worker Training

  • Jo, Junhyeon;Baik, Sangeun;Pedro, Akeem;Lee, Doyeop;Park, Chansik
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.525-532
    • /
    • 2022
  • Accidents at construction sites in Korea account for more than half of all industrial accidents. To solve this problem, a policy to strengthen safety education was implemented to ensure the safety of workers. However, it was analyzed that there is a high possibility of accidents because workers did not receive proper safety information for each risk factor due to general lecture-style education. In addition, statistics show that the accident status of workers with fewer years of period is high, indicating that a customized information delivery method needs to be proposed for unskilled workers with fewer years of period. Research on the importance of education has been conducted, but no information delivery method has been identified. For unskilled workers to effectively receive safety information, appropriate delivery formats (text, photos, illustrations, 4D-BIM, 360-based panorama, video, animation) were analyzed, and a new method of education was proposed. If customized safety information is provided according to this proposal, effective information delivery to unskilled workers will be possible, and it is expected to be verified in various ways.

  • PDF

A Study on the Improvement of Fire Safety in high-rise Building Construction in Legal aspects (법규적 측면에서 고찰한 고층 건축물 공사현장 화재안전 확보방안)

  • Park, Chan-Seok;Jeong, Il-Kyun
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.1
    • /
    • pp.21-32
    • /
    • 2015
  • High rising of the buildings offers a number of risk factors than ever before with regard to fire prevention. Especially in the construction site of high-rise buildings, people waste golden-time during the evacuation because temporary fire fighting facilities are not installed and transferred to a large fire because of fire suppression failure. In this study, the researcher derives the problems of fire protection in high-rise buildings construction sites and proposed the measures in such the legal aspects as fire building construction code and etc. There are the legal improvements such as orders of construction suspension in the problems of fire safety, appointing fire safety manager, temporary fire protection installation standards, enhancing penalty provisions regarding the use of fire, operating self fire brigade, confirming on-site after completing fire-protection facalities, establishment or strengthening special fire-protection investigations.

Numerical Simulation on Disproportionate Collapse of the Tall Glulam Building under Fire Conditions

  • Zhao, Xuan;Zhang, Binsheng;Kilpatrick, Tony;Sanderson, Iain
    • International Journal of High-Rise Buildings
    • /
    • v.10 no.4
    • /
    • pp.311-321
    • /
    • 2021
  • Perception of the public to structural fires is very important because there are only a number of tall timber buildings constructed in the world. People are hesitating to accept tall timber buildings, so it is essential to ensure the first generation of tall timber buildings to a very high standard, especially fire safety. Right now, there are no specific design standards or regulations for fire design of tall timber buildings in Europe. Even though heavy timber members have better fire resistance than steel components, many conditions still need to be verified before considering the use of timber materials, e.g. fire spread, post-fire collapse, etc. This research numerically explores the structural behaviours of a tall Glulam building when one of its internal Glulam (Glued laminated timber) columns fails after sustaining a full 120-min standard fire and is removed from the established finite element building model created in SAP2000. The numerical results demonstrate that the failure and removal of the selected internal Glulam column may lead to the local failure of the adjacent CLT (Cross laminated timber) floor slabs, but will not lead to large disproportionate damage and collapse of the whole building. Here, the building is assumed to be located in Glasgow, Scotland, UK.

Dynamic Analysis of AP1000 Shield Building Considering Fluid and Structure Interaction Effects

  • Xu, Qiang;Chen, Jianyun;Zhang, Chaobi;Li, Jing;Zhao, Chunfeng
    • Nuclear Engineering and Technology
    • /
    • v.48 no.1
    • /
    • pp.246-258
    • /
    • 2016
  • The shield building of AP1000 was designed to protect the steel containment vessel of the nuclear reactor. Therefore, the safety and integrity must be ensured during the plant life in any conditions such as an earthquake. The aim of this paper is to study the effect of water in the water tank on the response of the AP1000 shield building when subjected to three-dimensional seismic ground acceleration. The smoothed particle hydrodynamics method (SPH) and finite element method (FEM) coupling method is used to numerically simulate the fluid and structure interaction (FSI) between water in the water tank and the AP1000 shield building. Then the grid convergence of FEM and SPH for the AP1000 shield building is analyzed. Next the modal analysis of the AP1000 shield building with various water levels (WLs) in the water tank is taken. Meanwhile, the pressure due to sloshing and oscillation of the water in the gravity drain water tank is studied. The influences of the height of water in the water tank on the time history of acceleration of the AP1000 shield building are discussed, as well as the distributions of amplification, acceleration, displacement, and stresses of the AP1000 shield building. Research on the relationship between the WLs in the water tank and the response spectrums of the structure are also taken. The results show that the high WL in the water tank can limit the vibration of the AP1000 shield building and can more efficiently dissipate the kinetic energy of the AP1000 shield building by fluid-structure interaction.

Ergonomics Job Hazard Evaluation of Building Cleaners

  • Lee, Kyung-Sun;Lee, In-Seok;Kim, Hyun-Joo;Jung-Choi, KyungHee;Bahk, Jin-Wook;Jung, Myung-Chul
    • Journal of the Ergonomics Society of Korea
    • /
    • v.30 no.3
    • /
    • pp.427-435
    • /
    • 2011
  • Objective: The objective of this study was to evaluate a work of building cleaners using the ergonomic methods. Background: Previous studies about cleaning worker describe typical physical demands of this work. They found that the most significant risk factors associated with the physical work of cleaners are static loads and repetitive movements and high output of force. Method: A head of ergonomics estimation was work analysis(define of combined task, work tool, work time and frequency of combined task) and posture analysis of worker. Results: The results showed that combined task of building cleaners was classification sweeping, mopping(wet), mopping(oil), moving barrels/carts, dumping trash bags, scrubbing, arrangement of cleaning tool, arrangement of circumferential, moving of cleaning tool, and waiting. The work time of combined task such as mopping(wet) and scrubbing indicated high ratio. The posture analysis of building cleaners indicated high value in bending of the head, lower arm, and hands. Conclusion: The findings appear to indicate that building cleaner were related to high risk of work-related musculoskeletal disorders. So, building cleaner would be required an interventional strategy, improvement of cleaning tools and working environment. Application: If ergonomics rule can be integrated into existing cleaning tools and work environments, the risk of occupational injuries will be reduced.

The Estimation Analysis Method of the Annual Operation Cost of Korean High-rise Condominiums

  • Ko, Eun Hyung;Choi, Jun Young
    • Architectural research
    • /
    • v.7 no.1
    • /
    • pp.11-18
    • /
    • 2005
  • In today's building industry the emphasis has been geared more towards construction, thus building maintenance and life cycle have been neglected until now. A direct result of this neglect is the rapid aging of building, which leads to more cost-effective decision making methods for the prolongation of building life span. The following study is conducted in the area of Daegu and Seoul in order to develop the estimation analysis method of the annual operation cost of the Korean high-rise condominiums for the cost-effective decision making support through mathematical and statistical analyses including the present value and standardized measurement corrections. Based on the assumption that the life expectancy of the high rise condominium is 50 years, initial cost is ₩421,212/$m^2$, and a total sum of yearly operation cost during life expectancy is ₩2,154,499//$m^2$), yearly accumulated operation cost is shown as below: $AOC=0.7097t^4-38.803t^3+806.95t^2+11045t-496.52$ ($R^2=0.98$) (Here, AOC = Accumulated Operation Cost, t = given years)

A Study on Horizontal Displacement Following Ability of Welded and Non-welded Building Hardware (용접형과 무용접형 하지철물의 수평변위 추종능력에 관한 연구)

  • Lee, Don-Woo;Kwak, Eui-Shin;Shon, Su-Deok;Lee, Seung-Jae
    • Journal of Korean Association for Spatial Structures
    • /
    • v.16 no.4
    • /
    • pp.75-82
    • /
    • 2016
  • Building hardware joints are welded in most cases, which have risks of fire and explosion. Besides, the secondary damage of the destruction of the welded parts can be caused by the horizontal displacement of the structure due to earthquake or wind load. This paper compared the horizontal displacement following abilities of welded building hardware and non-welded building hardware. To do this, We conducted actual formation shake table test, and checked on the horizontal displacement following ability of structure by comparing their responses to earthquake load. We made the 2m-high framework to examine the responses of the actually constructed building hardwares, and analyzed the displacement responses of the welded-typed, non-welded-typed, and cruciform bracket building hardwares. We conducted the test by increasing acceleration rate until displacement reached 40mm corresponding to allowable relative story displacement II. The result of the test showed that the building hardware using welding work made cracking and breakage on welded connections of welded building hardware, but non-welded building hardware with no use of welding work and cruciform bracket building hardware make no problem, and that non-welded building hardware is superior to that of the welded building hardware in the horizontal displacement following ability due to earthquake or wind load.

Compressive Properties of Amorphous Metal Fiber Reinforced Concrete Exposed to high Temperature

  • Lee, Jun-Cheol;Kim, Wha-Jung;Lee, Chang-Joon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.2
    • /
    • pp.183-193
    • /
    • 2012
  • Compressive property of high strength concrete with amorphous metal fibers subject to high temperature has been investigated. The measure of this investigation includes explosive spalling, weight loss, residual compressive strength, strain at peak stress, elastic modulus, and residual energy absorption capacity after exposure to $400^{\circ}C$, $600^{\circ}C$and $800^{\circ}C$. In addition to the amorphous metal fiber, two other types of fibers (polypropylene fiber and hooked-end steel fiber) were also included in this investigation for comparison. The experimental program was conducted with high strength concrete using several combinations of the fiber types. The testing result shows that the concrete with amorphous metal fibers plus polypropylene fibers shows a superior behavior than those using other combination or single fiber type ingredient.

Geometric and structural assessment and reverse engineering of a steel-framed building using 3D laser scanning

  • Arum Jang;Sanggi Jeong;Hunhee Cho;Donghwi Jung;Young K. Ju;Ji-sang Kim;Donghyuk Jung
    • Computers and Concrete
    • /
    • v.33 no.5
    • /
    • pp.595-603
    • /
    • 2024
  • In the construction industry, there has been a surge in the implementation of high-tech equipment in recent years. Various technologies are being considered as potential solutions for future construction projects. Building information modeling (BIM), which utilizes advanced equipment, is a promising solution among these technologies. The need for safety inspection has also increased with the aging structures. Nevertheless, traditional safety inspection technology falls short of meeting this demand as it heavily relies on the subjective opinions of workers. This inadequacy highlights the need for advancements in existing maintenance technology. Research on building safety inspection using 3D laser scanners has notably increased. Laser scanners that use light detection and ranging (LiDAR) can quickly and accurately acquire producing information, which can be realized through reverse engineering by modeling point cloud data. This study introduces an innovative evaluation system for building safety using a 3D laser scanner. The system was used to assess the safety of an existing three-story building by implementing a reverse engineering technique. The 3D digital data are obtained from the scanner to detect defects and deflections in and outside the building and to create an as-built BIM. Subsequently, the as-built structural model of the building was generated using the reverse engineering approach and used for structural analysis. The acquired information, including deformations and dimensions, is compared with the expected values to evaluate the effectiveness of the proposed technique.