• Title/Summary/Keyword: High pressure route and low pressure route

Search Result 11, Processing Time 0.019 seconds

Status of Damage and Restoration Planning of Forest Trail in Choansan(Mt.) Neighborhood Park, Seoul, South Korea (초안산근린공원 숲길 훼손 실태 및 복원방안 연구)

  • Han, Bong-Ho;Ki, Kyong-Seok;Noh, Tai-Hwan
    • Korean Journal of Environment and Ecology
    • /
    • v.26 no.6
    • /
    • pp.923-933
    • /
    • 2012
  • The purpose of this study targeting Choansan(Mt.) Neighborhood Park in Seoul of South Korea, whose level of visitation and use pressure has been recently increasingly high, was to understand distribution and damage status of forest trail and accordingly, set up direction of how to improve forest trail in urban area. With regards to current damage on forest trail in Choansan(Mt.) Neighborhood Park, the damaged trail with road width of over 2m and with erosion depth of over 30cm amounted to 20.3% and 36.3% respectively. And the trail section with bare land erosion, root exposure or rock exposure and the section whose impact rating class exceeded IV occupied 47.0% and 70.6%, indicating the forest trail was severely damaged. The severely injured trail route mainly included the main forest trail formed along the main ridge, the byroad connected to the main forest trail and the steep forest trail in low-lying area. Based on the study results, five types of restoration of forest trail in Choansan(Mt.) Neighborhood Park were offered, including prevention of forest trail extension, stabilization of forest trail base, maintenance of forest trail surface, vegetation restoration after closing forest trail and maintenance. Ecological restoration was additionally offered. The prevention of forest trail extension was planned to prevent expanded width of forest trail where bare land was exposed. The stabilization of forest trail base was planned to prevent erosion in the forest trail and exposure of roots. The maintenance of forest trail surface was planned in a way to protect the severely damaged forest trail surface by using wood deck and wood stairs and surfacing the road.