• 제목/요약/키워드: High intensity discharge

검색결과 140건 처리시간 0.031초

Long Term Monitoring of Storm Surface Runoff from Urban Pavement Road in Korea

  • Lee, C.S.;Seo, G.T.;Lee, J.H.;Yoon, Y.S.;You, J.J.;Sin, C.K.
    • Environmental Engineering Research
    • /
    • 제13권4호
    • /
    • pp.184-191
    • /
    • 2008
  • Long term monitoring was conducted to investigate a surface runoff of pollution from urban highway. The monitoring data was collected for 18 rainfall events and was used to correlate pollution load to various parameters, such as rainfall intensity, antecedent dry days and total discharge flow. Runoff coefficient and seasonal variation were also evaluated. The mean runoff coefficient of the highway was 0.823(range; $0.4687{\sim}0.9884$), and wash-off ratio for $COD_{Mn}$ and SS loads was 72.6% and 64.3%, respectively. For the initial rainfall event, the runoff EMC of $COD_{Mn}$ was high in summer and the EMC of SS was high in autumn season. However the seasonal variation of T-N and T-P was not significant. The discharged $COD_{Mn}$-EMC was $147.6\;mg/L{\sim}9.0\;mg/L$ on the generated $COD_{Mn}$-EMC of $98.8\;mg/L{\sim}8.9\;mg/L$. While the generated EMC of SS was in $285.7\;mg/L{\sim}20.0\;mg/L$ and its discharged EMC was in $190.4\;mg/L{\sim}8.0\;mg/L$. EMC of pollutants was not directly related to the first flush rainfall intensity and the antecedent dry days. But the correlation was relatively high between EMC and cumulative runoff flow volume. The trend of EMC was reduced with the cumulative runoff flow volume.

뉴스초점 - LED산업 현황 및 육성의 필요성 (The Present Condition of LED Industry and Necessity of Promote it)

  • 하재찬
    • 기술사
    • /
    • 제42권5호
    • /
    • pp.41-45
    • /
    • 2009
  • The last century of lighting has been dominated by incandescent, fluorescent and high-intensity discharge(HID)light sources. In the late 1970's, after green LEDs were invented, Dr. Ching Tang at Eastman Kodak discovered that sending an electrical impulse through carbon compound caused such material glow. Present day LED commercial packages have reached 100 lm/W, comparable to the efficacies of fluorescent and certain HID lamps. LED products available today are market as "Green-Industry" but actually low light output compared to typical light sources. The combination of high price and low light output make them a poor replacement for current technology. It is very important to compare new LED products to the most efficient conventional technology that could be used for any specific application. As LED technology advances, costs decrease, and efficiency improves, LEDs will build market share in the general illumination market.

  • PDF

A Magnetic Hysteresis Curve Tracer for Rare Earth

  • Rhee, J.R.
    • Journal of Magnetics
    • /
    • 제1권2호
    • /
    • pp.94-100
    • /
    • 1996
  • A hysteresis loop tracer using a pulsed high magnetic field of 113.4 kOe, which is suitable for rare earth based permanent magnets, is constructed. The high pulsed magnetic field is generated by discharging a large capacitance charge (5 mF) with a voltage of 600 V into an air solenoid with the inner diameter of 14 mm, outer diameter of 36 mm and the lingth of 34 mm. A computer simulation method is used for the construction of an electromagnet to optimize the many parameters such as the discharge current, generated pulsed magnetic field intensity, thermal dissipation, capacitance, charged voltage, period of damping oscillation and solenoid geometry. By using the hysteresis loop tracer constructed in this work, we are able to measure hystersis loops of several rare earth based permanent magnets with large values of the remanent magnetization, coercvity and energy product.

  • PDF

고속 스퍼터링 소스를 이용한 구리 후막 제조 및 특성 평가 (Characteristics of Cu Thick Films Deposited by High Rate Magnetron Sputtering Source)

  • 정재인;양지훈
    • 한국표면공학회:학술대회논문집
    • /
    • 한국표면공학회 2008년도 추계학술대회 초록집
    • /
    • pp.13-14
    • /
    • 2008
  • A high rate magnetron sputtering source (HRMSS) was employed to deposit thick copper films. The HRMSS was manufactured by changing the magnet size, arrangement, and field intensity. For the preparation of thick copper films, the copper sputtering conditions using HRMSS were characterized based on the deposition parameters such as discharge characteristics, I-V characteristics of the source, and change of deposition rate. The deposition rate of copper turned out to be more than 5 times than that of conventional magnetron sputtering source. Thick copper films having thickness of more than $20{\mu}m$ were prepared by using HRMSS. The morphology and orientation of the films were investigated by scanning electron microscopy and x-ray diffraction.

  • PDF

내부 공진을 이용해 점등하는 메탈할라이드 고압방전등 전자식 안정기 (The Electronic Ballast of HID (High Intensity Discharge) Lamp using internal resonance)

  • 조병철;문성진;이인규;조보형
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2001년도 전력전자학술대회 논문집
    • /
    • pp.580-583
    • /
    • 2001
  • A high ignition voltage is required for the metal halide (MHD) lamp. In this paper, the ballast ignited by internal LC resonance of buck converter with minimum size is proposed. For minimizing the ignition current for device safety, the characteristic impedance is maximized. But this results In a large steady state ripple, which may cause the accoustic resonance. The steady state ripple cancellation network using the coupled inductor is proposed.

  • PDF

Optimization of membrane fouling process for mustard tuber wastewater treatment in an anoxic-oxic biofilm-membrane bioreactor

  • Chai, Hongxiang;Li, Liang;Wei, Yinghua;Zhou, Jian;Kang, Wei;Shao, Zhiyu;He, Qiang
    • Environmental Engineering Research
    • /
    • 제21권2호
    • /
    • pp.196-202
    • /
    • 2016
  • Membrane bioreactor (MBR) technology has previously been used by water industry to treat high salinity wastewater. In this study, an anoxic-oxic biofilm-membrane bioreactor (AOB-MBR) system has been developed to treat mustard tuber wastewater of 10% salinity (calculated as NaCl). To figure out the effects of operating conditions of the AOB-MBR on membrane fouling rate ($K_V$), response surface methodology was used to evaluate the interaction effect of the three key operational parameters, namely time interval for pump (t), aeration intensity ($U_{Gr}$) and transmembrane pressure (TMP). The optimal condition for lowest membrane fouling rate ($K_V$) was obtained: time interval was 4.0 min, aeration intensity was $14.6 m^3/(m^2{\cdot}h)$ and transmembrane pressure was 19.0 kPa. And under this condition, the treatment efficiency with different influent loads, i.e. 1.0, 1.9 and $3.3kgCODm^{-3}d^{-1}$ was researched. When the reactor influent load was less than $1.9kgCODm^{-3}d^{-1}$, the effluent could meet the third discharge standard of "Integrated Wastewater Discharge Standard". This study suggests that the model fitted by response surface methodology can predict accurately membrane fouling rate within the specified design space. And it is feasible to apply the AOB-MBR in the pickled mustard tuber factory, achieving satisfying effluent quality.

VISUALIZATION OF THE INTERNAL WATER DISTRIBUTION AT PEMFC USING NEUTRON IMAGING TECHNOLOGY: FEASIBILITY TEST AT HANARO

  • Kim Tae-Joo;Jung Yong-Mi;Kim Moo-Hwan;Sim Cheul-Muu;Lee Seung-Wook;Jeon Jin-Soo
    • Nuclear Engineering and Technology
    • /
    • 제38권5호
    • /
    • pp.449-454
    • /
    • 2006
  • Neutron imaging technique was used to investigate the water distribution and movement in Polymer Electrolyte Membrane Fuel Cell (PEMFC) at HANARO, KAERI. The Feasibility tests were performed in the first and second exposure rooms at the neutron radiography facility (NRF) at HANARO in order to check the ability of each exposure room, respectively. The feasibility test apparatus was composed of water and pressurized air before making up the actual test apparatus. Due to the low neutron intensity in the second exposure room, the exposure time was too long to investigate the transient phenomena of PEMFC. Although the exposure time was improved to 0.1 sec in the first exposure room, it was difficult to discriminate detail water movement at the channel due to the high noise level. Therefore, the experimental setup must be optimized according to the test conditions. Water discharge characteristics were investigated under different flow field geometries by using feasibility test apparatus and the neutron imaging technique. The water discharge characteristics of a 3-parallel serpentine are superior to those of a 1-parallel serpentine, but water at Membrane Electrode Assembly (MEA) was not removed, regardless of the flow field type.

강우침투실험을 통한 불포화 풍화토 지반의 강우 침투속도 분석 (Analysis of Seepage Velocity in Unsaturated Weathered Soils Using Rainfall Infiltration Test)

  • 김훈;신호성;김윤태;박덕근;민덕기
    • 한국지반공학회논문집
    • /
    • 제28권2호
    • /
    • pp.71-78
    • /
    • 2012
  • 본 연구에서는 실내 강우침투실험을 통하여 강우강도에 따른 지반 내 침투속도를 산정하였으며, 침투특성을 분석하여 보았다. 또한 수치해석을 이용한 해석결과와 비교 검증을 수행하였으며, 시간에 따른 간극수압과 포화도 그리고 유출속도의 변화는 대체로 잘 일치함을 보였다. 강우강도에 따른 침투속도는 실내실험과 수치해석에서 선형적으로 증가하는 경향을 나타냈으며, 강우강도가 지반의 포화투수계수에 근접시 침투속도가 급격히 증가하였다. 또한 강우 침투시 습윤전선의 상부는 부분적으로 포화되어 침투하는 경향을 보였다. 따라서 실제 지반에서 습윤전선은 비교적 빠르게 진행하여 사면의 불안정을 초래할 것으로 판단된다.

Soft Plasma Flash X-ray Generator Utilizing a Vacuum Discharge Capillary

  • Sato, Eiichi;Hayasi, Yasuomi;Usuki, Tatsumi;Sato, Koetsu;Takayama, Kazuyoshi;Ido, Hideaki
    • 한국의학물리학회:학술대회논문집
    • /
    • 한국의학물리학회 2002년도 Proceedings
    • /
    • pp.400-403
    • /
    • 2002
  • The fundamental experiments for measuring soft x-ray characteristics from the vacuum capillary are described. These experiments were primarily performed in order to generate line spectra such as x-ray lasers. The generator consists of a high-voltage power supply, a polarity-inversion ignitron pulse generator, a turbo-molecular pump, and a radiation tube with a capillary. A high-voltage condenser of 200 nF in the pulse generator is charged up to 20 kV by the power supply, and the electric charges in the condenser are discharged to the capillary in the tube after closing the ignitron. During the discharge, weakly ionized plasma forms on the inner and outer sides of a capillary. In the present work, the pump evacuates air from the tube with a pressure of about 1 mPa, and a demountable capillary was developed in order to measure x-ray spectra according to changes in the capillary length. In this capillary, the anode (target) and cathode elements can be changed corresponding to the objectives. The capillary diameter is 2.0 mm, and the length is adjusted from 1 to 50 mm. When a capillary with aluminum anode and cathode electrodes was employed, both the cathode voltage and the discharge current almost displayed damped oscillations. The peak values of the voltage and current increased when the charging voltage was increased, and their maximum values were -10.8 kV and 4.7 kA, respectively. The x-ray durations observed by a 1.6 ${\mu}$m aluminum filter were less than 30 ${\mu}$s, and we detected the aluminum characteristic x-ray intensity using a 6.8 ${\mu}$m aluminum filter. In the spectrum measurement, two sets of aluminum and titanium electrodes were employed, and we observed multi-line spectra. The line photon energies seldom varied according to changes in the condenser charging voltage and to changes in the electrode element. In the case where the titanium electrode was employed, the line number decreased with corresponding decreases in the capillary length. Compared with incoherent visible light, these rays from the capillary were diffracted and diffused greatly after passing through two slits.

  • PDF

단위유량도와 비수갑문 단면 및 방조제 축조곡선 결정을 위한 조속계산 (Calculation of Unit Hydrograph from Discharge Curve, Determination of Sluice Dimension and Tidal Computation for Determination of the Closure curve)

  • 최귀열
    • 한국농공학회지
    • /
    • 제7권1호
    • /
    • pp.861-876
    • /
    • 1965
  • During my stay in the Netherlands, I have studied the following, primarily in relation to the Mokpo Yong-san project which had been studied by the NEDECO for a feasibility report. 1. Unit hydrograph at Naju There are many ways to make unit hydrograph, but I want explain here to make unit hydrograph from the- actual run of curve at Naju. A discharge curve made from one rain storm depends on rainfall intensity per houre After finriing hydrograph every two hours, we will get two-hour unit hydrograph to devide each ordinate of the two-hour hydrograph by the rainfall intensity. I have used one storm from June 24 to June 26, 1963, recording a rainfall intensity of average 9. 4 mm per hour for 12 hours. If several rain gage stations had already been established in the catchment area. above Naju prior to this storm, I could have gathered accurate data on rainfall intensity throughout the catchment area. As it was, I used I the automatic rain gage record of the Mokpo I moteorological station to determine the rainfall lntensity. In order. to develop the unit ~Ydrograph at Naju, I subtracted the basic flow from the total runoff flow. I also tried to keed the difference between the calculated discharge amount and the measured discharge less than 1O~ The discharge period. of an unit graph depends on the length of the catchment area. 2. Determination of sluice dimension Acoording to principles of design presently used in our country, a one-day storm with a frequency of 20 years must be discharged in 8 hours. These design criteria are not adequate, and several dams have washed out in the past years. The design of the spillway and sluice dimensions must be based on the maximun peak discharge flowing into the reservoir to avoid crop and structure damages. The total flow into the reservoir is the summation of flow described by the Mokpo hydrograph, the basic flow from all the catchment areas and the rainfall on the reservoir area. To calculate the amount of water discharged through the sluiceCper half hour), the average head during that interval must be known. This can be calculated from the known water level outside the sluiceCdetermined by the tide) and from an estimated water level inside the reservoir at the end of each time interval. The total amount of water discharged through the sluice can be calculated from this average head, the time interval and the cross-sectional area of' the sluice. From the inflow into the .reservoir and the outflow through the sluice gates I calculated the change in the volume of water stored in the reservoir at half-hour intervals. From the stored volume of water and the known storage capacity of the reservoir, I was able to calculate the water level in the reservoir. The Calculated water level in the reservoir must be the same as the estimated water level. Mean stand tide will be adequate to use for determining the sluice dimension because spring tide is worse case and neap tide is best condition for the I result of the calculatio 3. Tidal computation for determination of the closure curve. During the construction of a dam, whether by building up of a succession of horizontael layers or by building in from both sides, the velocity of the water flowinii through the closing gapwill increase, because of the gradual decrease in the cross sectional area of the gap. 1 calculated the . velocities in the closing gap during flood and ebb for the first mentioned method of construction until the cross-sectional area has been reduced to about 25% of the original area, the change in tidal movement within the reservoir being negligible. Up to that point, the increase of the velocity is more or less hyperbolic. During the closing of the last 25 % of the gap, less water can flow out of the reservoir. This causes a rise of the mean water level of the reservoir. The difference in hydraulic head is then no longer negligible and must be taken into account. When, during the course of construction. the submerged weir become a free weir the critical flow occurs. The critical flow is that point, during either ebb or flood, at which the velocity reaches a maximum. When the dam is raised further. the velocity decreases because of the decrease\ulcorner in the height of the water above the weir. The calculation of the currents and velocities for a stage in the closure of the final gap is done in the following manner; Using an average tide with a neglible daily quantity, I estimated the water level on the pustream side of. the dam (inner water level). I determined the current through the gap for each hour by multiplying the storage area by the increment of the rise in water level. The velocity at a given moment can be determined from the calcalated current in m3/sec, and the cross-sectional area at that moment. At the same time from the difference between inner water level and tidal level (outer water level) the velocity can be calculated with the formula $h= \frac{V^2}{2g}$ and must be equal to the velocity detertnined from the current. If there is a difference in velocity, a new estimate of the inner water level must be made and entire procedure should be repeated. When the higher water level is equal to or more than 2/3 times the difference between the lower water level and the crest of the dam, we speak of a "free weir." The flow over the weir is then dependent upon the higher water level and not on the difference between high and low water levels. When the weir is "submerged", that is, the higher water level is less than 2/3 times the difference between the lower water and the crest of the dam, the difference between the high and low levels being decisive. The free weir normally occurs first during ebb, and is due to. the fact that mean level in the estuary is higher than the mean level of . the tide in building dams with barges the maximum velocity in the closing gap may not be more than 3m/sec. As the maximum velocities are higher than this limit we must use other construction methods in closing the gap. This can be done by dump-cars from each side or by using a cable way.e or by using a cable way.

  • PDF