Interior Noise Characteristics of the Electric Trains in Gyeongchun Line (경춘선 전동열차의 실내 소음 특성)

  • Ann, Yong Chan;Lee, Jung Hyeok;Kim, Seock Hyun
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.38 no.7
    • /
    • pp.817-822
    • /
    • 2014
  • Since the opening of the double-track railway for the Gyeongchun local electric train and the semi-high speed train ITX, floating population between Seoul and Chuncheon has rapidly increased. This is attributable to the competitiveness of the railway service in terms of punctuality and safety of operation, mass transportation and low fare. However, many passengers have expressed strong dissatisfaction and displeasure towards the interior noise and its high rate of increase, particularly in tunnel sections. In this study, the interior noise characteristics of Gyeongchun local electric train and ITX were analyzed and compared. Noise levels, frequency spectrum and sound quality indices were compared for the open land, tunnel and bridge. Finally, from the noise levels depending on the location in the vehicle compartment, the noise transmission path was determined and a basic strategy for reducing the interior noise was developed.

An Experimental Study for Longitudinal Resistance of Ballast Track on Bridge (교량 상 자갈궤도의 종저항력 측정을 위한 실험 연구)

  • Min, Kyung-Hwan;Yun, Kyung-Min
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.5
    • /
    • pp.173-178
    • /
    • 2016
  • When a ballast track of a high-speed train is constructed on a bridge, the displacement of the bridge decks can occur because they are not fixed to the rails. Moreover, relative displacements occur between the bridge and rails caused by temperature changes and external loads. The current longitudinal resistance criteria (UIC Code 774-3, KR C-08080) on ballast tracks with continuous welded rails (CWRs) do not take into account the longitudinal movement of the bridge and the frictional force between the ballast and slabs. In addition, the magnitude of the longitudinal resistance, k, is calculated somewhat conservatively and, (therefore?) it acts as an unfavorable element in the design of long span and continuous railway bridges. Thus, in order to replicate the actual behavior more effectively, the longitudinal resistance of CWRs should take into account the additional rigidity between the slab and track. In this study, the longitudinal resistances of the ballasted track on the bridge were analyzed by carrying out an experimental study with a test setup designed to simulate the deck and bed track. In the test results, the maximum longitudinal resistances of the tests were similar to the resistances of the current codes, however, the measured longitudinal stiffness designed to limit the displacement of the tests were much smaller in comparison with the longitudinal stiffness on the codes.

Development of Reliability-Based Optimum Design of High-Speed Railway Bridges Considering Structure-Rail Longitudinal Interaction and Structure-Vehicle Interaction Using Heuristic Decision Method (Heuristic Decision Method를 이용하여 구조물-궤도 종방향 상호작용 및 구조물-차량 상호작용을 고려한 고속철도 교량의 신뢰성 최적설계 기법 개발)

  • Ihm, Yeong-Rok
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.10 no.3
    • /
    • pp.31-38
    • /
    • 2010
  • In this study, it is suggested that it has to reliability-based design methodology with respect to bridge structure-rail longitudinal interaction and bridge structure-vehicle interaction. For the structural analysis, commercial package, ABAQUS, are used for a three-dimensional finite element analysis. The optimization process utilizes a well-known optimizer, ADS(Automated Design Synthesis). Optimization technique is utilized the ALM-BFGS method for global area search and Golden Section Method for 1-D search. In general, ALM-BFGS method don't need the 1-D search, and that algorithm converge a 0.1~0.2 of Push-Off factor. But in this study, value of Push-Off factor is used 90, therefore 1-D search should be needed for effective convergency. That algorithm contains the "heuristic decision method". As a result of optimum design of 2-main steel girder birdge with 5${\times}$(1@50m), design methodology suggested in this study was demonstrated more economic and efficient than existing design and LCC optimization not considering bridge-rail longitudinal interaction and bridge-vehicle interaction.

Dynamic analysis of bridge girders submitted to an eccentric moving load

  • Vieira, Ricardo F.;Lisi, Diego;Virtuoso, Francisco B.
    • Structural Engineering and Mechanics
    • /
    • v.52 no.1
    • /
    • pp.173-203
    • /
    • 2014
  • The cross-section warping due to the passage of high-speed trains can be a relevant issue to consider in the dynamic analysis of bridges due to (i) the usual layout of railway systems, resulting in eccentric moving loads; and (ii) the use of cross-sections prone to warping deformations. A thin-walled beam formulation for the dynamic analysis of bridges including the cross section warping is presented in this paper. Towards a numerical implementation of the beam formulation, a finite element with seven degrees of freedom is proposed. In order to easily consider the compatibility between elements, and since the coupling between flexural and torsional effects occurs in non-symmetric cross-sections due to dynamic effects, a single axis is considered for the element. The coupled flexural-torsional free vibration of thin-walled beams is analysed through the presented beam model, comparing the results with analytical solutions presented in the literature. The dynamic analysis due to an eccentric moving load, which results in a coupled flexural-torsional vibration, is considered in the literature by analytical solutions, being therefore of a limited applicability in practice engineering. In this paper, the dynamic response due to an eccentric moving load is obtained from the proposed finite element beam model that includes warping by a modal analysis.

A Study on the Pile Material Suited for Pile Supported Embankment Reinforced by Geosynthetics (토목섬유로 보강된 성토지지말뚝 구조에 적합한 말뚝재료의 개발)

  • Choi, Choong-Lak;Lee, Kwang-Wu;Kim, Eun-Ho;Jung, Ji-Won
    • Journal of the Korean Geosynthetics Society
    • /
    • v.15 no.1
    • /
    • pp.21-35
    • /
    • 2016
  • It is a current trend that the concrete track is applied for high speed railway. In the case of the railway embankment constructed on soft ground, the damage to concrete track which is sensitive to settlement such as distortion and deflection could be caused by very small amount of long term settlement. Pile Supported Embankment method can be considered as the effective method to control the residual settlement of the railway embankment on soft ground. The Geosynthetics is used inside of the embankment to maximize the arching effect transmitting the load of the embankment to the top of the piles. But, PHC piles that are generally used for bridge structures are also applied as the pile supporting the load of embankment concentrated by the effect of the Geosynthetics. That is very low efficiency in respect of pile material. So, in this study, the cast in place concrete pile was selected as the most suitable pile type for supporting the embankment by a case study and the optimum mixing condition of concrete using a by-product of industry was induced by performing the mixing designs and the compressive strength designs. And it is shown that the cast in place pile with the optimum mixing condition using the by-product of industry is 2.8 times more efficient than the PHC pile for the purpose of Pile Supported Embankment by the finite element analysis method.

Mapped relationships between pier settlement and rail deformation of bridges with CRTS III SBT

  • Jiang, Lizhong;Liu, Lili;Zhou, Wangbao;Liu, Xiang;Liu, Chao;Xiang, Ping
    • Steel and Composite Structures
    • /
    • v.36 no.4
    • /
    • pp.481-492
    • /
    • 2020
  • To study the rail mapped deformation caused by the pier settlement of simply - supported bridges with China Railway Track System III (CRTS III) slab ballastless track (SBT) system under the mode of non-longitudinal connection ballastless track slab, this study derived an analytical solution to the mapped relationships between pier settlement and rail deformation based on the interlayer interaction mechanism of rail-pier and principle of stationary potential energy. The analytical calculation results were compared with the numerical results obtained by ANSYS finite element calculation, thus verifying the accuracy of analytical method. A parameter analysis was conducted on the key factors in rail mapped deformation such as pier settlement, fastener stiffness, and self-compacting concrete (SCC) stiffness of filling layer. The results indicate that rail deformation is approximately proportional to pier settlement. The smaller the fastener stiffness, the smoother the rail deformation curve and the longer the rail deformation area is. With the increase in the stiffness of SCC filling layer, the maximum positive deformation of rail gradually decreases, and the maximum negative deformation gradually increases. The deformation of rail caused by the pier settlement of common-span bridge structures will generate low-frequency excitation on high-speed trains.

Analytical Behavior of Concrete Derailment Containment Provision(DCP) according to Train Impact Loading (열차 충돌하중에 대한 콘크리트 일탈방호시설물(DCP)의 해석적 거동 검토)

  • Yi, Na-Hyun;Kim, Ji-Hwan;Kang, Yun-Suk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.11
    • /
    • pp.604-613
    • /
    • 2018
  • In recent years, numerous train derailment accidents caused by deterioration and high speed technology of railways have increased. Guardrails or barriers of railway bridges are installed to restrain and prevent the derailment of the train body level. On the other hand, it can result in a high casualties and secondary damage. Therefore, a Derailment Containment Provision (DCP) within the track at the wheel/bogie level was developed. DCP is designed for rapid installation because it reduces the impact load on the barrier and inertia force on the steep curve to minimize turnover, fall, and trespass on the other side track of the bridge. In this paper, DCP was analyzed using LS-Dyna with a parameter study as the impact loading location and interface contact condition. The contact conditions were analyzed using the Tiebreak contact simulating breakage of material properties and Perfect bond contact assuming fully attached. As a result, the Tiebreak contact behaved similarly with the actual behavior. In addition, the maximum displacement and flexural failure was generated on the interface and DCP center, respectively. The impact analysis was carried out in advance to confirm the DCP design due to the difficulties of performing the actual impact test, and it could change the DCP anchor design as the analysis results.