• Title/Summary/Keyword: Height Plan

Search Result 361, Processing Time 0.03 seconds

A study on the suitable of building size in district units plan (지구단위계획(地區單位計劃)에서 건축(建築) 규모설정(規模設定)에 관한 연구(硏究))

  • Lee, Won-Geun;Lee, Jae-Kook;Do, Gyu-Hwan
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.3 no.1
    • /
    • pp.39-49
    • /
    • 2003
  • The height provisions, by the urban planning, describe the hightest height per width division, also define oblique line limitation by road without mentioning the highest per width division. Therefore this study will be a basic model for the standard of measuring the highest height per width division analysizing the propriety of current standard of oblique limitation. This technique is prepared to prevent the confusion and to complements the existing planning method. Therefore, it takes more time to establish this new method and to apply it to the existing condition. This study reviewed density control in District Units Plan, based on the guidelines of density, which included height, ratio of total floor to ground area, and land distribution. This study aims to provide efficient analysis by using current oblique limitation provisions Thus, proving the area rations of general residential areas are decreasing. Since the purpose of the District Units Plan is to avoid confusion and help ease the existing problematic conditions which have risen from the two above-mentioned conventional systems, further observation and research on these areas are necessary.

  • PDF

A Study on the Architectural Design Characteristics of the Plan and the Structure in Sudeok Temple's Daeung-Jean (건축설계 측면에서 본 수덕사 대웅전의 평면과 가구 특성에 관한 연구)

  • Kim, Do-Kyoung
    • Journal of architectural history
    • /
    • v.17 no.4
    • /
    • pp.97-112
    • /
    • 2008
  • In this study, I attempted to the architectural design characteristics of Daeung-Jeon in Sudeok Temple. For this purpose, After I set up several assumptions in the basis of the general characteristics of Korean wood architecture, and then, analyzed floor plan, structural formation and section sizes of structure and bracket members in relation to module and unit. As the results, the characteristics of the design process of plan and structure are follows. (1) 1 ja(尺), the unit applied to this building is measured $307.6{\sim}318.3mm$) and the average is 312.9mm (2) It is estimated that the floor plan designed on the basis of the top of columns. By the applied unit, every bay of the front side and the side is each designed by 15 ja and 8.5 ja. (3) The section is composed of piled members which have same section size. As basic module of section size called 'jae(재;材)', it is estimated at width 0.45 ja by height 0.75 ja. And as the secondary module, height between jae and is called 'gyoe(계;)' and it wes designed by three height size of 0.25 ja, 0.27 ja and 0.30 ja, (4) It is estimated that the section plan was designed by the order as follows. Firstly, the horizontal position of purlins wes decided on the basis of the intersection point of long and short rafters, and then the position and the section size of purlins and jangheyo(長舌) wes decided on the basis of the slope of roof and rafters. Secondly, going down from purlins, the members of structure composed of 'jae' and 'gyoe' was repeated. Lastly, for the purpose of linking the structure members located on the center line of adjacent purlins organically, the height of whaban(화반) was controlled.

  • PDF

Equations to evaluate fundamental period of vibration of buildings in seismic analysis

  • Sangamnerkar, Prakash;Dubey, S.K.
    • Structural Monitoring and Maintenance
    • /
    • v.4 no.4
    • /
    • pp.351-364
    • /
    • 2017
  • In this study effects of various parameters like a number of bays, the stiffness of the structure along with the height of the structure was examined. The fundamental period of vibration T of the building is an important parameter for evaluation of seismic base shear. Empirical equations which are given in the Indian seismic code for the calculation of the fundamental period of a framed structure, primarily as a function of height, and do not consider the effect of number of bays and stiffness of the structure. Building periods predicted by these expressions are widely used in practice, although it has been observed that there is scope for further improvement in these equations since the height alone is inadequate to explain the period variability. The aim of this study is to find the effects of a number of bays in both the directions, the stiffness of the structure and propose a new period equation which incorporates a number of bays, plan area, stiffness along with the height of the structure.

Comparing floor height reduction effect of slim floor system with square steel pipe (각형강관을 이용한 슬림플로어 시스템의 층고절감효과 비교)

  • Cho, Youn-Jin;Rhim, Hong-Chul;Kim, Dae-You;Lyu, Seung-Il;Kim, Do-Kyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.56-57
    • /
    • 2017
  • In recent years, new construction methods have been required to reduce the construction cost and increase the available area in an environment where construction work is frequently performed in a narrow urban area like Korea. As a result of these studies, slim floor composite beam has been suggested. Slim floor composite beam can reduce required depth because web of steel beam is embedded in the slab, so it is effective to reduce floor height and increase the available area. The purpose of this study is the floor height reduction evaluation by comparing system consisting of reinforced concrete, steel, and slim floor using square-shape steel pipe. After doing structural design for a typical plan, checked effectiveness by comparing each design plan. It is proven that slim floor composite beam can reduce required depth effectively comparing required materials of other system.

  • PDF

Improvement of fishing efficiency of Danish seine to ratio of buoyancy by sinking force (부력조정에 의한 외끌이기선저인망의 어획성능 개선)

  • Lee, Hye-Ok;Lee, Ju-Hee;Kwon, Byeong-Guk;Kim, Bu-Yeong;Kim, Byung-Soo;Yoo, Je-Bum
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.43 no.2
    • /
    • pp.87-100
    • /
    • 2007
  • This study was carried out to offer fundamental data for improving the fishing efficiency of the Danish seine. The net height and the shape in the water was measured to analyze the efficiency of the existing Danish seine. And then, an improved fishing gear was developed based on the results and was tested in the field. Measuring devices were attached on center of a ground rope and a head rope. The net height is the spread distance between the ground rope and the head rope, which was measured on the different ratio of buoyancy. The results are obtained as follows. The net height estimated from the design plan of horizontal hanging ratio 0.40 in the existing Danish seine A and B estimated both 4.94m. The net height of the existing Danish seine A and B was respectively 1.8m and 2.3m, which form 36.4% and 46.2% of the net height estimated from the design plan. Buoyancy was changed as 79.5% and 96.2% relative to the sinking force in the existing Danish seine. The net height of 79.5% was 3.95m which increased to 80% of the estimated net height. The other shows the same result with the first case. It is not necessarily that the high buoyancy/sinking force ratio make the high net height, 80% is adequate as the buoyancy/sinking force ratio. In case of the improved Danish seine, the mean net height was about 5.0m, means 58.3% of estimated net height 8.58m.

The Preliminary Design Guideline for Tall Building: Exploration of Planning Factors & Building Factors

  • Choi, Yong Sun
    • Architectural research
    • /
    • v.4 no.1
    • /
    • pp.1-6
    • /
    • 2002
  • Every year new tall buildings are being conceived, designed, and built with new schemes. Thus it is important to explore the factors that affect tall building design. Thus it is important to explore the tall building design factors. The planning and design of tall buildings require different criteria than those that exist in regular size buildings. Tall buildings are uniquely expressed by their structural systems where exterior esthetic and requirements of space drive the form and composition of the structural systems. Therefore the exploration of design factors is the key to achieve optimum building systems. Optimization as mentioned here is associated with the efficiency of the different building systems. To achieve an optimal system, there is a need for an understanding of the factors that affect on overall tall building design such as planning module, building function, lease span, floor-to-floor-height, building height (aspect ratio), structural system, environmental systems. In this paper a statistical approach will be used and will be based on data collected from the practice through a rigorous survey taken. This information is tabulated and analyzed. The major target of investigation will be lease span related to space requirement in the tall building planning. Factors related to lease spans, such as function, floor-to-floor height, planning module, building height, overall plan dimension, and plan ratio (building geometry), will be looked at carefully. IN conclusion, this approach of optimization can introduce a preliminary design guideline for tall building projects. The purpose of the paper should shed some light on the optimum tall building design criteria.

The Plan & Design for Through Plate Girder Bridge of Variable Section (변단면 하로판형교의 계획 및 설계)

  • Min, Young-Taek;Kim, Sung-Yeol;Ko, Seung-Young;Kim, Young-Sang
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.530-537
    • /
    • 2006
  • Recently, the railroad route plan is trying to minimize the damage of the local resident which is caused by railroad construction. For this reason, reducing the banking height of soil roadbed, lowering the bridge girder height of a solid intersection and a part of cross river, the through bridge type which can achieve a required span length must apply. The representative through bridges of railroad are arch bridges, truss bridges and plate girder bridges, the through plate girder bridge of variable section can apply that the span length of these bridges is about $30{\sim}50m$, namely, middle span length bridge types, and that can satisfy structural capacity and beauty of railroad at the same time. This paper introduces plan and design process of the Su-eo cheon bridge applied by a through plate girder bridge type of the Jinju-Gwangyang double track 6th construction ordered at Korea Rail network Authority in 2005.

  • PDF

Improvement of Flood Disaster Mitigation on Long-term Development Plan (장기개발계획상의 방재제도 개선)

  • 고영찬;오남선
    • Journal of Korean Port Research
    • /
    • v.15 no.1
    • /
    • pp.107-119
    • /
    • 2001
  • Disaster mitigation, especially as a concept similar to damage mitigation caused by heavy rainfalls and flood is closely related to long-term development plan. This plan of an harbor area where is located in lower region is established and carried under consideration of disaster mitigation concept such as internal drainage and so on. Flood damage is somewhat predictable in accordance with height, stream and rainfall characteristics of the region. Therefore it is necessary to establish national and urban plan under consideration of this fact. But this consideration of existing regulation and institution is insufficient and improvement of regulation and institution is needed. This consideration of disaster mitigation fields is regulated declaratively and inclusively in national plan which is established in broad region, and specifically and detailedly in urban plan which is established in narrow region. The program to improve regulation and institution is proposed in order to consider disaster mitigation fields as a level of this plan.

  • PDF

A Planting Plan of Buffer-Forest Belts on the Waste Landfill Sites -In the Case of the Boundary Area at the SUDOKWON Landfill Site- (폐기물매립지 완층수림대 식재계획 사례연구 -수도권매립지 경계지역을 대상으로-)

  • Cho, Ju-Hyoung;Choi, Mi-Jin
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.5 no.5
    • /
    • pp.58-66
    • /
    • 2002
  • We present a planting plan of the buffer-forest belts created at the boundary area of the waste landfill site which is located in the coastal area of Kyubg-Gi province. In order to form a proper section of ground soil excavated from the sea and a forest which shows a distinction of the vegetation stratification, the planting plan with trees, sub-trees, shrubs, and seedlings (produced at a sprout cultivation place) is devised with an adjustment of planting density. 1. The preparation of mounding is required for planting at a waste landfill site. We first estimate an economical and efficient banking height together with the quantity of soil, and prepare a planting ground with excavated ground soil for the consideration of soil recycling. On the planting ground a banking with a height of 1.5-2m is produced by self-supported soil, playing a role in a salt blocking and an irritation layer of planting. Finally, an additional banking with a height of 2m is produced by qualified vegetation soil, forming a vegetation section with a total height of 6m. 2. Since the planning site is located in the border, the planting area is composed of two regions : one is an inclined face (slope 1 : 3) toward the inside of the landfill site and the other is an inclined face (slope 1 : 4) toward the inland. The buffer planting in the former (latter) region consists of wind break forest (mixed-landscape forest) within a width of less than 35m. 3. Based on the data obtained from the literatures and the investigation of local plants, we choose the 21 plant species (such as Pinus thunbergii, Pinus densiflora, Sorbus alnifolia, Albizzia julibrissin and etc.) and the additinal 7 species which are grown at a sprout cultivation palce of the SUDOKWON landfill site (Rosa rugosa, Quercus acutissima, Prunus armeniaca var. ansu., and etc.). Sub-trees with a height of above 2.5m and seedlings are planted with an interval of $1.5{\times}1.5m$ ($0.45roots/m^2$) and $0.5{\times}0.5m$ ($4roots/m^2$), respectively. Here, both trees exhibit communities planting with more than three rows. Shrubs are planted with $9-16roots/m^2$, depending on their size. Since this case study provides a reference of the planting beds as well as a planting plan at the SUDOKWON landfill site, it is not sufficient for the present plan to be utilized for the formation of buffer-forest belts which are used for the analysis of environmental factor and the reduction of environmental pollutants in the sea waste landfill site. Thus, further studies with the ecological basis are demanded for the environment planting restoration in the sea waste landfill site.

Drone Image Quality Analysis According to Flight Plan

  • Park, Joon Kyu;Lee, Keun Wang
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.39 no.2
    • /
    • pp.81-91
    • /
    • 2021
  • Drone related research has been increasing recently due to the development and distribution of commercial unmanned aerial vehicles. However, most of the previous studies focused on the accuracy and utility of drone surveying. For drones, the resolution of the result is determined according to the flight altitude, but since 70% of Korea is mountainous, it is necessary to analyze the quality of the drone image according to the flight plan. In this study, the quality of drone photogrammetry results according to flight plans was analyzed. The flight plan was established by fixed altitude and considering the height of the terrain. Images were acquired for both cases and data was processed to generate ortho images. As a result of evaluating the accuracy of the generated ortho image, the accuracy was found to be -0.07 ~ 0.09m. The accuracy of Case I and Case II did not show a significant difference, but for RMSE, Case I showed a good value. These results indicate that the drone flight plan affects the quality of the results. Also, when flying at a fixed altitude, II showed a lower value than the originally set overlap according to the altitude of the object. In future surveys using drones, flight planning taking into account the height of the object will contribute to the improvement of the quality of the results.