• Title/Summary/Keyword: Headways

Search Result 35, Processing Time 0.026 seconds

A Design of a Simulation Apparatus for the Control of the Personal Rapid Transit(PRT) Vehicles (소형궤도 차량 제어를 위한 모의실험 장치 설계)

  • Lee, Jun-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.11
    • /
    • pp.2001-2005
    • /
    • 2008
  • This paper presents a design of a simulation apparatus to evaluate an operational control algorithm for the PRT system. PRT systems require very short headways to increase the line capacity and a very reliable vehicle control algorithm for avoidance of the impact between vehicles. Therefore, it can be said that the development of an reliable operational control algorithm for the PRT systems is much more important than that of the hardware configurations. In this paper an apparatus is proposed which is composed of virtual vehicles, a central control system, a man-machine interface and monitoring device, making it possible for the designed operational control algorithm to be implemented and tested. For the test of the proposed apparatus a test operational control algorithm is designed and the experimental results show the effectiveness of the proposed simulation apparatus for test and evaluation of the PRT operational control algorithms.

Control of the Operational Vehicles for Personal Rapid Transit System (개인고속이동 시스템의 차량운행에 대한 제어)

  • Lee, Jun-Ho
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2008.04a
    • /
    • pp.947-950
    • /
    • 2008
  • PRT(Personal Rapid Transit) systems requires very short headways to increase the line capacity and a very reliable vehicle control algorithm for avoidance of the impact between vehicles. In this paper a brake curves (or speed patterns) for PRT system that make it possible the effective vehicle control and a collision avoidance algorithm are introduced. For the simulations and the evaluations of the proposed algorithm a combined simulation platform that consists of Labview Simulation Interface Toolkit and Matlab/Simulink and a specific hardware configuration are employed.

  • PDF

A Study on the Control a Group of Trains for Energy Saving by Synchronized Driving (동기화 운전을 통한 에너지 절약형 열차군 관리에 관한 연구)

  • Kim, Kyung-Min
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1159-1165
    • /
    • 2010
  • This paper describes an energy efficient train control. In these days, the researchers develop the energy efficient railway technologies, such as energy storage system, energy efficient driving. Mass rapid transit (MRT) railways, which are an important means of public transportation in urban areas, have operational characteristics that include short headways, frequent departures and arrivals. Therefore, when multiple trains are operating in the same power supply system, it is important to synchronize the energy tractions and regenerations. This paper define the group of trains for energy saving according to a power supply. We analyze the current synchronized driving situations and estimate the effect.

  • PDF

Headway Analysis in Daejeon Nord section(Daejeon shunting yard-Daejeon station) which high speed train and conventional trains will be run (대전북(대전 조차장-대전역) 고속전철 연계 운행 구간의 운전시격 분석)

  • Kim, Yong-Gyu;Kim, Jong-Gi;Yu, Chang-Geun
    • Proceedings of the KIEE Conference
    • /
    • 2003.11c
    • /
    • pp.810-813
    • /
    • 2003
  • The present headway on KNR(Korea National Railway) lines varies from 6 to 10 minutes depending on the each line and by the operation of High Speed line in 2004, the bottleneck would be expected within a few sections such as Daejeon-Daejeon shunting yard which will be the common mute between KTX(Korea Train Express) and conventional trains. Therefore, KNR would like to reduce the headway of the all lines by 4 minutes with the implementation of ERTMS/ETCS on-board system. Where ETCS(European Train Control system), the subsystem of ERTMS, is Automatic Train Protection system for safety train running. This study will be analyze expected braking distance and running time depending on characteristics of conventional passenger and freight trains and high speed train will be operated within electrified conventional line for comparing the headways of ATS(Automatic Train Stop) system and ETRMS/ETCS system within the Daejeon-Daejeon shunting yard section.

  • PDF

A Simple Methodology for Estimating the Capacity of Multi-lane Smart Tolling (다차로 톨링시스템(SMART Tolling)의 용량추정 방법에 대한 연구)

  • Choi, Keechoo;Lee, Jungwoo;Park, Sangwook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.4D
    • /
    • pp.305-311
    • /
    • 2012
  • With the rapid deployment of hipass$^{(R)}$, the congestion is inevitable due to the operation of the hipass lane system. Recently, SMART Highway project have developed a multi-lane mainline tolling system, called SMART Tolling system. To analyze the effectiveness of the system in terms of capacity, this study tries to estimate the capacity and its improvement of multi-lane tolling system based on current hipass$^{(R)}$ data. The methodology uses the saturation time headway. This follows three steps; 1) estimate the saturation time headway, using hipass$^{(R)}$ data, and capacity. 2) estimate two factors (the first one is dividing the one side lane width and lateral clearance factor ($f_w$) into two side one, the second one is dividing the capacity of hipass lane operating a circuit breaker into the capacity of hipass lane not operating, the last one is increasing factor of lane width). 3) calculate the capacity of multi-lane mainline tolling system. The results of method produced 2172~2187 veh/hour as smart tolling capacities, respectively. Those are higher about 370 veh/hour than the values from existing literature reviews. Additionally, saturation time headways were identified as lower by 0.5 seconds/veh than existing headways based on hi-pass$^{(R)}$ based one, which naturally implies the improvement in capacity. Some limitations and future research agenda have also been discussed.

An Iterative Linear Approximation Algorithm for a Unified Model of Traffic Assignment and Line Planning in Railway Networks (통행배정-노선계획 통합 모형을 위한 선형 근사화 알고리듬 개발)

  • Park, Bum Hwan
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.2
    • /
    • pp.140-147
    • /
    • 2014
  • Line planning is an important step to determine the optimal frequencies of trains given the forecasted demand for each train type. The main input data for line planning is the leg traffic demand which can be derived using suitable traffic assignment models. However most assignment models require a line plan, in other words, train frequencies or headways, so that inconsistent results just by the procedural approach to find an optimal line plan after determining leg traffic can be avoided. This paper suggests a unified model that can consider the traffic assignment and line planning, simultaneously. We further provide an elaborated approximation algorithm and, finally, provide experimental results determined for the Korean railway network.

A primary study of Rail Station Selection and Train Operation Management Plan with Transportation Demand (철도수송수요를 고려한 정차역 선정과 열차운행방안 -경부선 서울~조치원구간을 중심으로-)

  • 문대섭;정병현
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.80-87
    • /
    • 2001
  • The purposes of this primary study are the selection of rail station and train operation management techniques for express-rail operation service at the convectional railway electrification. For these analyses, we used the KNR statistics and KROIS data of rail stations and train users by rail line. Therefore, we chose the important stations for express-rail operation of Kyongbu conventional rail line (esp. Seoul-Jochiwon section) through the rail transportation demand. and then, suggested primary operational management plan thorough the effects analyses of decreasing total travel time and increasing transportation demand by train speed-up. This study has some bounds and limits for proceeding, as it does, we excluded as followings: the conditionals of fate system, headways and train diagram, economic/financial analysis and technological assessment, and other railway technological infrastructures and a certain railcar specification, etc. . We propose to enlarge this study into a feasibility study of express or skip-stop operation service and compatible vehicle system decision considering with the best possible investment rail line, furthermore. in front of Kyongbu (Seoul-Busan) high-speed rail open in 2004, we have to try to progress the efficiencies of railway operation applying various train operation management plan.

  • PDF

Study on Capacity Analysis Methodology for Riverside Bike-Exclusive Road (하천변 자전거도로의 용량 분석 방법론 연구)

  • Jeon, Woo Hoon;Lee, Young-Ihn;Yang, Inchul
    • International Journal of Highway Engineering
    • /
    • v.18 no.6
    • /
    • pp.69-76
    • /
    • 2016
  • OBJECTIVES : The objective of this study is to propose a capacity analysis methodology for riverside bike-exclusive roads. METHODS : Three steps were performed to develop a methodology to estimate bikeway capacity. First, we reviewed previous studies on the vehicle-road capacity analysis and proposed their applicability to bikeways. Second, two assumptions were made based on the traffic flow characteristics of bikeways: (1) the capacitated state in bikeways occur within a bicycle platoon, and (2) a bicycle platoon consists of more than three bicycles running in close proximity. In addition, it is assumed that the mean time headway of a bicycle platoon represents the characteristics of the platoon. The normality of the mean-time headway of a bicycle platoon calculated using the central limit theorem leads to the development of a method that estimates the riverside bikeway capacity using data collected from two different riverside bike-exclusive roads (Han-river and Anyangcheon). We used a location-fixed video camera to record videos of running bicycles and wrote a special-purpose software program to code the time-headway data from the videos. RESULTS : Time headways from 189 bicycle platoons were analyzed. The estimated mean-time headway of the capacitated bicycle flow is 1.01 s, from which the capacity of the bikeway is found to be 3578 vehicles/h. CONCLUSIONS : The proposed method that estimates bikeway capacity could be applicable to the analysis of short-range congested area rather than planning the number of lanes. In other words, it determines the sections that are temporarily highly congested and proposes appropriate strategies to mitigate the congestion.

A Development of Multi-Period Bus Scheduling Model (다시간대에 대한 버스 스케줄링 모형 개발)

  • 고종섭;고승영
    • Journal of Korean Society of Transportation
    • /
    • v.17 no.4
    • /
    • pp.47-58
    • /
    • 1999
  • The Purpose of this Paper is to develop a multi-period bus scheduling model, in which a decomposition technique is applied. In general a bus scheduling requires a vast amount of calculation. Thus, a bus scheduling is a very complicated problem even with a single depot and is almost unable to obtain the optimal solution theoretically with many depots. In this paper in order to simplify the problem, the whole operating hours of a day are partitioned into several time periods. In one period, the same headways are maintained. For one period, the bus scheduling is simple and the solution applying the FIFO(First-In, First-Out) Principle is the optimal. However, connection between Periods remains as another scheduling Problem with a reduced problem size. This paper suggests how to connect bus schedules of consecutive periods efficiently, minimizing the operating cost. Through case studies for multiple routes with a single depot, this decomposition technique is proved to be effective practically.

  • PDF

A Study on Evaluation of Safety on Two-Lane Rural Highways (지방부 2차로 안전성 평가에 관한 연구)

  • Ha, Tae-Jun;Lee, Seok
    • Journal of Korean Society of Transportation
    • /
    • v.20 no.1
    • /
    • pp.121-130
    • /
    • 2002
  • Purpose of this paper is proposing technical evaluation method for safety on two-lane rural highways, this method can contribute to an establishment of the safety evaluation criteria and eventually contribute to the highway safety. In this study, accident data and field data(grade, radius, speed factor) are collected and are analyzed. And new technical evaluation method is proposed by problem in review of existent methods and analysis result. Property of new method is verified by comparing with existent one. Following are results of this study. 1) Proposed technical evaluation method is Proposed by using difference of speed variance and difference of acceleration. 2) In range of field survey, proposed method is more proper than existent one by comparing. 3) Headways under 6 second affect speed of next vehicle. 4) A point with the lowest speed in curve is placed about 35m from the beginning point. 5) Correlation of speed variance and severity of highway(EPDO) is statistically significant. For using proposed method, more tests are needed on other locations with various geometries. Moreover, advanced study is needed about classifying and giving the weight of each criterion.