Journal of Institute of Control, Robotics and Systems
/
v.5
no.2
/
pp.145-150
/
1999
A real-time control system, composed of the controlled processor and the controller computer(s), may have a variety of task types, some of which have tight timing-constraints in generating the correct control input. The maximum period of those task failures tolerable by the system is called the hard deadline, which depends on not only fault characteristics but also task characteristics. In the paper, we extend a method deriving the hard deadline in LTI system executing single task. An algorithm to combine the deadlines of all the elementary tasks in the same operation-mode is proposed to derive the hard deadline of the entire system. For the end, we modify the state equation for the task to capture the effects of task failures (delays in producing correct values) and inter-correlation. We also classify the type of executing the tasks according to operation modes associated with relative importance of correlated levels among tasks, into series, parallel, and cascade modes. Some examples are presented to demonstrate the effectiveness of the proposed methods.
This paper presents the deadline driven CPU-Power management scheme for the Real-Time Embedded OS: named TMO-eCos. It used the scheduling scenarios generated by a task serialization technique for hard real- time TMO system. The serializer does a off-line analysis at design time with period, deadline and WCET of periodic tasks. Finally, TMO-eCos kernel controls the CPU speed to save the power consumption under the condition that periodic tasks do not violate deadlines. As a result, the system shows a reasonable amount of power saving. This paper presents all of these processes and test results.
The Transactions of the Korean Institute of Electrical Engineers D
/
v.53
no.8
/
pp.594-601
/
2004
We analyze checkpoint strategy for multiple real-time periodic tasks with hard deadlines. Real-time tasks usually have deadlines associated with them. For multiple real-time tasks, checkpoint strategy considering deadlines of all tasks is very difficult to derive. We analyze the problem of checkpoint placement for such multiple periodic tasks. In our strategy, the interval between checkpoints is determined for each task considering its deadline. An approximated failure probability over a specified interval is derived. Then the number of checkpoints for each task is selected to minimize the approximated failure probability. To show the usefulness of our strategy, error bound between the exact and the approximated failure probability is estimated, which is revealed to be quite small.
Most concurrency control protocols have been devised for resolving data conflicts among real-time transactions of a single type. Recent real-time database systems should support various types of real-time transactions due to needs of many different types of applications and steady improvement of hardware. In this paper, we propose integrated concurrency control protocol to resolve data conflicts among hard and soft real-time transactions. Our proposed protocol, based on PCP(Priority Ceiling Protocol) for a hard real-time transactions and MVPR(Multiversion with Precedence Relationship), guarantees that hard real-time transactions meet their deadline, and decreases the deadline miss ratio of soft real-time transactions. We also proved that the proposed protocol guarantees serializable schedules and no deadlocks. The performance of the proposed protocol has been compared with other real-time concurrency protocols.
KIPS Transactions on Computer and Communication Systems
/
v.2
no.6
/
pp.237-244
/
2013
We propose Energy-constrained Multiprocessor Real-Time Scheduling algorithms for (m,k)-firm deadline constrained tasks (EMRTS-MK). Rather than simply saving as much energy as possible, we consider energy as hard constraint under which the system remains functional and delivers an acceptable performance at least during the prescribed mission time. We evaluate EMRTS-MKs in several experiments, which quantitatively show that they achieve the scheduling objectives.
Proceedings of the Korean Information Science Society Conference
/
2003.04a
/
pp.202-204
/
2003
경성 실시간 시스템(Hard Real-Time System)어서는 주기 태스크들의 엄격한 마감시간(Deadline) 보장이 시스템의 성능을 좌우한다. 본 논문에서는 CPU의 이용률(Utilization)이 높아 비율단조 정책으로는 마감시간을 보장 할 수 없는 주기 태스크들을 위해 확장된 스케줄 가능성 검사를 통해 수행할 태스크들의 공통 주기(L.C.M : Least Common Multiple)내에서 EDF(Earliest-Deadline First) 정책을 기반으로 마감시간 보장 수행패턴(Feasible Pattern)을 찾고, 이를 참조하여 우선순위를 고려하지 않고 태스크들을 강제 수행할 수 있게 하는 비율단조 기반의 스케쥴링 기법을 제안한다. EDF를 기반으로 생성된 패턴은 EDF 정책의 특성에 따라 CPU의 이용률을 100% 까지 가능하게 하며 패턴을 참조하여 강제 수행함으로써 EDF 정책이 갖는 실행시간 스케쥴링 오버헤드를 없앨 수 있다.
The Transactions of the Korea Information Processing Society
/
v.6
no.2
/
pp.467-475
/
1999
This paper presents an algorithm for scheduling jobs in soft real-time systems. To simplify the scheduling for soft real-time systems, we introduce two-level deadline scheme. Each job in the system has two deadlines, which we call first-level and second-level deadlines, respectively. The first-level deadline is the same as the deadline in traditional real-time systems. The second-level deadline is later than the first-level deadline, and defines the latest point in time when the result is still acceptable. Partial-credit is given for jobs meeting the second-level deadline but missing the first-level deadline, whereas jobs meeting the latter are given full credit. We heuristically compute priorities of jobs in a dynamic way by combining the first-level adn second-level deadlines with the partial-credit. Simulation results indicate that our two-level scheduling algorithm is a viable approach for dealing with both soft real-time systems and temporary overloaded hard real-time systems.
The Transactions of the Korean Institute of Electrical Engineers D
/
v.49
no.7
/
pp.363-369
/
2000
To flexibly evaluate performance and reliability of an electric power system in the aspect of the real-time system which is intrinsically characterized by stringent timing constraints fails catastrophically if its control input is not updated by its digital controller computer within a certain time limit called the hard deadline, we propose fuzzy-random variables and build a discrete event model embedded with fuzzy-random variables. Also, we adapt fuzzy-variables to a path-space approach, which derives the upper and lower bounds of reliability by using a semi-Markov model that explicitly contains the deadline information. Consequently, we propose certain formulas of state automata properly transformed by fuzzy-random variables, and present numerical examples applying the formulas as well.
Proceedings of the Korea Information Processing Society Conference
/
2002.04a
/
pp.687-690
/
2002
In this paper, we present a novel semaphore implementation scheme which shortens finish time of high priority tasks and improves reliability of a system. The real-time systems have time constraints. Especially, the task with hard real-time constraints must meet its deadline. Consequently, managing shared resources is considered guaranteeing mutual exclusion as well as meeting task's deadline under unfavorable condition. According to the number and sort of the locked semaphores under the event occurred, this paper presents the reduction of the finish time of high priority task by decision whether the context switched or not. The experimental results show that the proposed method gives performance improvements in finish time of high priority tasks of about 11% over zuberi[4] method.
Kim, Hee-Heon;Piao, Xuefeng;Park, Moon-Ju;Park, Min-Kyu;Cho, Yoo-Kun;Cho, Seong-Je
Journal of KIISE:Computer Systems and Theory
/
v.36
no.1
/
pp.9-20
/
2009
In a real-time system with both hard real-time periodic tasks and soft real-time aperiodic tasks, it is important to guarantee the deadlines of each periodic task as well as obtain fast response time for each aperiodic task. This paper proposes Enhanced Total Bandwidth Server (ETBS) with possibly shorter response time than Total Bandwidth Server (TBS), which is efficient and widely used for servicing aperiodic tasks. For uniprocessor system using Earliest Deadline First (EDF) scheduling algorithm, ETBS assigns an on-line deadline to each aperiodic task considering a surplus slack time which gained for every unit execution time of periodic job. The proposed method can fully utilize the processor while meeting all the deadlines of periodic tasks. We show that the proposed ETBS provides better response time of aperiodic tasks than TBS theoretically, but has the same computational complexity as TBS, O(1). Simulation results show that the response time of aperiodic tasks with ETBS are shorter than one with TBS.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.