• 제목/요약/키워드: Hanging Tension Column

검색결과 2건 처리시간 0.015초

특수구조 대상으로 고강도 강재(HSA800)의 현장 적용성 연구 (Application Study of High-Strength Steel(HSA800) for the Special Structure)

  • 김인호;이희수;박성용;김종수
    • 한국공간구조학회논문집
    • /
    • 제14권2호
    • /
    • pp.69-78
    • /
    • 2014
  • The purpose of this study is to increase applicability of high strength steel, HSA800 to the structure. Selected study of structure is to consider high strength steel, and following parts, 1) Tensile member with no consider of buckling, 2) Truss existing both tension and compression members with small slenderness ratio. This studied structure is included tension column hang on to the upper bridge truss. The structure element quantity with apply HSA800 instead of SM570 is reduced about 38.9% of tension column and 29.7% of bridge truss. In addition, the number of element's division is reduced about two sections due to reduction of self weight that the crane is able to lift up. This improves to reduce erection sequence and construction period which can save about a month. All connections are reviewed as welding and bolt. Also, the cost of welding is reduced about 41.3% due to apply HSA800. In conclusion, applying HSA800 to the hanging structure aggressively can secure economic and constructability.

적용사례 중심의 매달린 구조물의 구조적 특성을 고려한 시공순서 최적화 및 시공단계별 구조해석 연구 (A Study on Construction Sequence Optimization and Structural Analysis in consideration of Structural Concept of Hanging Structure based on the Applied Case)

  • 박용현;김종수;주영규
    • 대한건축학회논문집:구조계
    • /
    • 제35권7호
    • /
    • pp.147-156
    • /
    • 2019
  • The purpose of this study is to consider structural issues and analyze construction sequences when constructing hanging floors supported by Mega truss. Since suspended structures were supported by the Mega truss, vertical load on suspended structures was needed to transfer from low to high. Deflection management of structures was the primary point under construction. The results of this study were as follows; The steel structures, which has relatively lighter self-weight, were constructed upwards after the base floor steel truss erection. Concrete Placing, which has relatively heavier self-weight, were performed in two phases to minimize structure's deflection. Slab was placed downwards from the top floor to lower floor whereas column was places upwards. Deflection measurements were carried out at every construction sequences.