• Title/Summary/Keyword: HEC-5

Search Result 225, Processing Time 0.02 seconds

Investigation of Flow Characteristics of Sharply Curved Channels by Using CCHE2D Model (CCHE2D모형을 이용한 급만곡부의 흐름특성 분석)

  • Kim, Yeon-Su;Jang, Chang-Lae;Lee, Gi-Ha;Jung, Kwan-Sue
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.10 no.5
    • /
    • pp.125-133
    • /
    • 2010
  • In general, curved bends raises a risk of overtopping due to floods and also threatens a bank safety due to a local flow concentration. This study aims to test the applicability of CCHE2D model for experimental flumes with two different types of bends and then investigate flow characteristics in the sharply-curved bend of a natural channel. The results demonstrated that the percent error of water level was within 4.9% for experimental flume applications and the simulated spatial distribution of velocity matched the observed results very closely. The calibrated model based on the experimental flumes was also applied to analyze the flow characteristics in natural channel bends of the Daeyu reach, located in a downstream of the Youngdam Dam. The results showed that in upstream, the simulated water level by the CCHED was observed at 1.5 m higher than the 1-D numerical model (HEC-RAS) result since the HEC-RAS could not represent the bend geometry effect on streamflow. However, the calculated results by several empirical formula support that the CCHE2D is suitable for the super elevation simulation as well as flood stage and velocity in a natural channel bend.

Characteristics of Runoff on Urban Watershed in Jeju island, Korea (제주도 도심하천 유역의 유출특성 해석)

  • Jung, Woo-Yul;Yang, Sung-Kee;Lee, Jun-Ho
    • Journal of Environmental Science International
    • /
    • v.22 no.5
    • /
    • pp.555-562
    • /
    • 2013
  • Jeju Island, the heaviest raining area in Korea, is a volcanic Island located at the southernmost of Korea, but most streams are of the dry due to its hydrological/geological characteristics different from those of inland areas. Therefore, there are limitations in applying the results from the mainland to the studies on stream run-off characteristics analysis and water resource analysis of Jeju Island. In this study, the SWAT(soil & water assessment tool) model is used for the Hwabuk stream watershed located east of the downtown to calculate the long-term stream run-off rate, and WMS(watershed modeling system) and HEC-HMS(hydrologic modeling system) models are used to figure out the stream run-off characteristics due to short-term heavy rainfall. As the result of SWAT modelling for the long-term rainfall-runoff model for Hwabuk stream watershed in 2008, 5.66% of the average precipitation of the entire basin was run off, with 3.47% in 2009, 8.12% in 2010, and root mean square error(RMSE) and determination coefficient($R^2$) was 496.9 and 0.87, respectively, with model efficient(ME) of 0.72. From the results of WMS and HEC-HMS models which are short-term rainfall-runoff models, unless there was a preceding rainfall, the runoff occurred only for rainfall of 40mm or greater, and the run-off duration averaged 10~14 hours.

A Study of Water Transfer between Han River and Nakdong River Basins (한강-낙동강 유역간 물이동 분석)

    • Journal of Korea Water Resources Association
    • /
    • v.31 no.4
    • /
    • pp.483-490
    • /
    • 1998
  • The possibility of water transfer from Han river basin to Nakdong river basin by connecting them is studied as an alternative to solve water shortage problem in Nakdong river basin. After estimating the amount of water shortage from Nakdong river basin, the amount of water surplus from Han river basin is estimated by using simulation and optimization techniques. HEC-5 is used to study small to medium size reservoirs as a simulation technique and dynamic programming is used to study multi-purpose reserviors as an optimization technique. Also, the cost of the interbasin water transfer from Han river basin to Nakdong river basin is also compared with that of constructing new reserviors in Nakdong river basin. If new reservoirs are constructed in Nakdong river basin as planned, water supply can satisfy various water demands until 2021 without the interbasin water transfer. In economic point of view, constructing new reserviors has an advantage over the interbasin water transfer.

  • PDF

Flood Travel Time Analysis using Two-dimensional Hydraulic Model in Yeong-san River Downstream (2차원 수리해석모형을 이용한 영산강 하류부의 홍수파 도달시간 분석)

  • Oh, Ji-Hwan;Jo, Jun-Won;Jang, Suk-Hwan;Choov, Jeong-Ho;Oh, Kyoung-Doo
    • Journal of Wetlands Research
    • /
    • v.20 no.4
    • /
    • pp.446-457
    • /
    • 2018
  • Forecasting of flood wave travel time is very important in terms of river management and operation. Recently, the hydrological environment of has changed due to the construction of multi-function weir in the river. It is necessary to analyze flood wave travel time, including hydraulic structures in the channel. The flood wave travel time according to the discharge and downstream water level operating conditions was analyzed using HEC-RASver5.0.3 which is capable a two-dimentional analysis. This study showed nonlinear characteristics of flood wave travel times due to increase of discharge and operating conditions. The results of this study will be helpful for the operation of multi-function weir as well as the river operation.

Hydrologic Impact Assessment of land Cover Changes by 2002 Typhoon RUSA Using Landsat Images and Storm Runoff Model

  • Lee, Mi-Seon;Park, Geun-Ae;Kim, Seong-Joon
    • Korean Journal of Remote Sensing
    • /
    • v.22 no.5
    • /
    • pp.407-413
    • /
    • 2006
  • To investigate the streamflow impact of land cover changes by a typhoon, HEC-l storm runoff model was applied by using land cover information before and after the typhoon. The model was calibrated with three storm events of 1985 to 1988 based on 1985 land cover condition for a $192.7km^{2}$ watershed in northeast coast of South Korea. After the model was tested, it was run to estimate impacts of land cover change by the typhoon RUSA occurred in 2002 (31 August-1 September) with 897.5 mm rainfall. The land covers before and after the typhoon were prepared using Landsat 7 ETM+ of September 11 of 2000 and Landsat 5 TM of September 29 of 2002 respectively. For the $6.9km^{2}$ damaged area (3.6 % of the watershed), the peak runoff and total runoff by the changed land cover condition increased 12.5 % and 12.7 % for 50 years rainfall frequency and 1.4 % and 1.8 % for 500 years rainfall frequency respectively based on AMC (Antecedent Moisture Condition)-I condition.

Improvement of Water Supply Capability of the Nakdong River Basin Dams with Weirs (보를 포함한 낙동강 다목적댐 용수공급능력 개선에 관한 연구)

  • Jang, Cheol-Ho;Kim, Young-Oh
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.4
    • /
    • pp.637-644
    • /
    • 2016
  • This study sought to reevaluate the water supply capacities of the Nakdong river dams, and identify measures to remedy any shortages using weirs, focusing on 5 multipurpose dams and 8 weirs. The reevaluation of the dams was performed by the HEC-5 program using the original design criteria and inflow data recorded for each dam. The results show that the capacities of the 3 dams has decreased to 73~87%. Three simulations were performed to determine the effect of coordinating the dams and weirs. The first simulation was based on individual operation of the dams; the second on coordinated operation of the dams; and the third on coordinated operation of the dams and weirs. To obtain a water supply reliability of 95%, the annual water shortage was calculated for a 20-year period (1992~2011). In addition, long-term runoff simulation data used in the national river basin investigation by the Ministry of Land, Infrastructure and Transportation were used with the dam discharge data, because long-term inflow data for the weirs were not available. The simulations were performed by the HEC-ResSim program, with the reservoir network divided into 2 groups based on the Waegwan water station. The results show that water supply capacity for the 3 simulations to be $2424Mm^3/yr$, $2612Mm^3/yr$ and $2734Mm^3/yr$, respectively. This indicates that coordinated operation of the dams and weirs could provide an additional water supply of $122Mm^3/yr$.

A Study on the Effect of Dredging and Operation of Weirs on Hydraulic Characteristics in Nakdong River (낙동강 수계 준설 및 수리시설물 운영에 따른 흐름특성 연구)

  • Ahn, Jung Min;Lyu, Siwan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.5
    • /
    • pp.1829-1840
    • /
    • 2013
  • It is essential to understand the hydraulic characteristics in accordance with the changes in the river environment and operating hydraulic structures for increasing flood-control capacity. The objective of this study is to analysis the effect of dredging and operation of weirs on hydraulic characteristics in Nakdong River(Seongju~Imhaejin). HEC-RAS model has been used to examine the hydraulic characteristics with considering the flow transition through the unsteady flow analysis and the information about the specifications of multi-functional weirs. The relationship between Manning n and roughness height k, the effect of weir installation and operation on the flow and stage, and the bed change resulted from the river treatment project have been examined by steady and unsteady flow analysis. It is expected that the result from this study can be the basic data for the river treatment and management.

Efficacy and Safety of an Increased-dose of Dexamethasone in Patients Receiving Fosaprepitant Chemotherapy in Japan

  • Kumagai, Hozumi;Kusaba, Hitoshi;Okumura, Yuta;Komoda, Masato;Nakano, Michitaka;Tamura, Shingo;Uchida, Mayako;Nagata, Kenichiro;Arita, Shuji;Ariyama, Hiroshi;Takaishi, Shigeo;Akashi, Koichi;Baba, Eishi
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.15 no.1
    • /
    • pp.461-465
    • /
    • 2014
  • Background: Antiemetic triplet therapy including dexamethasone (DEX) is widely used for patients receiving highly emetogenic chemotherapy (HEC). In Japan, the appropriate dose of DEX has not been established for this combination. Materials and Methods: To assess the efficacy and safety of increased-dose DEX, we retrospectively examined patients receiving HEC with antiemetic triplet therapy. Results: Twenty-four patients (fosaprepitant group) were given an increased-dose of DEX (average total dose: 45.8mg), fosaprepitant, and 5-HT3 antagonist. A lower-dose of DEX (33.6mg), oral aprepitant, and 5-HT3 antagonist were administered to the other 48 patients (aprepitant group). The vomiting control rates in the fosaprepitant and aprepitant groups were 100% and 85.4% in the acute phase, and were 75.0% and 64.6% in the delayed phase. The incidences of toxicity were similar comparing the two groups. Conclusions: Triplet therapy using an increased-dose of DEX is suggested to be safe and effective for patients receiving HEC.

Real-time Matrix type CRC in High-Speed SDRAM (고속 SDRAM에서 실시간 Matrix형 CRC)

  • Lee, Joong-Ho
    • Journal of IKEEE
    • /
    • v.18 no.4
    • /
    • pp.509-516
    • /
    • 2014
  • CRC feature in a high-speed semiconductor memory devices such as DDR4/GDDR5 increases the data reliability. Conventional CRC method have a massive area overhead and long delay time. It leads to insufficient internal timing margins for CRC calculation. This paper, presents a CRC code method that provides error detection and a real-time matrix type CRC. If there are errors in the data, proposed method can alert to the system in a real-time manner. Compare to the conventional method(XOR 6 stage ATM-8 HEC code), the proposing method can improve the error detection circuits up to 60% and XOR stage delay by 33%. Also the real-time error detection scheme can improve the error detection speed to agerage 50% for the entire data bits(UI0~UI9).

Flood Water Level Changes Analyses for the Construction of a Small Dam -Focused on the Geum River Reach in Sejong City- (수위유지시설 설치에 따른 홍수위 변화 해석 - 세종시 금강 구간을 중심으로 -)

  • Jeong, Sang-Man;Park, Chan-Seong;Lee, Joo-Heon;Shin, Kwang-Seob
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.9 no.2
    • /
    • pp.59-68
    • /
    • 2009
  • Currently, building a small dam located 1.16 km downstream from Geumnam Bridge is being considered in order to improve the riverine scenery of the site for Sejong City and to create a hydrophilic space. The purpose of this research is to present the appropriate dimensions of a small dam by reviewing the flood control reliability of the Geum River after the small dam is built. To establish this purpose, changes in the flood water level were compared and analyzed by changing the installation height of a small dam using 1D and 2D models. 1D HEC-RAS and 2D FESWMS models were applied to perform the numerical analysis of the reach. The results showed that flood control reliability was guaranteed when the installation height of the small dam was 5 meters or lower. From the 2D model, a more accurate result can be developed because the model could provide a two dimensional numerical analysis. The results can be used to determine the appropriate dimensions of a small dam for Sejong City.