• Title/Summary/Keyword: Grouting of dam

Search Result 33, Processing Time 0.01 seconds

Effect analysis by time passage after Repair & Reinforcement of Fill Dams (필댐 보수보강후 시간경과에 따른 효과 분석)

  • Kim, Jae-Hong;Oh, Byung-Hyun;Im, En-sang;Hong, Won-Pho
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.697-703
    • /
    • 2008
  • Excessive water leakage phenomenon happens through damage of nation core zone of about 17,000 storage of water facilities or collapse of dam is worried, is being damaged or enforce dilapidated fill dam core zone's repair reinforcement. Example that use grouting method of construction considering construction and economic performance etc. recently by repair reinforcement way about defect of dam is increased. Permeation grouting method repair & reinforcement of fill dam countermeasure is preferred in nation. Do that is economical to decide these repair reinforcement effect and grouting effect estimation method that do not give damage to dam is effective. Therefore, observing electricity resistivity Survey change of dam since grouting reinforcement using Electric resistivity Survey inquiry of seismic survey method in this research, Wished to verify grouting effect whether is possible as Electric resistivity Survey, and study whether integrity of dam through repair reinforcement defined.

  • PDF

The Effect of Remedial Works to Control the Leakage Problem in Earth Fill Dam by Compaction Grouting (콤팩션 그라우팅에 의한 흙댐의 누수복원 공사효과 분석)

  • Chun, Byung-Sik;Lee, Yong-Jae;Chung, Ha-Ik
    • Journal of the Korean Geotechnical Society
    • /
    • v.22 no.11
    • /
    • pp.13-23
    • /
    • 2006
  • The sinkhole and leakage in dam core were detected at one of earth fill dams in Korea. The damage areas in the core of the dam were repaired by compaction grouting method. This study is to evaluate compaction grouting activity by in-situ and laboratory experiments before, during and after the remedial work. The intensive site investigation and geophysical survey were conducted during and after the compaction grouting work. The compaction grouting work was carried out for the damaged dam core between June 16 and August 24, 2000. The leakage reduction generally occurred in the core of the dam after the remedial work. The use of compaction grouting was considered the proper countermeasures for repairing the damaged dam. It shows that the loose or voided zones have been properly filled and the leakage has been reduced by about 96% of that before the treatment of the remedial work performed at dam core by compaction grouting.

Evaluation of Applicability of HWAW (Harmonic Wavelet Analysis of Waves) Method in Determining Grouting Effect in Dam and Embankment (제체 그라우팅 효과 평가를 위한 HWAW방법의 적용성 평가)

  • Noh, Hee-Kwan;Park, Hyung-Choon
    • Journal of the Korean Geotechnical Society
    • /
    • v.32 no.5
    • /
    • pp.15-26
    • /
    • 2016
  • Dam and embankment are very important civil structures. Grouting is widely used to repair and maintain dam and embankment, and it is important to evaluate the effect of grouting for dam safety. The non-destructive method based on determination of wave velocity in the dam or embankment is effectively used to evaluate grouting effect because wave velocity is identical with stiffness and grouting increases local stiffness in a dam. In this paper, HWAW (Harmonic wavelet analysis of waves) method was applied to evaluate the grouting effect. HWAW method can determine two-dimensional shear wave velocity map with good spatial resolution and the shear velocity profile by the proposed method is sensitive to a variation of stiffness of target system. Through numerical simulation and field tests, the applicability of HWAW method in determining grouting effect is shown.

Estimation of Reinforcement Effect of Superannuated Fill Dam Repaired by the Permeable Grouting Method (침투그라우팅이 시공된 노후필댐의 보수보강효과 평가)

  • Kim, Yungjin;Heo, Yol;Oh, Byunghyun
    • Journal of the Korean GEO-environmental Society
    • /
    • v.8 no.6
    • /
    • pp.45-52
    • /
    • 2007
  • Maintenance of structural and hydrological safety of the superannuated fill dam is very important subject on the viewpoint of disaster prevention. Mainly, the core of the superannuated fill dams have been damaged continuously by the various harmful external forces such as the typhoons, flash floods and earthquake, and these can be connected to the large scaled general dam failure. Therefore, the research on the repair, remediation and reinforcement of dam is necessary. In this study, the permeable grouting method for the remediation of fill dam was examined by the electrical resistivity survey and the change of permeability of core front. As a result, the permeable grouting method can be useful remediation method for the superannuated fill dam, the leakage from the core front decreased greatly before and after the construction of grouting. Furthermore, it can be said that the turbidity of fill dam may not be greatly increased by grouting.

  • PDF

Pressure analysis in grouting and water pressure test to achieving optimal pressure

  • Amnieh, Hassan Bakhshandeh;Masoudi, Majid;Kolahchi, Reza
    • Geomechanics and Engineering
    • /
    • v.13 no.4
    • /
    • pp.685-699
    • /
    • 2017
  • In order to determine the rate of penetrability, water pressure test is used before the grouting. One of the parameters which have the highest effect is pressure. Mathematical modeling is used for the first time in this study to determine the optimum pressure. Thus, the joints that exist in the rock mass are simulated using cylindrical shell model. The joint surroundings are also modeled through Pasternak environment. In order to validate the modeling, pressure values obtained by the model were used in the sites of Seymareh and Aghbolagh dams and the relative error rates were measured considering the differences between calculated and actual pressures recorded in these operations. In water pressure test, in Seymareh dam, the error values were equal to 4.75, 3.93, 4.8 percent and in the Aghbolagh dam, were 22.43, 5.22, 2.6 percent and in grouting operation in Seymareh dam were equal to 9.09, 32.50, 21.98, 5.57, 29.61 percent and in the Aghbolagh dam were 2.96, 5.40, 4.32 percent. Due to differences in rheological properties of water and grout and based on the overall results, modeling in water pressure test is more accurate than grouting and this error in water pressure test is 7.28 percent and in grouting is 13.92 percent.

A study on Monitoring the Inner Structure of Dam Body Using High Resolution Seismic Reflection Method (고분해능 탄성파 반사법을 이용한 댐체 내부구조 모니터링 연구)

  • Kim, Jung-Yul;Kim, Hyoung-Soo;Oh, Seok-Hoon;Kim, Yoo-Sung
    • Journal of the Korean Geophysical Society
    • /
    • v.8 no.1
    • /
    • pp.1-6
    • /
    • 2005
  • Defects of dam body which can be induced in seepage or leakage procedure can directly affect dam safety. Therefore, a proper inspection method should be carried out in the first place to find out their positions and sizes. After that, some reinforcement works such as grouting and the corresponding assessment could be taken in a proper way. The dam(center core type earth dam) issued in this study has been in need for intensive diagnosis and reinforcement work, because a lot of slumps similar to cracks, seepage and some boggy area have been observed on the downstream slope. High resolution seismic reflection method was performed on the crest profile twice before and after grouting work(Aug. 2001 and Nov. 2004) aimed at the dam inspection and the assessment of grouting efficiency as well. To enhance the data resolution, P-beam energy radiation technique which can reduce the surface waves and hence to reinforce the reflection events was used. Strong reflection events were recognized in the stack section before grouting work, It seems that the events would be caused by e.g. horizontal cracks with a considerable aperture. Meanwhile such strong reflection events were not observed in the section after grouting. That is, the grouting work was dear able to reinforce the defects of dam body. Hence, the section showed an well arranged picture of dam inner structure. In this sense, seismic reflection method will be a desirable technique for dam inspection and for monitoring dam inner structure as well.

  • PDF

A study on monitoring the inner structure of dam body using high resolution seismic reflection method (고분해능 탄성파 반사법을 이용한 댐체 내부구조 모니터링 연구)

  • Kim Jungyul;Kim Hyoungsoo;Oh Seokhoon;Kim Yoosung
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2005.05a
    • /
    • pp.15-20
    • /
    • 2005
  • Defects of dam body which can be induced in seepage or leakage procedure can directly affect dam safety. Therefore, a proper inspection method should be carried out in the first place to find out their positions and sizes, After that, some reinforcement works such as grouting and the corresponding assessment could be taken in a proper way. The dam(center core type earth dam) issued in this study has been in need for intensive diagnosis and reinforcement work, because a lot of slumps similar to cracks, seepage and some boggy area have been observed on the downstream slope. High resolution seismic reflection method was performed on the crest profile twice before and after grouting work(Aug. 2001 and Nov. 2004) aimed at the dam inspection and the assessment of grouting efficiency as well. To enhance the data resolution, P-beam energy radiation technique which can reduce the surface waves and hence to reinforce the reflection events was used. Strong reflection events were recognized in the stack section before grouting work, It seems that the events would be caused by e.g. horizontal cracks with a considerable aperture, Meanwhile such strong reflection events were not observed in the section after grouting. That is, the grouting work was dear able to reinforce the defects of dam body. Hence, the section showed an well arranged picture of dam inner structure. In this sense, seismic reflection method will be a desirable technique for dam inspection and for monitoring dam inner structure as well.

  • PDF

Permeation Grouting Effect for Repair and Reinforcement of Old Dam (노후댐 보수보강을 위한 침투그라우팅 효과 분석)

  • LEE, Dong-Beom;Lim, Heui-Dae;Song, Young-Su
    • The Journal of Engineering Geology
    • /
    • v.28 no.2
    • /
    • pp.277-295
    • /
    • 2018
  • As it has become difficult to secure new water resources through dam construction due to the critical social public opinions on dam construction from 10 years ago, it is necessary to review the existing water resources through the review of existing dams. Accordingly, access methods, such as planning, construction and management, were carried out using technologies already accumulated in relation to the repair and reinforcement of the dam. As a result of the repair and reinforcement, permeation grouting has been performed in many dams, but the establishment of the technology is insufficient so far, and the published paper at home and abroad is extremely rare. In this thesis, low-pressure penetration and grouting reinforcement technologies for the YC dam are analyzed in detail. As a result, penetration grouting has shown that it can be effectively applied to the improvement in the constallability of the core fill-like a YC dam. In addition, the technical details of the experience-proven penetration grouting are given in relation to the injection criteria. It is deemed that the specific analysis data of the Fill Dam penetration grouting technology through this study can be used as useful data for strengthening the repair of Fill Dam and reservoir.

A Case Study of Remediation Grouting for Stopping Leakage of Concrete Dam Base (콘크리트 댐 기초 누수방지 보수그라우팅 사례)

  • 천병식;김진춘;최영철
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.449-456
    • /
    • 2000
  • Remediation grouting has been widely used for the rehabilitation of various civil works like hydraulic and traffic structures. Recently there were some cases of remediation grouting for repairing old dams in korea. So this study will describe the case of remediation grouting of the concrete dam base located east-northern part of Seoul. We use Lugeon Test and Borehole Image Processing System(BIPS) for estimating the effectiveness of remediation grouting of this project. As the results of this study, we could find the lots of joints between the old concrete body and the weathered rock base. So the about 30% quantity of total cement grouts was injected at the boundary surface between concrete and rock base. And Lugeon Test and BIPS could be compared relatively because BIPS results could be presented quantitatively as well as qualitative analysis. Finally, we could find microfine cement was very effectively injected to the fine fissured concrete body compared with ordinary portland cement, but there was little injectability differences beteween microfine cement and ordinary portland cement at the large cracks or cavities were developed rock base.

  • PDF

Determining of Ground Condition Criteria for Dam Reinforced RIM Grouting (댐체 강화 RIM부 그라우팅을 위한 지반상태 기준 결정)

  • Han, Kiseung;Lee, Donghyuk;Park, Duhee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.2
    • /
    • pp.181-186
    • /
    • 2022
  • Dam slope RIM is a highly important contact interface where the main body and the base surface are connected. In general, when the grouting for the slope of the dam structure is designed, it is planned using limited data (drilling, geological map, etc.). This makes it very difficult to accurately consider the original ground characteristics of the slope RIM grouting target, In addition, when the grouting volume planned during the design is drilled and injected into the original ground where the waterstop is secured, there is a possibility that the original ground with the waterstop is disturbed and the effect of the waterstop is rather diminished. In order to overcome such problems, it is more suitable to first consider geological conditions and determine whether to perform optimal grouting on the original ground through on-site repair tests before performing RIM grouting. In this paper, to determine the grouting of the RIM unit, a pilot hole water pressure test was performed on the rock of the slope in the target section. The analysis shows grouting volume of 1 Lugeon or less, and the cement injection amount also shows the injection result of 1 kg/m or less. In this case, performing grouting is rather counterproductive. This result can be evaluated through a rock of which some degree of order of mass is secured, as it is a dam design standard of 1 Lugeon or less when analyzed, using the results of visual observation and geological map creation during slope cutting. Therefore, in conclusion, it is preferable to make the decision for using RIM grouting on the slope of the dam body structure, based on 1 Lugeon in a rock state, and the cement injection amount also at 1 kg/m.