• Title/Summary/Keyword: Group bidding price

Search Result 14, Processing Time 0.023 seconds

Bidding Strategy Determination by Defining Strategic Vector

  • Kang, Dong-Joo;Kim, Balho H.;Chung, Koo-Hyung;Moon, Young-Hwan
    • KIEE International Transactions on Power Engineering
    • /
    • v.3A no.1
    • /
    • pp.47-52
    • /
    • 2003
  • This paper presents a schematic process based on the method of eliminating dominated strategies to obtain the optimal bidding strategy Pursuing the Nash equilibrium Point. The Proposed approach is demonstrated for a bidding game in a generation competitive market with 2-dimensional bidding strategy vectors constituting a price-quantity strategy curve.

Analysis of Price-Clearing in the Generation Bidding Competition

  • Chung, Koohyung;Kang, Dongjoo;Kim, Balho H.;Chun, Yeonghan
    • KIEE International Transactions on Power Engineering
    • /
    • v.4A no.4
    • /
    • pp.243-253
    • /
    • 2004
  • As deregulation evolves, pricing electricity becomes a major issue in the electric power industry. Participants in the competitive marketplace are able to improve their profits substantially by effectively pricing the electricity. In this paper, game theory is applied to analyze price-clearing in the generation bidding competition with the competition modeled as the non-cooperative and complete information game. The result of this analysis can be useful in understanding spot price-clearing of electricity as well as GENCOs' strategic behavior in the competitive electricity market.

Technical Proposal based Bidding System Applying the Concept of the Lowest Total Combined Bid Price for Supplying Affordable Housing (최저통합환산가격 개념을 적용한 기술제안 기반 입찰제도)

  • Cho, Gun-Hee;Kang, Seung-Hee;Lee, Jeong-Seok;Sohn, Jeong-Rak;Bang, Jong-Dae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.94-105
    • /
    • 2010
  • Recently, resettlement problems of low income groups in the urban regeneration area have been issued in Korea because they have no capability to purchase (or lease) redeveloped housing (or apartment). There are several approaches for supplying affordable housing and one of these is the bidding system which can reduce construction cost. However, the lowest bidding system has many problems such as dumping and substandard quality. In this context, this study proposed bidding system based on technical proposal applying the concept of the lowest total combined bid price for optimization of bid price, reduction of construction cost and period, and maintenance of suitable quality. This bidding system embraces the best value and cost plus time concept on the basis of an improved lowest price bidding system. It consists of the following components: work unit based, project unit based, and period reducing technical proposals. The proposed bidding system for determining bidders are designed to evaluate the adequacy of each technical proposal in the order of the combined minimum price in an effort to effectively optimize bid prices and reduce the construction periods, as well as to maintain a minimum appropriate quality.

Development of an Integrated Power Market Simulator for the Korean Electricity Market

  • Hur Jin;Kang Dong-Joo;Moon Young-Hwan
    • KIEE International Transactions on Power Engineering
    • /
    • v.5A no.4
    • /
    • pp.416-424
    • /
    • 2005
  • At present, the Korean electricity industry is undergoing restructuring and the Cost Based-generation Pool (CBP) market is being operated in preparation of a Two Way Bidding Pool (TWBP) market. In deregulated electricity industries, an integrated power market simulator is one of the tools that can be used by market participants and market operators analyzing market behaviors and studying market structures and market codes. In this regard, it is very important to develop an electricity market simulator that reflects market code providing a market operation mechanism. This paper presents the development of an integrated market simulator, called the Power Exchange Simulator (PEXSIM), which is designed to imitate the Korean electricity market considering the various features of the market operating mechanism such as uniform price and constrained on/off payment. The PEXSIM is developed in VB.NET and composed of five modules whose titles are M-SIM, P-SIM, O-SIM, T-SIM and G-SIM interfacing the Access database program. To verify the features and the performance of the PEXSIM, a small Two Way bidding market with a 12-bus system and a One Way bidding market for generator competition will be presented for the electricity market simulations using PEXSIM.

Proposed Method for Determining Price Cap in the Korean Electricity Market Applicable to TWBP

  • Kang Dong-Joo;Moon Young-Hwan;Kim Balho H.
    • KIEE International Transactions on Power Engineering
    • /
    • v.5A no.2
    • /
    • pp.199-203
    • /
    • 2005
  • This paper proposes the level of price cap in the TWBP(Two- Way Bidding Pool) market in Korea for which the draft of market design has been prepared by KPX. Max - GMCP(Maximum Generation Market Clearing Price) and APC(Administered Price Cap) would be separately applied as individual price caps for a normal period and a Price Capping period in TWBP. The level of price cap is determined for inducing optimal investment in the Korean Electricity Market considering the 'electricity resource baseline plan' published by the Korean government in 2002 for maintaining government-leading resource planning in Korea. In this regard, Max - GMCP is calculated from the equilibrium condition of investment based on reliability standard and fixed cost of the peaking plant. For verifying the propriety of the proposed price cap, this paper compares the proposed value with the estimated VoLL(Value of Lost Load) based on Korea's GDP(Gross Domestic Product).

Automatic Generation of Reserve Prices and Bid Prices for a Group Buying System (공동 구매 시스템에서의 낙찰 예정가 및 입찰가 자동 생성)

  • 김신우;고민정;박성은;이용규
    • The Journal of Society for e-Business Studies
    • /
    • v.7 no.2
    • /
    • pp.55-68
    • /
    • 2002
  • Internet group buying systems have been widely used recently. In those systems, because the reserve price is provided by the buyer, the success rate can be decreased if the reserve price is set too low compared with the normal price. Otherwise, an unsuitable successful bid can be made if the reserve price is set too high based on inaccurate information. Likewise, the seller's providing too high a bid price can deteriorate his/her own successful bid rate, whereas a successful bid with too low a price may make no profit in the sale. Therefore, pricing agents that recommend adequate prices based on the past buying and selling history data can be helpful. In this paper, we propose two kinds of agents. One suggests reserve prices to buyers based on the past buying history database of the system. The other recommends bid prices to a seller based on the past bidding history data of the company using the cost accounting theory. Through performance experiments, we show that the successful bid rate can increase by preventing buyers from making unreasonable reserve prices. Also, we show that, for the seller, the rate of successful bids with appropriate profits can increase. Using the pricing agents, we design and implement an XML-based group buying system.

  • PDF

A Delphi Study on the Price Escalation Clause in a Construction Contract

  • Choi, Min Soo;Kim, Moo Han
    • Architectural research
    • /
    • v.8 no.1
    • /
    • pp.69-76
    • /
    • 2006
  • The purpose of this study is to suggest policies to improve the price escalation system in a construction contract through a Policy Delphi technique. The Delphi, including two times questionnaires and a group discussion, was conducted by joining 14 experts. Also, the escalation provisions of various countries were examined. Results of the Delphi showed that the minimum fluctuation rate for price escalation was desirable at a level of 3%. To compute the fluctuation rate, calculating the price fluctuation of overall articles was more desirable than using price indices. A bidding date was more reasonable as the initial date of change in price. Losses caused by price change should be shared between contractor and owner; therefore a deduction rate should be introduced in price escalation. Meanwhile, overhead and profit should be adjusted in proportion to the fluctuation rate; but advance payment or the delayed construction amount should be deducted from the adjusted amount.

Uncertainty Factors affecting Bid Price from Pre-bid Clarification Document of Transport Construction Projects

  • Jang, YeEun;Kim, HaYoung;Yi, June-Seong;Lee, Bum-Sik
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.238-244
    • /
    • 2022
  • Civil projects are associated with many uncertainties because they involve a long duration, many resources, a large area, and many supply chains. Therefore, the price of a civil project is not simply proportional to the quantity and unit price of the item but has a variable value, including uncertainty risk. This study investigates the influence of the uncertainty factors in the pre-bid clarification document on bid price formation during the project bidding phase. To this end, civil projects from the California Department of Transportation (Caltrans) were used as research data. This study randomly selected fifty sample data from each of twelve counties from 2008-to 2020: six hundred. The authors observed that each project sample had 0 to n query cases due to uncertainty. Then, this study examined the project uncertainty cases and categorized them into the following four uncertainty factors: 'conflict' (UF1), 'impossibility' (UF2), 'lack' (UF3), and 'missing' (UF4). Under the extracting process, the cases are classified into four uncertainty factors. With the project not containing any uncertainty factors as a control group, the project containing these uncertainty factors was designated as an experimental group. After comparing the bidder's price, the experimental group's bid price was higher than the control group's. This result suggests that uncertainty factors in bid documents induce bidders to set a high bid price as a defense against uncertainty.

  • PDF

Estimating Method of Starting Point Bias in Bidding Game (서베이를 이용한 입찰게임에서 출발점 편의의 추정)

  • 박용치
    • Survey Research
    • /
    • v.4 no.2
    • /
    • pp.63-86
    • /
    • 2003
  • The objective of this study was to investigate the existence of starting point bias in the bidding game contingent valuation elicitation technique when determining willingness to pay (WTP) for improving the qualify of running water in Seoul and its vicinity. Of all existing contingent techniques, the bidding game most closely mimics the normal price taking behavior in local markets. Three different starting points (low, medium and high) were used to determine WTP and the existence of starting point bias in the meanwhile respectively. The respondents were randomly assigned to the three different starting point groups in order to ensure homogeneity, so that any variation seen in WTP could be attributed to the starting point effects. And a pretested interviewer-administered questionnaire used to elicit WTP. Non-parametric test and the logit model were used to analyze the data for evidence of starting point bias. In this instance, the high starting point group had a high WTP, and low starting point group had a low WTP. This means there exist starting point bias in estimating WTP by bidding game in this instance. This finding might signal that people may actually be making up their minds on the maximum amount they are willing to pay for running water service as a bidding iterating is going on and is influenced by the starting point used in the bidding game. The problem of slaking point bias can be avoided if the respondent is asked directly for the maximum WTP without payment cards or a bidding game. But such a question is perceived as being very difficult to answer and this leads to problems of non-response and being unrealistic.

  • PDF

A Study on Model Establishment of the Validity Evaluation for BTL Project Expenses Using an Analytic Hierarchy Process (계층분석법(AHP)을 이용한 BTT사업비 타당성 평가모형 정립에 관한 연구)

  • Jung, Young-Han
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.6
    • /
    • pp.155-160
    • /
    • 2008
  • The BTL project, 4 years since its operation. has benchmarked the PFI Project in Japan and has been introduced. Given the evaluation step to select a preferred bidder, in a technological factor, the basic plans are corrected and complemented, whereas in a price factor, the low price bidding system is being enforced. There is concern that how to select preferred bidders and how to operate project costs during operation and management period may be problematic. Thus, in this study, using the Analytic Hierarchy Process, the method of deciding the priority to select preferred bidders in an early stage of the project and the evaluation model to evaluate the validity of BTL project expenses in process of project enforcement are established. Targeting the group composed of experts who have experiences in the BTL project. Then, the levelling of evaluation factors and grouping have been carried out as following : LCC analysis and disbursement for government including two more detailed factors.