KIEE International Transactions on Power Engineering
/
v.3A
no.1
/
pp.47-52
/
2003
This paper presents a schematic process based on the method of eliminating dominated strategies to obtain the optimal bidding strategy Pursuing the Nash equilibrium Point. The Proposed approach is demonstrated for a bidding game in a generation competitive market with 2-dimensional bidding strategy vectors constituting a price-quantity strategy curve.
KIEE International Transactions on Power Engineering
/
v.4A
no.4
/
pp.243-253
/
2004
As deregulation evolves, pricing electricity becomes a major issue in the electric power industry. Participants in the competitive marketplace are able to improve their profits substantially by effectively pricing the electricity. In this paper, game theory is applied to analyze price-clearing in the generation bidding competition with the competition modeled as the non-cooperative and complete information game. The result of this analysis can be useful in understanding spot price-clearing of electricity as well as GENCOs' strategic behavior in the competitive electricity market.
Korean Journal of Construction Engineering and Management
/
v.11
no.2
/
pp.94-105
/
2010
Recently, resettlement problems of low income groups in the urban regeneration area have been issued in Korea because they have no capability to purchase (or lease) redeveloped housing (or apartment). There are several approaches for supplying affordable housing and one of these is the bidding system which can reduce construction cost. However, the lowest bidding system has many problems such as dumping and substandard quality. In this context, this study proposed bidding system based on technical proposal applying the concept of the lowest total combined bid price for optimization of bid price, reduction of construction cost and period, and maintenance of suitable quality. This bidding system embraces the best value and cost plus time concept on the basis of an improved lowest price bidding system. It consists of the following components: work unit based, project unit based, and period reducing technical proposals. The proposed bidding system for determining bidders are designed to evaluate the adequacy of each technical proposal in the order of the combined minimum price in an effort to effectively optimize bid prices and reduce the construction periods, as well as to maintain a minimum appropriate quality.
KIEE International Transactions on Power Engineering
/
v.5A
no.4
/
pp.416-424
/
2005
At present, the Korean electricity industry is undergoing restructuring and the Cost Based-generation Pool (CBP) market is being operated in preparation of a Two Way Bidding Pool (TWBP) market. In deregulated electricity industries, an integrated power market simulator is one of the tools that can be used by market participants and market operators analyzing market behaviors and studying market structures and market codes. In this regard, it is very important to develop an electricity market simulator that reflects market code providing a market operation mechanism. This paper presents the development of an integrated market simulator, called the Power Exchange Simulator (PEXSIM), which is designed to imitate the Korean electricity market considering the various features of the market operating mechanism such as uniform price and constrained on/off payment. The PEXSIM is developed in VB.NET and composed of five modules whose titles are M-SIM, P-SIM, O-SIM, T-SIM and G-SIM interfacing the Access database program. To verify the features and the performance of the PEXSIM, a small Two Way bidding market with a 12-bus system and a One Way bidding market for generator competition will be presented for the electricity market simulations using PEXSIM.
KIEE International Transactions on Power Engineering
/
v.5A
no.2
/
pp.199-203
/
2005
This paper proposes the level of price cap in the TWBP(Two- Way Bidding Pool) market in Korea for which the draft of market design has been prepared by KPX. Max - GMCP(Maximum Generation Market Clearing Price) and APC(Administered Price Cap) would be separately applied as individual price caps for a normal period and a Price Capping period in TWBP. The level of price cap is determined for inducing optimal investment in the Korean Electricity Market considering the 'electricity resource baseline plan' published by the Korean government in 2002 for maintaining government-leading resource planning in Korea. In this regard, Max - GMCP is calculated from the equilibrium condition of investment based on reliability standard and fixed cost of the peaking plant. For verifying the propriety of the proposed price cap, this paper compares the proposed value with the estimated VoLL(Value of Lost Load) based on Korea's GDP(Gross Domestic Product).
Internet group buying systems have been widely used recently. In those systems, because the reserve price is provided by the buyer, the success rate can be decreased if the reserve price is set too low compared with the normal price. Otherwise, an unsuitable successful bid can be made if the reserve price is set too high based on inaccurate information. Likewise, the seller's providing too high a bid price can deteriorate his/her own successful bid rate, whereas a successful bid with too low a price may make no profit in the sale. Therefore, pricing agents that recommend adequate prices based on the past buying and selling history data can be helpful. In this paper, we propose two kinds of agents. One suggests reserve prices to buyers based on the past buying history database of the system. The other recommends bid prices to a seller based on the past bidding history data of the company using the cost accounting theory. Through performance experiments, we show that the successful bid rate can increase by preventing buyers from making unreasonable reserve prices. Also, we show that, for the seller, the rate of successful bids with appropriate profits can increase. Using the pricing agents, we design and implement an XML-based group buying system.
The purpose of this study is to suggest policies to improve the price escalation system in a construction contract through a Policy Delphi technique. The Delphi, including two times questionnaires and a group discussion, was conducted by joining 14 experts. Also, the escalation provisions of various countries were examined. Results of the Delphi showed that the minimum fluctuation rate for price escalation was desirable at a level of 3%. To compute the fluctuation rate, calculating the price fluctuation of overall articles was more desirable than using price indices. A bidding date was more reasonable as the initial date of change in price. Losses caused by price change should be shared between contractor and owner; therefore a deduction rate should be introduced in price escalation. Meanwhile, overhead and profit should be adjusted in proportion to the fluctuation rate; but advance payment or the delayed construction amount should be deducted from the adjusted amount.
International conference on construction engineering and project management
/
2022.06a
/
pp.238-244
/
2022
Civil projects are associated with many uncertainties because they involve a long duration, many resources, a large area, and many supply chains. Therefore, the price of a civil project is not simply proportional to the quantity and unit price of the item but has a variable value, including uncertainty risk. This study investigates the influence of the uncertainty factors in the pre-bid clarification document on bid price formation during the project bidding phase. To this end, civil projects from the California Department of Transportation (Caltrans) were used as research data. This study randomly selected fifty sample data from each of twelve counties from 2008-to 2020: six hundred. The authors observed that each project sample had 0 to n query cases due to uncertainty. Then, this study examined the project uncertainty cases and categorized them into the following four uncertainty factors: 'conflict' (UF1), 'impossibility' (UF2), 'lack' (UF3), and 'missing' (UF4). Under the extracting process, the cases are classified into four uncertainty factors. With the project not containing any uncertainty factors as a control group, the project containing these uncertainty factors was designated as an experimental group. After comparing the bidder's price, the experimental group's bid price was higher than the control group's. This result suggests that uncertainty factors in bid documents induce bidders to set a high bid price as a defense against uncertainty.
The objective of this study was to investigate the existence of starting point bias in the bidding game contingent valuation elicitation technique when determining willingness to pay (WTP) for improving the qualify of running water in Seoul and its vicinity. Of all existing contingent techniques, the bidding game most closely mimics the normal price taking behavior in local markets. Three different starting points (low, medium and high) were used to determine WTP and the existence of starting point bias in the meanwhile respectively. The respondents were randomly assigned to the three different starting point groups in order to ensure homogeneity, so that any variation seen in WTP could be attributed to the starting point effects. And a pretested interviewer-administered questionnaire used to elicit WTP. Non-parametric test and the logit model were used to analyze the data for evidence of starting point bias. In this instance, the high starting point group had a high WTP, and low starting point group had a low WTP. This means there exist starting point bias in estimating WTP by bidding game in this instance. This finding might signal that people may actually be making up their minds on the maximum amount they are willing to pay for running water service as a bidding iterating is going on and is influenced by the starting point used in the bidding game. The problem of slaking point bias can be avoided if the respondent is asked directly for the maximum WTP without payment cards or a bidding game. But such a question is perceived as being very difficult to answer and this leads to problems of non-response and being unrealistic.
Journal of the Korea Institute of Building Construction
/
v.8
no.6
/
pp.155-160
/
2008
The BTL project, 4 years since its operation. has benchmarked the PFI Project in Japan and has been introduced. Given the evaluation step to select a preferred bidder, in a technological factor, the basic plans are corrected and complemented, whereas in a price factor, the low price bidding system is being enforced. There is concern that how to select preferred bidders and how to operate project costs during operation and management period may be problematic. Thus, in this study, using the Analytic Hierarchy Process, the method of deciding the priority to select preferred bidders in an early stage of the project and the evaluation model to evaluate the validity of BTL project expenses in process of project enforcement are established. Targeting the group composed of experts who have experiences in the BTL project. Then, the levelling of evaluation factors and grouping have been carried out as following : LCC analysis and disbursement for government including two more detailed factors.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.