A Case Study on BIM Operating and Performance Measurement in Construction Phase (시공현장 BIM 운영 및 성과측정을 위한 사례분석)

  • Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.5 no.2
    • /
    • pp.1-11
    • /
    • 2015
  • Despite a lot of research on BIM, there is no quantitative study to measure accurately the performance of BIM coordination service. Thus, this study suggested method to measure the performace of BIM coordination services, applying queueing models in the field of management science. To analyze queuing system of BIM coordination services, a group of BIM coordinator were selected. Through focus group interviews with experts were used in the analysis to derive mean arrival rate(${\lambda}$), mean service rate(${\mu}$) of BIM coordination services. Single-server queuing model(M/M/1), multiple server queuing model(M/M/s) is utilized for the BIM coordination services performance measurement in construction phase. This study has significant quantitative performance measurement approaches that can be utilized in the decision-making for the improvement of the BIM coordination services and to support the review of the alternatives accordingly. But There is a limit but it is difficult to take into account the increase or decrease of the cost of alternatives according to the review.

BIM System Development for Conceptual Design and Pre-Feasibility Study of Cable-Stayed Bridge (BIM 기반 사장교의 개념설계 및 예가분석 시스템 개발)

  • Chun, Kyoung-Sik;Park, Won-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.10
    • /
    • pp.7204-7210
    • /
    • 2015
  • This paper has developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous cable-bridge with 2-pylons. First of all, we'd analyzed the design information (structural design report, blueprint and quantity) of the existing cable-stayed bridges and derived the design variables of cable-stayed bridges. We developed the BIM wizard that generates a cable-stayed bridge model parametrically based on derived design variables. The principle material quantities of cable-stayed bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. Then, we can estimate the construction cost in relation to its quantities and unit cost of cable-stayed bridge. In a result, we have established the system that the construction cost can be estimated more specific than the conventional method (construction estimates per meter or square meter). We hereby will be able to review various alternatives as soon as possible in bidding process.

Estimation of Landfill Gas Utilization in Old Landfill (사용 종료 매립지의 가스 활용 방안 평가)

  • Lee, Cheol-hyo;Jeon, Yeon-ho;Lee, Chae-young;Kim, Kyung;Lee, Hwan;Lee, Nam-hoon
    • Journal of the Korea Organic Resources Recycling Association
    • /
    • v.8 no.2
    • /
    • pp.154-160
    • /
    • 2000
  • Landfill gas (LFG) utilization in old landfill was estimated using LFG models. The results showed that Scholl Canyon model best described the LFG generation. LFG was extracted more than the amount of natural production which caused air inflow from outside that resulted in dilution of methane concentration and increase of oxygen concentration. It was negative for the LFG utilization. Therefore, to use LFG, the plan of stabilization by LFG extraction should be ineffective. The use of LFG will have no problem if LFG is extracted less than the amount of natural production which was estimated based on modeling. At 8 years elapsed from landfill, now, the amount of natural landfill gas production was decreased sharply. The plan for using LFG from old landfill is feasible if LFG is used for the less than the amount of natural production as a small scale even though for the aspect of efficiency, it was less economic than use of LFG just after closing landfilling and it was helpful for stabilization of landfill by LFG extraction.

  • PDF

Interface Management Practices for Minimizing Design Change - Focusing on the Case Study - (설계간섭 최소화를 위한 인터페이스 관리방안 - 사례현장 적용 내용을 중심으로 -)

  • Ahn, Sanghyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.22-29
    • /
    • 2013
  • As construction projects are getting larger, more complex and specialized, the size and scale of the structures are increasing and large-scale projects with multiple participants involved have continuously been ordered. Due to the nature of a large-scale construction project, when there are interferences and conflicts in process, schedule and area among project participants, the project requires more time and efforts to resolve the issues as it progresses further. This study suggests the interface management model that is time-saving and physically beneficial in solving interface issues based on case study. This study provides a practical management model including the organization of interface consultative group, checklist preparation, LIST management and PMIS application, which will be useful for the construction sites seeking effective know-how to manage design interferences and changes.

Lateral Behavior of Sin811e and Group Piles in Sand (사질토 지반에서 말뚝의 수평거동)

  • 김영수;김병탁
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.10a
    • /
    • pp.3-44
    • /
    • 1999
  • This paper discusses the lateral behavior of single and group piles in homogeneous and non-homogeneous(two layered) soil. In the single pile, the model tests were conducted to investigate the effects on ratio of lower layer height to embedded pile length, ratio of soil modules of upper layer to lower layer, boundary rendition of pile head and tip, embedded pile length, pile construction condition, ground condition with saturate and moisture state in Nak-Dong river sand. Also, in the group pile, the model tests were to investigate the effects on spacing-to-diameter ratio of pile, pile array, ratio of pile spacing, boundary condition of pile head and tip, eccentric load and ground condition. The maximum bending moment and deflection induced in active piles were found to be highly dependent on the relative density, pile construction condition, boundary condition of pile head and tip. Based on the results obtained, it was found that the decrease of lateral bearing capacity in saturated sand was in the range of 31% - 53% as compared with the case of dry sand. Also, in the group pile, a spacing-to-diameter of 6.0 seems to be large enough to eliminate the group effect for the case of relative density of 61.8%, and 32.8%, and then each pile in such a case behaves essentially the same as a single pile. In this study, the program is developed by using the modified Chang method which used p - y method and the exact solution of governing equation of pile and it can be used to calculate the deflection, bending moment and soil reaction with FDM in non-homogeneous soil. In comparing the modified Chang method with field test results, the predict results shows better agreement with measured results in field tests.

  • PDF

A Study on the Prediction Model of the Warship Construction Period through Statistical Analysis (통계적 분석기법을 통한 함정 건조기간 예측모델에 관한 연구)

  • Choi, Daewook;Ma, Jungmok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.3
    • /
    • pp.497-502
    • /
    • 2020
  • For the Navy to acquire the desired vessels in time, it is necessary to plan the schedule accurately for warships. On the other hand, until now, there has been only a subjective prediction of the period of warship construction through a survey by a group of experts. No academic studies have been conducted based on actual data. Therefore, this study presents a model for predicting the construction period of a warship through linear regression based on actual data. Experts first identified the factors that can affect the warship construction period. Actual data of the factors were collected, and regression analysis was performed to estimate the ship construction period. As a result, the key factors selected that influence the construction period of a ship were the number of operational test items, number and type of equipment, and the number and type of R&D equipment. The resulting regression model revealed 96.5% accuracy in terms of internal validity.

Role of Scientific Reasoning in Elementary School Students' Construction of Food Pyramid Prediction Models (초등학생들의 먹이 피라미드 예측 모형 구성에서 과학적 추론의 역할)

  • Han, Moonhyun
    • Journal of Korean Elementary Science Education
    • /
    • v.38 no.3
    • /
    • pp.375-386
    • /
    • 2019
  • This study explores how elementary school students construct food pyramid prediction models using scientific reasoning. Thirty small groups of sixth-grade students in the Kyoungki province (n=138) participated in this study; each small group constructed a food pyramid prediction model based on scientific reasoning, utilizing prior knowledge on topics such as biotic and abiotic factors, food chains, food webs, and food pyramid concepts. To understand the scientific reasoning applied by the students during the modeling process, three forms of qualitative data were collected and analyzed: each small group's discourse, their representation, and the researcher's field notes. Based on this data, the researcher categorized the students' model patterns into three categories and identified how the students used scientific reasoning in their model patterns. The study found that the model patterns consisted of the population number variation model, the biological and abiotic factors change model, and the equilibrium model. In the population number variation model, students used phenomenon-based reasoning and relation-based reasoning to predict variations in the number of producers and consumers. In the biotic and abiotic factors change model, students used relation-based reasoning to predict the effects on producers and consumers as well as on decomposers and abiotic factors. In the equilibrium model, students predicted that "the food pyramid would reach equilibrium," using relation-based reasoning and model-based reasoning. This study demonstrates that elementary school students can systematically elaborate on complicated ecology concepts using scientific reasoning and modeling processes.

An Exploratory Analysis of IT Implementation: A Case Study of Construction Companies (건설기업 정보화 추진 방안: 대형 건설사 사례를 중심으로)

  • Han, Jeong-Sook;Kim, Young-Shin;Lee, Seung-Chan
    • Information Systems Review
    • /
    • v.6 no.2
    • /
    • pp.209-225
    • /
    • 2004
  • This study shows the field of construction which was less developed in the aspect of information system in comparison to other areas needs to introduce construction information system and suggests it can make more value linked with company performance through the system. For the first step, it emphasizes the integrated enterprise approach not optimization of each sector in a company. This paper extracts the current issues of construction information from the core process of construction area and implies a driving plan and the future development plan for construction information. Antecedent studies for this drew the information structure model and the construction information-driving model of a construction company. Hence, case studies with management companies that implemented the construction information system successfully tested validity. This research brings the cases of PMS, the integrated finance system, and CRM system as successful ones.

FE validation of the equivalent diameter calculation model for grouped headed studs

  • Spremic, Milan;Pavlovic, Marko;Markovic, Zlatko;Veljkovic, Milan;Budjevac, Dragan
    • Steel and Composite Structures
    • /
    • v.26 no.3
    • /
    • pp.375-386
    • /
    • 2018
  • Existing design codes for steel-concrete composite structures give only general information about the shear connection provided by headed studs in group arrangement. Grouting of the openings in prefabricated concrete slabs, where the grouped headed studs are placed in the deck pockets is alternative to cast-in-place decks to accomplish fast execution of composite structures. This paper considers the possibility to reduce the distance between the studs within the group, bellow the Eurocode limitations. This may lead to increased competitiveness of the prefabricated construction because more studs are placed in the group if negative effectives of smaller distances between studs are limited. The main purpose of this work is to investigate these limits and propose an analytical calculation model for prediction of the shear resistance of grouped stud arrangements in the deck pockets. An advanced FEA model, validated by results of push-out experiments, is used to analyze the shear behavior of the grouped stud with smaller distance between them than recommended by EN 1994-1. Calculation model for shear resistance, which is consistent with the existing Eurocode rules, is proposed based on a newly introduced equivalent diameter of the stud group, $d_G$. The new calculation model is validated by comparison to the results of FE parametric study. The distance between the studs in the longitudinal direction and the number of stud rows and columns in the group are considered as the main variables.

분포매개정수를 갖는 원자로의 최적제어 2

  • 지창열
    • 전기의세계
    • /
    • v.29 no.4
    • /
    • pp.256-259
    • /
    • 1980
  • A singular pertubation theory is applied to obtain an approximate solution for suboptimal control of nuclear reactors with spatially distributed parameters. The inverse of the neutron velocity is regarded as a small perturbing parameter, and the model, adopted for simplicity, is a cylindrically symmetrical reactor whose dynamics are described by the one group diffusion equation with one delayed neutron group. The Helmholtz mode expansion is used for the application of the optimal theory for lumped parameter systems to the spatially distributed parameter systems. An asymptotic expansion of the feedback gain matrix is obtained with construction of the boundary layer correction up to the first order.

  • PDF