When constructing tunnels, it is important to understand structural, geological and hydrogeological conditions. Geumgeong tunnel that has been constructed in Mt. Geumjeong for the Gyeongbu express railway induced rapid drawdown of groundwater in the tunnel construction area and surroundings. This study aimed to analyze groundwater flow system and baseflow using long-term monitoring and groundwater flow modeling around Geumgeong tunnel. Field hydraulic tests were carried out in order to estimate hydraulic conductivity, transmissivity, and storativity in the study area. Following the formula of Turc and groundwater flow modeling, the annual evapotranspiration and recharge rate including baseflow were estimated as 48% and 23% compared to annual precipitation, respectively. According to the transient modeling for 12 years after tunnel excavation, baseflow was estimated as $9,796-9,402m^3/day$ with a decreasing tendency.
In this paper, a reliability-groundwater flow program is developed by coupling the 3-D finite element numerical groundwater flow program with first and second order reliability program. The numerical groundwater program developed called DGU-FLOW is verified by solving the examples of groundwater flow through the underground excavation and comparing the results with those of commercial MODFLOW 3D programs. Reliability routine of the program is also verified by comparing the probability of failure of the flow model from FORM/SORM with that of Monte-Carlo Simulation. The difference of out-flux and total head calculated near the bottom of the excavation using the deterministic 3D groundwater flow and the commercial programs was negligible. The reliability analysis of the groundwater flow showed that the probability of failure from the first and second order reliability method are quite close that of Monte-Carlo Simulation. Therefore, the developed program is considered effective for analyzing the groundwater flow with uncertainty in hydraulic conductivity of the soils.
대수층시험에서 관측공 없이 단공으로 양수시험을 시행하는 경우 일반적으로 저류계수가 실제보다 크게 산정된다. 이를 보정하려면 유효우물반경을 계산하여 이를 가상의 관측정 거리로 입력하는 방법으로 시간-수위강하량 자료를 해석하여야 한다. 유효우물반경의 계산은 단계양수시험에 의하거나 또는 스킨계수 공식을 적용하여 실행할 수 있다. 그러나 이 두 가지 방법 모두 조사대상 대수층의 저류계수를 추정하여 대입하는 시행착오 방식으로서 현장 적용성은 다소 부족하다. 본고에서는 국내에서 시행된 다수의 양수시험 자료를 바탕으로, 단공시험 저류계수를 독립변수로 하는 유효우물반경 산정공식을 유도하였다. 본 연구에는 양수정과 관측정에서 동시에 수위강하를 측정한 136개소의 양수시험자료가 이용되었다. 먼저, 양수정 자료만으로 산출된 저류계수가 관측정 자료로 구해진 저류계수와 같은 값을 가질 수 있는 관측거리 즉, 유효우물반경을 구하였으며, 이 유효우물반경과 양수정에서 구한 저류계수의 상관관계를 바탕으로 단공시험에서 유효우물반경 산정에 사용할 수 있는 회귀공식을 얻을 수 있었다.
균열암반내에 시추된 7개의 양수정에서 양수시험을 실시하였다, 여기에서 각 양수율에 따른 수위강하값을 구하였으며, 비평형상태하에서의 단계양수시험은 Cooper-Jacob의 방법에 의해 양수시간을 보정하였다 양수정에서의 대수층 손실상수, 우물손실상수 및 우물손실지수(n)의 산출은 최소제곱법(method of the least square)을 이용한 회귀분석 방법을 이용하였으며, n값의 범위는 1.65∼6.48로 산출되었다. 균열암반내에 시추된 양수정의 우물손실은 케이싱이나, 시추시 발생되는 공벽의 공극감소 등의 영향보다는 방사상흐름에 따른 양수정부근에서의 난류에 의한 영향이 대부분일 것으로 해석된다. 또한 이 난류는 레이놀즈의 수(Reynolds number)에 좌우되는데, 여기에서 암반대수층내의 균열 특성이 유체의 속도를 지배하므로 정확한 n값의 산출은 암반대수층을 이해하는데 중요한 인자가 될 것이다.
During tunnel excavation, drawdown of groundwater table or discharge from tunnel faces may not only reduce stability of tunnel and work efficiency but cause environmental problems. We have investigated the applicability of electrical resistivity survey for the establishment of the monitoring system for groundwater behavior and detecting flow channel of groundwater during tunnel excavation. The groundwater level was continuously measured at several points for 1 year. Survey was conduted at every 3 months using preinstalled electrical resistivity cables on site. The results show that observed changes in resistivity ratios in the area can be explained with observed changes in groundwater level. Thus, we believed that electrical resistivity analysed together with groundwater data can be applied for the monitoring of groundwater in tunnel area.
거물기초굴착을 위한 암반층의 지하수위를 효과적으로 낮추기 위하여 3개의 군정을 설치하고 인공수압파쇄를 실시한 결과 각 우물의 산출량은 29%, 42% 및 110% 증가하였으나, 동시험시 양수시 비양수량이 단정 양수시와 비교하여 추가 수위강하 효과에도 불구하고 모두 소폭으로 감소하여 3개 우물의 파쇄대가 수리적으로 서로 연결되었음을 확인하였다. 가장 먼 거리에 있는 기존의 지질구조(단열계) 방향으로 인공파쇄대가 가장 크게 확장되어 성공적으로 지하굴착을 수행할 수 있었다. 다른 사례로는 생활용수 양수량 증대를 목적으로 시행한 사례로 산출성이 약 28% 증대되었다.
균열암반 이중대수층 (1대수층과 2대수층)내 지하수흐름을 모식화한 프락탈모델이 개발되었다 이때 양수정내 지하수유입은 1대수층에서만 유래한다. 본 모델은 우물저장과 우물손실을 고려할 수 있어서 양수초기의 지하수위 변화를 정확하게 파악할 수 있는 잇점이 있다. 여러 가지 유동차원에 대해서, 1대수층의 수리전도도가 2대수층보다 더 크고, 비저유율이 2대수층보다 더 낮은 경우 (case 1)와 1대수층의 수리전도도가 2대수층보다 더 작고, 비저유율이 2대수층보다 더 큰 경우 (case 1)에 대해서 표준곡선을 작성하였으며, 이들 곡선의 특성을 분석하였다. 본 모델은 양수정과 관측정의 수위하강이 서로 다른 거동을 보여주는 양수시험자료를 해석하는데 유용하게 쓰일 수 있을 것이다.
Two-layer aquifer system with fractional flow dimension is composed of contiguous two layers: Layer 1 (lower layer) and Layer 2 (upper layer) with different permeability and specific storage each other. For this aquifer system, we assume that groundwater flow originates only from Layer 1 on the pumping well. The aquifer system considers wellbore storage and skin effects on the pumping well. Dimensionless drawdown curves for different flow dimensions are analyzed for different lambda (λ, crossflow coefficient) values, kappa ($textsc{k}$, permeability ratio between Layer 1 and Layer 2) values and omega ($\omega$, storativity ratio between Layer 1 and Layer 2) values. The curves for Layer 1 and Layer 2 show characteristic trend each other.
Visual MODFLOW, a three dimensional groundwater flow model, was used to analyze effects of a weir construction in an alluvial stream on the nearby groundwater flow system. A hypothetical conceptual model was developed to investigate how the groundwater level and the water budget could change after a weir construction depending on the location of tributary streams. A site example, dealing with the Juksan weir installed in the Yeongsan River, was also demonstrated to predict the effects of the weir construction. Model results show that impacts of a weir construction on the groundwater flow system greatly vary depending on how far a tributary is located and whether it is located downstream or upstream from the weir. Therefore, consideration of the location of tributaries in planning the location of a weir could effectively minimize the impacts of a weir construction on the groundwater flow system. It is also demonstrated that model results are highly dependent upon how the model is dealing with small tributaries and agricultural drainage channels, which can be easily found nearby the main streams, acting as major water bodies for groundwater discharge. The model for the Juksan area shows that the weir construction will change the direction of groundwater flow in some areas, leading to changes of groundwater quality and interaction of the Yeongsan River to the aquifer from a gaining to a losing stream. The model also predicted the areas where rise of groundwater level caused by the Juksan weir could adversely affect plant growth, and thereby suggested installing new drainage channels as a countermeasure to drawdown the groundwater level.
국가지하수 관측망의 314개 관정에 대한 양수시험 자료를 분석하여 국내 암반 및 충적대수층이 나타내는 수리전도도 분포, 투수량계수와 비양수량과의 관계, 양수 및 회복시험 유형에 관한 통계 자료를 제시하였다. 충적대수층의 평균 수리전도도는 1.26m/day로 암반대수층(0.076 In/day)보다 약 17배 크게 나타났다. 암반대수층 수리전도도의 평균과 분산도는 국외의 결정질 균열 암반과 거의 일치하였으며, 암종별 평균값은 퇴적암, 화성암, 변성암 순으로 뚜렷한 차이를 보였다. 투수량계수 분석 결과 국가지하수 관측망의 지하수는 암반을 통하여 $32\%$, 충적층을 통하여 $68\%$ 정도가 흐르는 것으로 나타났다. 회귀분석을 통하여 국가지하수 관측망의 대수층이 나타내는 비양수량과 투수량계수의 관계식을 제시하였다 양수 및 회복시험의 수위강하 양상에 따라 대수층의 유형을 $4\~5$개로 분류하여 각 유형이 나타내는 대수층의 특성을 분석하였다 국가지하수 관측망 대수층의 대부분$(83.7\%)$은 함양경계형을 보였으며, 관측소 인근의 하천, 암반 및 충적대수층의 수리적 연결에 의한 두 대수층간의 수직적인 지하수의 흐름, 자유면대수층에서 중력배수에 의해 발생하는 지연산출 등 다양한 공급원에 의하여 함양경계형이 나타난 것으로 분석되었다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.