• Title/Summary/Keyword: Ground condition prediction

Search Result 134, Processing Time 0.024 seconds

Suggestion of the Prediction Method about Upheaval Shape and Volume for SCP Construction (SCP 시공에 따른 융기토 형상과 체적의 예측기법 제안)

  • Jeong, Gyeong-Hwan;Park, Chan-Woo;Shin, Min-Sik;Hideo-Tsuboi;Mitsuo-Nozu;Lee, Sang-Jae
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.10a
    • /
    • pp.497-508
    • /
    • 2006
  • Busan-Geoje Fixed Link, total length of 8.2km, consist of bridge and immersed tunnel connects Gaduk island, Busan and Jangmokmyon, Geoje, in extension of the $58^{th}$ local road. The immersed tunnel, a total length of 3.7km within Busan-Geoje Fixed Link, was planed first timein domestic but the deep water depth like maximum of 50m with offshore conditions and the 35m thickness of soft clay layer under the immersed tunnel, migth be some problems like the differential settlement during or after works. So it was designed to install SCP(Sand Compaction Pile) column partially to improve the soft ground under the immersed tunnel. In this paper, it is presented to illustrate the design including ground condition under the immersed tunnel, improvement design, upheaval shape and ratio due to SCP test construction.

  • PDF

Prediction and Assessment on Consolidation Settlement for Soft Ground by Hydraulic Fill (준설매립 연약지반에 대한 압밀침하 예측 및 평가)

  • Jeon, Je-Sung;Koo, Ja-Kap;Oh, Jeong-Tae
    • Journal of the Korean Geotechnical Society
    • /
    • v.24 no.9
    • /
    • pp.33-40
    • /
    • 2008
  • This paper describes the performance of ground improvement project using prefabricated vertical drains of condition, in which approximately 10m dredged fill overlies original soft foundation layer in the coastal area composed of soft marine clay with high water content and high compressibility. From field monitoring results, excessive ground settlement compared with predicted settlement in design stage developed during the following one year. In order to predict the final consolidation behavior, recalculation of consolidation settlements and back analysis using observed settlements were conducted. Field monitoring results of surface settlements were evaluated, and then corrected because large shear deformation occurred by construction events in the early stages of consolidation. To predict the consolidation behavior, material functions and in-situ conditions from laboratory consolidation test were re-analyzed. Using these results, height of additional embankment is estimated to satisfy residual settlement limit and maintain an adequate ground elevation. The recalculated time-settlement curve has been compared with field monitoring results after additional surcharge was applied. It might be used for verification of recalculated results.

A Study on Prediction of Maximum Steering Torque of Tractor on Off-road (Off-road에서 트랙터의 최대 조타력 예측에 관한 연구)

  • Kim S.Y.;Lee K.S.;Lee S.S.;Lee S.B.;Lee J.W.;Park W.Y.
    • Journal of Biosystems Engineering
    • /
    • v.31 no.2 s.115
    • /
    • pp.81-87
    • /
    • 2006
  • In this study, a mathematical model was suggested to predict the maximum steering torque of a tractor on off-road. The model took into account the characteristics of soil, including the pressure-sinkage and the shearing characteristics as well as the primary design parameters of steering system of the tractor. The efficiency of the developed model was verified via comparison of the maximum steering torque predicted using the model with those measured from steering torque test. The results showed that the predicted maximum steering torques were in good agreement with the measured ones from the steering test on soft soil in which tractor is generally operated. Thus, we concluded that the model developed in this study could be used for prediction of maximum steering torque of a tractor.

Estimation of Optimum Pile length Using Various Prediction (다양한 예측기법을 이용한 현장타설말뚝의 최적길이 산정)

  • Choi, Young-Seok;Iim, Hyung-Joon;Song, Myung-Jun;Jang, Hak-Sung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.700-707
    • /
    • 2008
  • As plan connecting island to island or island to land is needed, a lot of long-span bridge is being designed lately in Southern part of Korea. With development of pile equipment, overhanging large-scaled concrete pile are adopted to foundation type of main tower or pylon. About the number of 15~30 group piles per tower foundation is designed to resist long-spaning super-structure load, but by restricted condition of site investigation cost, a few boring-hole tests are performed to identify sub-ground layers. Up to now, direct-curved method connecting two or three known boring logs and representative interval method are usually used to evaluate unknown depth and rock properties at locations where piles are constructed. Because this approach is not logical and so rough, much difference occurs between designed length of piles and real length of it. In this paper, using a lot of various prediction method(reciprocal distance method, inverse square distance method and kriging method etc.), we suggest optimum length of group piles.

  • PDF

Use of Groundwater recharge as a Variable for Monthly Streamflow Prediction (월 유출량 예측 변수로서 지하수 함양량의 이용)

  • Lee, Dong-Ryul;Yun, Yong-Nam;An, Jae-Hyeon
    • Journal of Korea Water Resources Association
    • /
    • v.34 no.3
    • /
    • pp.275-285
    • /
    • 2001
  • Since the majority of streamflow during dry periods is provided by groundwater storage, the streamflow depends on a basin moisture state recharged from rainfall during wet periods. This hydrologic characteristics dives good condition to predict long-term streamflow if the basin state like groundwater recharge is known in advance. The objective of this study is to examine groundwater recharge effect to monthly streamflow, and to attempt monthly streamflow prediction using estimated groundwater recharge. The ground water recharge is used as an independent variable with streamflow and precipitation to construct multiple regression models for the prediction. Correlation analysis was performed to assess the effect of groundwater carry-over to streamflow and to establish the associations among independent variables. The predicted streamflow shows that the multiple regression model involved groundwater recharge gives improved results comparing to the model only using streamflow and precipitation as independent variables. In addition, this paper shows that the prediction model with the effect of groundwater carry-over taken into account can be developed using only precipitation.

  • PDF

Prediction of transverse settlement trough considering the combined effects of excavation and groundwater depression

  • Kim, Jonguk;Kim, Jungjoo;Lee, Jaekook;Yoo, Hankyu
    • Geomechanics and Engineering
    • /
    • v.15 no.3
    • /
    • pp.851-859
    • /
    • 2018
  • There are two primary causes of the ground movement due to tunnelling in urban areas; firstly the lost ground and secondly the groundwater depression during construction. The groundwater depression was usually not considered as a cause of settlement in previous research works. The main purpose of this study is to analyze the combined effect of these two phenomena on the transverse settlement trough. Centrifuge model tests and numerical analysis were primarily selected as the methodology. The characteristics of settlement trough were analyzed by performing centrifuge model tests where acceleration reached up to 80g condition. Two different types of tunnel models of 180 mm diameter were prepared in order to match the prototype of a large tunnel of 14.4 m diameter. A volume loss model was made to simulate the excavation procedure at different volume loss and a drainage tunnel model was made to simulate the reduction in pore pressure distribution. Numerical analysis was performed using FLAC 2D program in order to analyze the effects of various groundwater depression values on the settlement trough. Unconfined fluid flow condition was selected to develop the phreatic surface and groundwater level on the surface. The settlement troughs obtained in the results were investigated according to the combined effect of excavation and groundwater depression. Subsequently, a new curve is suggested to consider elastic settlement in the modified Gaussian curve. The results show that the effects of groundwater depression are considerable as the settlement trough gets deeper and wider compared to the trough obtained only due to excavation. The relationships of maximum settlement and infection point with the reduced pore pressure at tunnel centerline are also suggested.

A Study on the Behavior of the Retaining Walls with the Improved Top-Down Support System using the Building Structure (건축 구조체를 이용한 개량 역타공법 적용시 흙막이 벽체의 거동 연구)

  • Chun, Byung-Sik;Roh, Bae-Young;Do, Jong-Nam;Rew, Woo-Hyun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1666-1672
    • /
    • 2008
  • In this study, it collected and analyzed a construction case of the improved top-down support system application field on a case by case retaining wall method. The behavior of horizontal displacement was analyzed according to retaining wall type after reviewing a design stage and estimated horizontal displacement under the construction. The study results showed that it is judged stable until excavation termination irrelevant to a retaining wall method at the improved top-down support system application. It is judged that the settlement of behind ground can minimize because the retaining wall head displacement also behave stably. It was compared the predicted horizontal displacement in design and the measured horizontal displacement acquired through a measurement by using Elasto-Plastic analysis program. The comparison results showed that a similar horizontal displacement was predicted within stability standard irrelevant to a retaining wall method. So, it is decided that the advanced prediction is reasonable by Elasto-Plastic analysis in design applied the improved top-down support system. In the case of the ground anchor method application under a same condition, it is decided that a horizontal displacement will more increase than the improved top-down support system is applied. If a section condition is same, it was decided that to apply top-down support system is more stable than that.

  • PDF

Flood Forecasting for Pre-Release of Taech'ong Reservoir (대청댐 예비 방류를 위한 홍수 예보)

  • Lee, Jae-Hyeong;Sim, Myeong-Pil;Jeon, Il-Gwon
    • Water for future
    • /
    • v.26 no.2
    • /
    • pp.99-105
    • /
    • 1993
  • A practical flood forecasting model(FFM) is suggested. The output of the model is the results which the initial condition of meteorological parameters and soil moisture are projected on the future. The physically based station model for rainfall forecasting(RF) and the storage function model for runoff prediction(RP) are adopted respectively. Input variables for FFM are air temperature, pressure, and dew-point temperature at the ground level and the flow at the rising limb(FRL). The constant parameters for FFM are average of optimum values which the past storm events have. Also loss rate of rainfall can predicted by FRL.

  • PDF

Calculation of Consolidation Settlement considering Primary and Secondary Settlement (1차와 2차 침하를 고려한 압밀침하량 계산식의 제안)

  • Lee, Dal-Won;Jeong, Seong-Gyu
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2003.10a
    • /
    • pp.159-162
    • /
    • 2003
  • In this study, it was proposed that a modified equation for estimating consolidation settlement on soft clay ground, which separate total settlement into primary and secondary settlement equation. The settlement by the proposed equation and by the measured settlements from laboratory model test was compared and verified for its application. It was appeared that the proposed equation from the laboratory model test approached to be more realistic comparing to the result of Terzaghi's equation. From the above application, it was concluded that the final settlement prediction by the Hyperbolic, Asaoka methods is needed to measure the initial period of settlement but the proposed equation could be much applicable in the lacking condition of measured data of the initial period.

  • PDF

Computational Analysis of the Heat/Moisture Characteristics and Heat Load of Underground Structures (열.수분 동시이동 모델을 이용한 지하구조물 및 주변지반의 열수분성상 예측에 관한 연구)

  • Park, Kyung-Soon;Son, Won-Tug
    • Proceedings of the SAREK Conference
    • /
    • 2008.06a
    • /
    • pp.901-905
    • /
    • 2008
  • This study was conducted to clarify the heat load characteristics and heat and moisture behavior of underground structures. The authors achieved this by carrying out a numerical analysis using simple heat diffusion and simultaneous heat and moisture transfer equations based on measurement data. This paper presents the results of a numerical analysis on the heat load characteristics and heat and moisture behavior of an underground basement and its surrounding ground under a condition of internal heat generation. The authors found it difficult to predict the heat behavior and heat load of the underground basement by simple heat diffusion alone. Accurate prediction of the thermal environment and heat load requires careful consideration of the influences of moisture and precipitation

  • PDF